ABCDEFGHIJKLMNOPQRSTUVWXYZAAABACADAEAFAGAHAIAJAKALAM
1
OMG Data! Project
2
Working rates
3
4
Irrigation
EXCLUDING: infrastructure work (e.g. putting in ringmain), season set-up (e.g. putting out fixed-position sprinklers),
5
bed prep work (e.g. laying drip tape), maintenance (e.g. fixing leaks), and first watering post-planting or -sowing
6
INCLUDING:
all labour time in a week – e.g. checking moisture levels, setting timers, turning on / off taps, moving irrigation kit (sprinklers, hoses etc.), hand-watering
7
8
Wk 31: 29 Jul-4 AugWk 32: 5-11 AugWk 33: 12-18 AugWk 34: 19-25 AugAverage over the 4 weeks
9
Total cultivated area in your rotation (inc green manures) (ha) Description of irrigation set-upTime spent irrigating this week (mins)What you were mainly doing in that timeWeather notesMins/haTime spent irrigating this week (mins)What you were mainly doing in that timeWeather notesMins/haTime spent irrigating this week (mins)What you were mainly doing in that timeWeather notesMins/haTime spent irrigating this week (mins)What you were mainly doing in that timeWeather notesMins/haMins/ha
10
Farm 10.224Tunnels: permanent overhead sprinklers. Temporary drip line or trickle irrigation depending on crop. Outdoor: fixed overhead rotary sprinklers5Turning valves on and offSunny222Turning valves on and offHeavy thundery showers, warm and humid.92Turning valves on and offWet with the odd sunny day93Turnng valves on and offCloudy but dry1313
11
Farm 20.21rain harvested to two large tanks from large green house. Then pumped to outlets all over site. Some drip fed irrigation, gravity fed from IBC containers that capture water from tunnels.Appro 360Manually watering with hose- propagation and tunnels. Moving sorinkler hosesApprox 360Moving sprinkler hoses, manually watering with hoseApprox 360moving sprinkler hoses, manually watering with hose
Approx 360moving sprinkler hoses, manually watering with hose
12
Farm 30.3Mains water
Tunnels: overhead sprinklers and drip lines (3/bed) with a timer
Outsite: Drips on 6 beds, one sprinkler covering circle of 8-10m diametre plus 100m hose with lance
10turning drips on inside tunnel
moving hose around for outdoor drip line
Wet, damp, cloudy week8
13
Farm 41Borehole water. Tunnels: 2 drip lines per 1.2m wide bed in 2x 30m tunnels, manual watering with hose and lance in 2x small tunnels. Field: 2 x rotary sprinklers used in series setup that cover 8x 1.5m beds/ 324m2 approx. NB: pressure too low to have 2 tunnels and 2 field sprinklers on at once. 200connecting hose to irrigation in tunnels, hand watering/ misting Aubergine, peppers, fennel, celery and cucmber. Connecting hoses in field and moving 2x rotary sprinklers around field. Walking from field to tunnels.sunny, 0.5mm rainfall200160as week 31 but 2 days less field watering due to rain.wet, stormy, humid, 5mm rain16050Turning drips on in tunnel daily, walking from field to tunnel to turn off. Hand watering/misting certain tunnel crops daily. 1 x Polytunnel skin blown in so no need to mist that tunnel this week!wet, stormy, high winds gusts of 60mph, 35mm rain50121.5Reskinned 1x large tunnel so watering as week 31.warm, sunny, avg 22 degrees122133
14
Farm 50.54Borehole + mains.
Indoor: permanent overhead sprinklers + temporary drip lines (for certain crops). Outdoor: fixed position sprinklers set up at start of the season
0Wet1010Bit of tunnel watering - turning on tapsWet!1910Bit of tunnel watering - turning on tapsWet!0Everywhere still sodden09
15
Farm 60.6Tunnels: permanent overhead sprinklers or driplines (interchangeable). Field - by hand/moveable driplines available. Herb beds: by hand. Mains water by tap, battery timers on tunnels. Rainwater in butts available for top up of herb beds etc.5Top up watering polytunnel edges new basil plantedSunny/mixed80Mixed00Mixed0Mixed02
16
Farm 72.9Tunnels: permanent o/h used to regulate humidity, drip tape for overnight irrigation. Field Crops: rotary o/h irrigators on sleds & 3/4" hose dragged around. Prop: lance to benches, permanent o/h to standing out plants
17
Farm 82.4Rain water tank topped up with mains water40
checking beds, turning taps on moving hoses
1745checking beds,moving bits of hose to connect to irrigation, turning taps on and off1940
checking beds, turning taps on moving hoses
40
checking beds, turning taps on moving hoses
1717
18
Farm 9
19
Farm 101.2Low tunnels all on timers. Outdoor blocks - courgettes, brassicas, salad all set up with timers too.green manure 4000m2 no water
drip pipe 4000 m2 not activley managed over head 4000 the time taken. Orbit Dual Outlet Tap Timer£35 ish netafim drip net 20cm .6ltph 1150m for £300
82moving irrigators out side. 12 location680wet00wet010819
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100