Measured for under ground water tank.
3
Volume 250,000 M³.
4
S/NDESCRIPTION OF WORKQTYUNITRATEAMOUNT
5
6
EXCAVATION AND EARTHWORK
7
8
AExcavate pit for water tank commencing at formation level and not exceeding 8.50 metres deep. 348 CM 25,000.00 8,700,000.00
9
10
Reiforced concrete (1:2:4) including vibrating all around
11
12
BFoundations basement slab. 19.0 CM 350,000.00 6,650,000.00
13
14
CBeams 1 CM 350,000.00 350,000.00
15
16
DColumn 1 CM 350,000.00 350,000.00
17
18
EMain slab 10 CM 350,000.00 3,500,000.00
19
20
FReinforced wall. 34 CM 350,000.00 11,900,000.00
21
22
23
24
Reinforcement
25
High tensile hot rolled deformed steel bar reinforcement to BS 4449:1997
26
27
G16mm Bar 190 KG 3,500.00 665,000.00
28
29
H12mm Bar 3,500 KG 3,500.00 12,250,000.00
30
31
I10mm Bar 750 KG 3,500.00 2,625,000.00
32
33
J8mm Bar 650 KG 3,500.00 2,275,000.00
34
35
Sawn formwork to
45
KReinforced wall ,Rings beams, columns and main slab 402 SM 30,000.00 12,060,000.00
46
50
Collection 161,325,000
51
52
53
S/NDESCRIPTION OF WORKQTYUNITRATEAMOUNT
54
55
Supply and installlation pipe including fitttings and anchorage.
56
57
KInlet pipe GS DN 50mm with ball valve L /sum 1,500,000.00
58
59
LWithout pipes GS DN 50mm with sluice valve L /sum 1,000,000.00
62
63
MOverflow pipe 30mm to drain excess water L /sum 1,000,000.00
64
65
NManhole cover with hole for sunction pump.1No350,000350,000.00
66
67
OInside rider and its accessories.1No1,000,0001,000,000.00
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
90
91
92
93
94
95
96
97
98
99
100
101
Collection 24,850,000