1Redesign 1 - Concept and Research
12
1.1Concept GenerationEveryone12/10/20241/10/202530100%
13
1.2Research Everyone12/10/20241/10/202530100%
14
1.3Get Ventilator MeasurementsEveryone1/10/20251/15/20255100%
15
2Redesign 1 - Design
16
2.1Create Risk Reduction HardwareEveryone1/6/20251/15/20259100%
17
2.2CAD RedesignEveryone1/6/20251/18/2025100%
18
2.2.1CAD Rail MountParissa1/6/20251/18/202512100%
19
2.2.2CAD Drager/Device IntegrationJeffrey1/6/20251/18/202512100%
20
2.2.3CAD Mounting Hub/LinkagesReuven1/6/20251/18/202512100%
21
2.2.4CAD Shoulder/Accessory PlateMike1/6/20251/18/202512100%
22
2.2.5CAD Brake SystemMayah1/6/20251/18/202512100%
23
3Redesign 1 - Prototype Dev & Fab
24
3.1Fabricate Rail MountParissa1/18/20251/25/20257100%
25
3.2Fabricate Drager/Device IntegrationJeffrey1/18/20251/25/20257100%
26
3.3Fabricate Mounting Hub/LinkagesReuven1/18/20251/25/20257100%
27
3.4Manufacture Accessory PlateMike1/18/20251/25/20257100%
28
3.5Manufacture Brake SystemMayah1/18/20251/25/20257100%
29
4Redesign 1 - Testing
30
4.1Assemble PartsEveryone1/25/20251/27/20252100%
31
4.2Mock Trials Round 1Everyone1/27/20251/27/20250100%
32
4.3Design ImprovementEveryone1/31/20252/2/20252100%
33
4.4Refabricate ImprovementsEveryone2/2/20252/9/20257100%
34
4.5Report DraftingEveryone1/30/20253/1/202531100%
35
5Redesign Sprint 2
36
5.1Mock Trials Round 2Everyone2/9/20252/9/20250100%
37
5.2Design ImprovementEveryone2/9/20252/20/202511100%
38
5.3Refabricate ImprovementsEveryone2/20/20253/4/202514100%
39
5.4Report DraftingEveryone2/20/20253/10/202520100%
40
6Final Design Testing
41
6.1NICU Task Force Mock Trials Round 3Everyone3/4/20253/4/20250100%
42
6.2Final Design FabricationEveryone2/25/20253/10/202515100%
43
5.3Report Drafting Everyone2/20/20253/10/202520100%
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100