1 | BALLROOM TO DOs | ||||||
2 | |||||||
3 | Category | Priority | Keyword | Skill Level | Location | Problems | Qty. |
4 | CodeCompliance-ABC | 1 | signage | anyone | Behind bar | Put up ABC signage req. for pub or private parties w/ alcohol re: cancer/pregnancy warning | 1 |
5 | CodeCompliance-Fire | 1 | move stuff | anyone | Behind bar | Move all remaining hardware / tools / materials into secure storage room (move out from behind bar) | 1 |
6 | CodeCompliance | 1 | move stuff | anyone | Crow's nest (ballroom) | Clear everything 3' in front of electrical subpanel including all cords, lighitng, etc | 1 |
7 | Electrical | 1 | light cover | anyone | Crow's nest (ballroom) | acquire & install cover for light (fixture takes glass orb / cover around bulb, it is missing) | 1 |
8 | Electrical | 1 | light cover | anyone | Shattuck St exit alcove | install light cover into flourescent panel (22"x3') - flourescents are 2x 2' bulbs | |
9 | 1 | bathroom | anyone | bathroom | install paper towel dispenser and paper towels | ||
10 | Fire code | 1 | exit sign | anyone | bottom of stairs leading to crow's nest | Remove the correct directional arrow on this sign to indicate right turn at bottom of stairs | |
11 | Construction-finishing | 3 | door seal | experienced carpenter | Crow's nest (ballroom) | Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing | 1 |
12 | Construction-Rough | 3 | stage | experienced carpenter | Stage | Create wider storage openings under stage. Not insubstantial. See stage storage build plan. | 1 |
13 | Electrical | 1 | elec. panel | experienced electrician | A/V room | Electrical subpanel: Either replace broken breaker switces with with working ones, or install factory blanks. | 1 |
14 | Electrical | 1 | elec. outlet | experienced electrician | Mezzanine Bathroom | outlet needs to be replaced with GFCI - Note: no ground; Gerald suggests decommissioning and installing new grounded plug in wall just above counter; go into wall from other side, need to locate grounded location | 1 |
15 | Electrical | 1 | frog eyes | experienced electrician | Mezzanine Bathroom | emergency lighting module (frog eyes) needs be installed (as in in every bathroom) | 1 |
16 | Electrical | 3 | ventilation | experienced electrician | Mezzanine Bathroom | active ventilation needs to be wired & installed (exhaust) in current ventilation window | 1 |
17 | Electrical | 1 | elec. outlet | experienced electrician | Mezzanine Room | 4"x4" Outlets affixed to top of Electrical subpanel must be removed from subpanel, and affixed to balcony (code violation) (3x) | 3 |
18 | Electrical | 2 | elec. panel | experienced electrician | Mezzanine Room | Electrical subpanel needs be moved to plywood wall south of panel, onto drywall, 2' from ground. | 1 |
19 | Electrical | 2 | elec. panel | experienced electrician | Mezzanine Room | 3-way switch wiring (for chandelier) inside subpanel needs to be removed and placed elsewhere as not ok in-panel. | 1 |
20 | Electrical | 1 | frog eyes | experienced electrician | Stageside Bathroom | emergency lighting module (frog eyes) needs be installed (as in in every bathroom) | 1 |
21 | Construction-Finishing | 3 | door seal | experienced in construction | Ticketbooth Room | Install threshold plate to base of jamb (no more than 1/2" high as per ADA) to cut down on sound from ballroom | 1 |
22 | Mechanical | 3 | ventilation | experienced in mechanical | Crow's nest (ballroom) | rebalance fan | 1 |
23 | Plumbing | 2 | plumbing | experienced plumber | Behind bar | Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar) | 1 |
24 | Plumbing | 2 | plumbing | experienced plumber | Behind bar | Install floor sink under 3-sink as per health code | 1 |
25 | secure storage | lock storage shelving needs to be replaced or reinforced | |||||
26 | Electrical | 1 | elec. outlet | minimal electrical exp. | Behind bar | Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall | 1 |
27 | Electrical | 1 | elec. outlet | minimal electrical exp. | Shattuck st exit alcove | remove outlet under lightswitch, and put in blank plate (turn off breaker, remove outlet, wire nut & elec tape, cover w/ blank faceplate, turn breaker back on.) | 1 |
28 | Construction-Rough | 2 | caulk / seal | moderate | A/V room | Patch small hole above door where conduit is peeking through. | 1 |
29 | Construction-Rough | 2 | hole (drywall) | moderate | A/V room | Patch hole near floor in NW corner of this room near door jamb. | 1 |
30 | Electrical | 2 | light fixture | moderate | Balcony - SE stair up | Install new led strip lighting on ea. side of stair to replace dead lighting strips | 1 |
31 | Electrical | 1 | light fixture | moderate | Balcony - south wall | bare-bulb fixtures replaced with covered fixtures | 1 |
32 | Electrical | 2 | light fixture | moderate | Balcony - SW stair up | Install new led strip lighting on ea. side of stair to replace dead lighting strips | |
33 | Construction-Rough | 1 | hole (drywall) | moderate | Balcony - SW stair up | Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment) | |
34 | Electrical | 2 | light switch (3-way) | moderate | Balcony - SW stair up | Determination if 3-way switch needs to be installed at top of stair. Currently there is only a switch at bottom landing. | 1 |
35 | Electrical | 2 | motion detector | moderate | Balcony - SW stair up | motion detector installed onto light fixture. | 1 |
36 | Construction-finishing | 1 | barrier | moderate | Crow's nest (ballroom) | extend balcony railing to out in front of balcony hatch - on E side of R&J balcony (building & osha safety) | 1 |
37 | Construction | 2 | caulk / seal | moderate | Crow's nest (ballroom) | Refinish & airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg | 1 |
38 | Construction-finishing | 2 | door hardware | moderate | Crow's nest (ballroom) | Install real doorknob, remove latch | 1 |
39 | Construction-finishing | 2 | door seal | moderate | Crow's nest (ballroom) | make north door to romeo & juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier | 1 |
40 | Electrical | 1 | light fixture | moderate | Mezzanine Bathroom | all exposed bulb fixtures need be replaced with covered fixtures (2x) | 2 |
41 | Construction-Finishing | 3 | door hardware | moderate | Women's room | install door stop to door of women's room so the door can be propped open sometimes. | |
42 | Electrical | 1 | light bulb | moderate | Above bar | soffet-mounted ceiling light fixtures need: lightbulbs tested / replaced if necc | 4 |
43 | Electrical | 1 | light cover | moderate | Above bar | soffet-mounted ceiling light fixtures need: panel covers (or replacement) | 2 |
44 | Construction-Finishing | 2 | door closer | moderate | Crow's nest (ballroom) | Install closer to main (east) door | 1 |
45 | Construction-Finishing | 2 | door closer | moderate | Crow's nest (ballroom) | Install closer to north / balcony door | 1 |
46 | Construction-Finishing | 2 | door closer | moderate | Mezzanine Room | Install closer to Mezzanine room door | |
47 | Construction-Finishing | 1 | door closer | moderate | Shattuck st exit - inner doors | install closers to both inner doors. | |
48 | Construction-Finishing | 1 | door panic bar | moderate construction exp. | Shattuck st exit - inner doors | install panic bars to both inner doors. | 2 |
49 | Construction-Finishing | 1 | door panic bar | moderate construction exp. | Shattuck st exit - outer doors | install panic bars to both outer doors. | 2 |
50 | Electrical | 1 | light fixture | moderate electrical exp | Behind bar | Along east/shattucksider wall, replace bare-bulb fixtures with covered fixtures (2x) | 2 |
51 | Mechanical | 2 | structural eng. | structural engineer contact ONLY | Crow's nest (ballroom) | ensure balcony hatch is robust enough to support 300lb standing weight | 1 |