BCD Regulatory Meeting Matrix
2
Details of BCD Regulatory Meetings
3
Last updated: 4/6/22
4
5
Meeting TitleWhen Does it Occur?Preparation Required for Meeting (Agenda Required)BCD Review TypeBlueBeam All Call Stakeholder SessionWho Schedules?PurposeCPMPlanners/PSREArchitectEngineersContractorsBCD LeadershipBCD Plan ReviewersBCD InspectorsEnvironmental HealthEnergy ManagementDisability ServicesOwners / Client /
Users / Tenants
6
7
8
9
10
Informal DiscussionsAE Team or BCD to reach out as necessary when requiredConcept DiscussionN/AInformalAsk questionsAs DirectedAs DirectedAs DirectedAs DirectedAs DirectedAs DirectedAs DirectedAs DirectedAs DirectedAs DirectedAs Directed
11
Project FeasibilityAs first project kickoff meeting in PreDesign; regulators only (not program representatives)-Confirm Jurisdictional Authority
-Demonstrate land ownership
-Confirm land use
-Infrastructure ownership / condition
-Change in use/occupancy
-Outside Agency involvement
-Other Enivormentenal Permitting Agencies
Meeting w/ Report (?)

Agenda required in advance to determine if additional stakeholders required
No Bluebeam Planning PSRE schedule and leadDefine understanding of basic issues (land ownership, jurisdictional authority, land use, utility infrastructure)AttendeeAttendeenot invitedAttendeenot invitedAttendeenot invitednot invitedAs Directed by BCDAttendeenot invitednot invited
12
Pre Design Meeting Near the end of pre-design but prior to finalizing.

Pre-Design and SD are funded
Architect needs to determine what codes required

The following documents must be completed prior to the meeting:
- Scope / Schedule / Budget (Valuation)
- Preliminary Code Analysis
- Site Plan
- Survey (if necessary)
- Preliminary Floor Plans / Cross Section

Discussion Items:
- Jurisdictional Authority
- Alternative materials or methods
- Operational licenses and/or permits
Meeting

Meeting minutes expected to be issued by the AE

Agenda required in advance to determine if additional stakeholders required
BCD invited (not expected to comment) CPMReview the codes and provide other information to ArchitectAttendeeAttendeeLeaderNot InvitedNot InvitedAttendeeAttendeeNot InvitedAs Directed by BCDAs Directed by BCD
(*if Civil Drawings are available)
As Directed by BCDNot Invited
13
Schematic Design - 1st MeetingOccurs at the beginning of SDReview Pre-Design decisions.
The following documents must be completed prior to the meeting:
- Scope
- Scheduling
- Preliminary Code Analysis
- Site Plan
- Survey (if necessary)
- Floor Plans / Cross Section

Be prepared to discuss the following at the meeting:
- SAC / Industrial SAC
- Phasing (separate matrix) / Phased Occupancy
- Documents Required for Permitting
- Chemical Inventory
- Outside Agency Involvement (Timing)
- Alternative Materials & Methods (separate matrix)
- Special provisions / Chapter 4
- Special Inspections
- Special Project Requests
Meeting

Meeting minutes expected to be issued by the AE

Agenda required in advance to determine if additional stakeholders required
NACPMSetting the regulatory requirements for the project.AttendeeAttendee (if outside agency permitting)LeaderNot InvitedNot InvitedAttendeeAttendeeNot InvitedAs Directed by BCDAs Directed by BCDAs Directed by BCDNot Invited
14
Schematic Design - 2nd MeetingOccurs at the end of SD (95% complete)The following documents must be completed prior to the meeting:
- Updated Code Analysis
- Finalize phasing

Agenda to be sent

Project review of existing documents & confirmation documents reflect regulatory requirements
Meeting

Meeting minutes expected to be issued by the AE

Agenda required in advance to determine if additional stakeholders required
BCD invited (not expected to comment) CPMVerifying regulatory requirements

Code Analysis is approved
AttendeeNALeaderAs DirectedNot InvitedAttendeeAttendeeAs determined between CPM PM and BCD LeadershipAs DirectedAs DirectedAs DirectedAs determined between CPM PM and BCD Leadership
15
DD - 1st Meeting
(IF NEEDED)
Occurs at the beginning of DD (If needed based on a project pause; verify with BCD Leadership)Agenda to be sent

Project review of existing documents & confirmation documents reflect regulatory requirements
Meeting

Meeting minutes expected to be issued by the AE

Agenda required in advance to determine if additional stakeholders required
NACPMRegulatory design is proceeding as agreedAttendeeNALeaderAttendeeAs DirectedAttendeeAttendeeAs DirectedAs DirectedAs DirectedAs DirectedAs determined between CPM PM and BCD Leadership
16
DD - 2nd MeetingOccurs at the end of DD (95% complete)The following documents must be completed prior to the meeting:
- Finalize Code Analysis
- Finalize phasing
- Finalize permit phasing

Agenda to be sent

Project review of existing documents & confirmation documents reflect regulatory requirements. All plans - including MEP and civil plans - must be completed prior to this meeting.
Meeting

Meeting minutes expected to be issued by the AE

Agenda required in advance to determine if additional stakeholders required
BCD invited (not expected to comment) CPMVerifying all regulatory requirements are incorporated in designAttendeeNALeaderAttendeeAs DirectedAttendeeAttendeeAttendeeAs DirectedAs DirectedAs DirectedAs determined between CPM PM and BCD Leadership
17
CDOccurs at the end of CD (95% complete)Agenda to be sent

Project review of existing documents
Meeting

Meeting minutes expected to be issued by the AE

Agenda required in advance to determine if additional stakeholders required
BCD invited (not expected to comment) CPMVerifying documents are ready for permittingAttendeeNALeaderAttendeeAs DirectedAttendeeAttendeeAttendeeAs DirectedAs DirectedAs DirectedAs determined between CPM PM and BCD Leadership
18
Next Steps:
19
Application & Permitting BCD Closed BlueBeam SessionAt time of permit applicationContractor submits permit application and PDF documents

URep (CPM) ensures review by all stakeholders prior to validating the permit in Accela
BCD Only SessionN/AN/AReview stamped and signed documents for code requirements. ValidatorLicensed ProfessionalLicensed ProfessionalApplicantN/ABCD Acceptance & IssuanceBCD Acceptance & IssuanceN/AN/AN/AN/A
20
Notes:Contractor to call BCD with permit application & inspections questions
21
Link to BCD Checklist
https://bcd.umn.edu/permit-applicationplan-review/application-requirements-building-permits
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100