NOURAIAN PEKERJAANVolume Sat VOL MGG LALUVOLUME MINGGU INIJUMLAH VOL HARGA JUMLAH HARGA TOTAL OPNAM
8
PERHITUNGAN JUMLAH S/D MGG INI SATUAN S/D MGG INI
9
10
1Bongkar batu ampyang7.5775m2 7.58 7.58 27,612.50 209,233.72
11
2Plesteran Ampyangan30.808m2 12.19 0,90*4,80+1,65*1,05+0,67*5,4+1,60*1,9+4,65*0,75+1,78*0,75+1,45*0,7518.6205 30.81 37,086.53 1,142,561.66
12
3Pasang batu ampyang31.708m2 13.09 0,90*4,80+1,65*1,05+0,67*5,4+1,60*1,9+4,65*0,75+1,78*0,75+1,45*0,7518.6205 31.71 100,000.00 3,170,800.00
13
4Pasangan Lis Bevel Ampyangan1.7865m2 - 1.7865 2 100,000.00 178,650.00
14
5Pasang keramik Selasar4.32m2 4.32 4.32 79,566.30 343,726.42
15
6Pasang keramik dinding anak3.22m2 3.22 3.22 79,566.30 256,203.49
16
7Keramik lantai kamar mandi anak7.01m2 7.01 7.01 79,566.30 557,759.76
17
8Pasang bewel dinding 10x20 kamar mandi anak2.28m2 2.28 2.28 79,566.30 181,411.16
18
9Bongkar screading dak 111.45 m2 46.31 (1,95*12,5)+(5,1*2,3)+(3,4*1,9)+(10,75*2,1)65.14 111.45 27,612.50 3,077,413.13
19
10Screeding ulang atap palt dag 111.45 m2 46.31 (1,95*12,5)+(5,1*2,3)+(3,4*1,9)+(10,75*2,1)65.14 111.45 37,086.53 4,133,293.21
20
11Pasang tegel 20x20 kamar pembantu4m2 4.00 4.00 75,934.38 303,737.50
21
12Pasang tegel depan tangga3.78m2 3.78 3.78 75,934.38 287,031.94
22
13Pasang tegel area sumur46.44m2 46.44 46.44 75,934.38 3,526,392.38
23
14Pasang roster atas tangga lantai 23.45m2 3.45 3.45 72,333.00 249,548.85
24
15Screading dak teras36.31m2 36.31 36.31 27,612.50 1,002,609.88
25
16Benangan85m1 85.00 85.00 14,403.15 1,224,267.75
26
17Plesteran + Benangan18.92m2 - 18.92 59,086.53 1,117,917.05
27
18Cat genteng247.940m2 247.94 247.94 15,000.00 3,719,100.00
28
19Bongkar Benangan35.4m' 35.40 35.40 15,000.00 531,000.00
29
20Pasang septictank+ galian1unit 1.00 1.00 650,000.00 650,000.00
30
21Pasang pipa septictang dan acesoris1ls 1.00 1.00 200,000.00 200,000.00
31
22cor tutup pengaman septictank0ls - 180,000.00 180,000.00
32
23Membuat bak kontrol1unit - 1.00 150,000.00 150,000.00
33
24Pasangan batu kewal pagar depan2.4m2 - 2,40*0,60+2,40*0,402.4 100,000.00 240,000.00
34
25Bongkar plesteran dinding kamar utama11.532m2 - 1,86*3,211.532 27,612.50 318,427.35
35
26Plesteran dinding ulang11.5321,86*3,211.532 37,086.53 427,681.81
36
27Pasanagan Finishing batu tempel5.0250,30*0,30+0,07*0,70+0,10*,355.025 100,000.00 502,500.00
37
28Pasangan batu tempel akibat tree listrik0.060,15*0,40.06 100,000.00 6,000.00
38
29Revisi benangan sidut balkon9.2m'2*4,69.2 14,403.15 132,508.98
39
30Pasangan tegel balkon L22.76m21,20*2,32.76 75,934.38 209,578.88
40
31Plesteran screeding tanggaL1 Ke L210.08m20,6*1,05*1610.08 37,086.53 373,832.17
41
32Plesteran screeding tangga L2 Ke L310.08m20,6*1,05*1610.08 37,086.53 373,832.17
42
33Benangan trap tangga30.8m'1,1*14*230.8 14,403.15 443,617.02
43
34Pasangan bata taman samping4.2m20,25*12,84.2 27,500.00 115,500.00
44
35Pasangan bata taman sisi pagar depan3.2m20,25*8,83.2 27,500.00 88,000.00
45
36Pasangan bata taman depan kamar anak1.9m20,25*7,61.9 27,500.00 52,250.00
46
37Plesterann bata taman18.98m2(29,2*0,65)*218.98 37,086.53 703,902.24
47
38Benangan sudut taman58.4m'29,2*258.4 14,403.15 841,143.96
48
39Bongkar pondasi saluran4.56m30,3*0,8*124.56 27,612.50 125,913.00
49
40Pasang pondasi saluran5.76m30,3*0,8*125.76 80,000.00 460,800.00
50
41Plesteran dinding saluran38.4m2(0,8*12*2)*238.4 37,086.53 1,424,122.56
51
42Bongkar tutup plat jembatan1.575m30,15*1,5*71.575 27,612.50 43,489.69
52
43Galian pembersihan saluran2.04m20,2*0,85*122.04 60,000.00 122,400.00
53
44Galian tanah area Ramp dan taman10.26m30,2*2,7*1210.26 60,000.00 615,600.00
54
45Buang bekas galian13.875m36,48+2,04+1,57513.875 27,612.50 383,123.44
55
46Pasang begesting plat saluran16.15m20,85*1416.15 45,000.00 726,750.00
56
47Pembesian saluran655.2kg(0,0065*10*10*12*42)*2655.2 2,500.00 1,638,000.00
57
48Cor plat beton jembatan10.773m30,15*3,78*1410.773 250,000.00 2,693,250.00
58
49Bobok plesteran dinding area kichenset7.08m20,80*3,857.08 27,612.50 195,496.50
59
50Plesteran dinding ulang5.48m20,8*3,855.48 37,086.53 203,234.16
60
51Cor Ramp masuk4.59m30,10*2,7*8,504.59 250,000.00 1,147,500.00
61
52Expose plat beton17.55m22,7*6,5017.55 12,500.00 219,375.00
62
53Begesting17.9m'2,70*2+6,5017.9 15,000.00 268,500.00
63
54Buang bekas galian14.57m30,25*6,20*2,7014.57 27,612.50 402,314.13
64
55Bobok plesteran Up pasangankeramik dinding kichen set10.4m20,8*3,2+0,8*0,810.4 27,612.50 287,170.00
65
56Pasangan keramik dinding kichen set10.4m20,8*3,2+0,8*0,810.4 79,566.30 827,489.52
66
57Pasangan dinding bata taman teras kota6m20,3*7+0,3*66 27,500.00 165,000.00
67
58Plesteran diding bata taman tersa kota11.4m213*0,611.4 27,500.00 313,500.00
68
59Galian tanah sloob ril pintu slidung4.56m30,3*0,4*144.56 60,000.00 273,600.00
69
60Rabat lantai7.6m20,4*177.6 27,500.00 209,000.00
70
61Pembesian , begesting, cor sloob riil19m'1*1419 35,000.00 665,000.00
71
62Buang bekas galian14.3508m37,1*13,3*0,06-0,8*1,8*0,0614.3508 27,500.00 394,647.00
72
63Streeping halaman depan106.29m28,1*13,3-0,8*1,8106.29 27,500.00 2,922,975.00
73
64Langsir paving ston106.29m28,1*13,3-0,8*1,8106.29 27,500.00 2,922,975.00
74
65Pasangan paving corso 106.29m28,1*13,3-0,8*1,8106.29 12,000.00 1,275,480.00
75
66Rabat lorong sisi timur3.85m20,55*63.85 27,612.50 106,308.13
76
67Pasangan keramik lantai3.85m20,55*63.85 79,566.30 306,330.26
77
68Pasangan atap genteng L39.9m20,6*11+0,3*119.9 27,500.00 272,250.00
78
69Bikin tutup bak kontrol saluran0.672m30,8*1,2*0,1*20.672 250,000.00 168,000.00
79
70Pasang roster L2 dan L3 atas trap tangga19.84m23,8*3,2+2,4*3,219.84 79,566.30 1,578,595.39
80
71begesting,pembesian, cor dudukan rill21m'1*1421 125,000.00 2,625,000.00
81
72Galian pondasi riiil3.15m30,6*0,25*143.15 120,000.00 378,000.00
82
73Bobok plesteran existing26.88m22,8*6,626.88 37,086.53 996,885.79
83
74Buang bekas sampah1ls11 250,000.00 250,000.00
84
75Bongkar wuwung L314.6m'11.614.6 35,000.00 511,000.00
85
76Pasang wuwung ke,bali14.6m'11.614.6 35,000.00 511,000.00
86
77Pembersihan bekas bongkarang1ls11 250,000.00 250,000.00
87
78Benagan beton exspose24m'2424 15,000.00 360,000.00
88
79Finishing plesteran exspos16.2m218*0,916.2 27,500.00 445,500.00
89
80cor pondasi dudukan motor pagar0.216m30,6*0,6*0,60.216 150,000.00 32,400.00
90
81
91
82
92
83
93
84
94
85
95
86
96
87
97
JUMLAH MINGGU III Rp 60,939,407.02
98
99
100
JUMLAH OPNAM S/D MINGGU INI