1 | IBC Table 1604.5: Occupancy Category | ||||||||||||||||||||||||||||
2 | Category | Nature of Occupancy | IE | IBC Table 1613.5.3(1): Values of Site Coefficient Fa | |||||||||||||||||||||||||
3 | I | Buildings and other structures that represent a low hazard to human life in the event of failure. | 1.00 | 1 | 2 | 3 | 4 | 5 | |||||||||||||||||||||
4 | Project | Job # | Page | of | II | Buildings and other structures except those listed in Categories I, III, and IV. | 1.00 | Site Class | 0.25 | 0.5 | 0.75 | 1 | 1.25 | ||||||||||||||||
5 | Client | By | Date | 02/01/26 | III | Buildings and other structures that represent a substantial hazard to human life in the event of failure. | 1.25 | 1 | A | 0.80 | 0.80 | 0.80 | 0.80 | 0.80 | 1 | Row #: | 2 | ||||||||||||
6 | Subject | Checked | Date | IV | Buildings and other structures designated as essential facilities. | 1.50 | 2 | B | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 2 | Fa Low: | 1.00 | Ss Low: | 0.75 | |||||||||||
7 | 3 | C | 1.20 | 1.20 | 1.10 | 1.00 | 1.00 | 3 | Low Col #: | 3 | |||||||||||||||||||
8 | Seismic Base Shear for the Equivalent Lateral Force Procedure | IBC Table 1615.1.1: Site Class Definitions | 4 | D | 1.60 | 1.40 | 1.20 | 1.10 | 1.00 | 4 | Fa High: | 1.00 | Ss High: | 1 | |||||||||||||||
9 | Per IBC 2006 & ASCE 7-05 | Site Class | Name | 5 | E | 2.50 | 1.70 | 1.20 | 0.90 | 0.90 | 5 | High Col #: | 4 | ||||||||||||||||
10 | A | Hard Rock | 6 | F | ***NA*** | ***NA*** | ***NA*** | ***NA*** | ***NA*** | 6 | Rise: | 0.00 | Run: | -0.25 | |||||||||||||||
11 | Structure: | B | Rock | 1 | 2 | 3 | 4 | 5 | Rise/Run: | 0 | |||||||||||||||||||
12 | Address: | C | Very Dense Soil and Soft Rock | Fa : | 1.00 | ||||||||||||||||||||||||
13 | Latitude: | Longitude: | D | Stiff Soil Profile | |||||||||||||||||||||||||
14 | E | Soft Soil Profile | |||||||||||||||||||||||||||
15 | Structure Classification | F | ----- | ||||||||||||||||||||||||||
16 | Occupancy Category : | II | per IBC Table 1604.5 | ||||||||||||||||||||||||||
17 | Occupancy Category Description: | Buildings and other structures except those listed in Categories I, III, and IV. | |||||||||||||||||||||||||||
18 | Seismic Design Category (SDC): | D | per ASCE Section 11.6 | ASCE Table 12.8-2: Values of Approximate Period Parameters | IBC Table 1613.5.3(2): Values of Site Coefficient FV | ||||||||||||||||||||||||
19 | IE: | 1.00 | per ASCE Table 11.5-1 | Steel Moment Frame | 0.028 | 0.8 | 1 | 2 | 3 | 4 | 5 | ||||||||||||||||||
20 | Seismic Force-Resisting System: | Concrete Moment Frame | 0.016 | 0.9 | Site Class | 0.1 | 0.2 | 0.3 | 0.4 | 0.5 | |||||||||||||||||||
21 | R: | 3 1/2 | per ASCE7 Table 12.2-1 | Eccentrically Braced Frames | 0.03 | 0.75 | 1 | A | 0.80 | 0.80 | 0.80 | 0.80 | 0.80 | 1 | Row #: | 2 | |||||||||||||
22 | hn (ft): | 50.00 | height above the base to the highest level of the structure | All Other Structural Systems | 0.02 | 0.75 | 2 | B | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 2 | Fa Low: | 1.00 | Ss Low: | 0.4 | |||||||||||
23 | 3 | C | 1.70 | 1.60 | 1.50 | 1.40 | 1.30 | 3 | Low Col #: | 4 | |||||||||||||||||||
24 | Site Ground Motion | 4 | D | 2.40 | 2.00 | 1.80 | 1.60 | 1.50 | 4 | Fa High: | 1.00 | Ss High: | 0.5 | ||||||||||||||||
25 | Maximum Considered Earthquake (MCE 2% in 50 Year) spectral response accelerations can be found by entering the Latitude and Longitude of the structure location into the following USGS website: | http://eqint.cr.usgs.gov/eq-men/html/lookup-2002-interp-06.html | 5 | E | 3.50 | 3.20 | 2.80 | 2.40 | 2.40 | 5 | High Col #: | 5 | |||||||||||||||||
26 | SS (g-sec): | 0.88 | S1 (g-sec): | 0.44 | 6 | F | ***NA*** | ***NA*** | ***NA*** | ***NA*** | ***NA*** | 6 | Rise: | 0.00 | Run: | -0.1 | |||||||||||||
27 | Site Class: | B | per geotechnical report or building official | 1 | 2 | 3 | 4 | 5 | Rise/Run: | 0 | |||||||||||||||||||
28 | Site Class Description: | Rock | per IBC Table 1613.5.2 | Fa : | 1.00 | ||||||||||||||||||||||||
29 | Fa: | 1.00 | FV: | 1.00 | per IBC Section 1613.5.3 | ||||||||||||||||||||||||
30 | SMS (g-sec): | 0.88 | = Fa * SS | SM1 (g-sec): | 0.44 | = FV * S1 | per IBC Section 1613.5.3 | IBC Table 1613.5.6(1) Seismic Design Category Based on SDS | IBC Table 1613.5.6(2) Seismic Design Category Based on SD1 | ||||||||||||||||||||
31 | SDS (g-sec): | 0.59 | = 2/3 * SMS | SD1 (g-sec): | 0.29 | = 2/3 * SM1 | per IBC Section 1613.5.4 | I | II | III | IV | I | II | III | IV | ||||||||||||||
32 | SDC: | D | SDC: | D | per IBC Section 1613.5.6 | 0.167 | A | A | A | A | 0.067 | A | A | A | A | ||||||||||||||
33 | 0.33 | B | B | B | C | 0.133 | B | B | B | C | |||||||||||||||||||
34 | Fundamental Period per ASCE 12.8.2 | 0.5 | C | C | C | D | 0.2 | C | C | C | D | ||||||||||||||||||
35 | Period Method: | Approximate Fundamental Period | Properly Substantiated Analysis | D | D | D | D | 5 | D | D | D | D | 5 | 5 | |||||||||||||||
36 | Properly Substantiated Analysis | Approximate Fundamental Period | |||||||||||||||||||||||||||
37 | Period (sec.): | 0.00 | fundamental period of the structure per ASCE 12.8.2 | Alt. Approx. Fundamental Period | |||||||||||||||||||||||||
38 | Cu: | 1.40 | Period Upper Limit Coefficient per ASCE Table 12.8-1 | ||||||||||||||||||||||||||
39 | T (sec.): | 0.00 | per analysis | ||||||||||||||||||||||||||
40 | Approximate Fundamental Period per ASCE 12.8.2.1 | ||||||||||||||||||||||||||||
41 | Structure Type: | All Other Structural Systems | D | D | D | D | 4 | D | D | D | D | 4 | 4 | ||||||||||||||||
42 | Ct: | 0.02 | x: | 0.75 | per ASCE Table 12.8-2 | ||||||||||||||||||||||||
43 | Ta (sec): | 0.38 | = Ct * hnx; per ASCE Eq. 12.8-7 | ||||||||||||||||||||||||||
44 | Alternate Approximate Fundamental Period per ASCE 12.8.2.1 | ||||||||||||||||||||||||||||
45 | Ta (sec): | 0.50 | per Alternate Methods for MF's & Masonry/Concrete SW's in ASCE 12.8.2.1 | ||||||||||||||||||||||||||
46 | |||||||||||||||||||||||||||||
47 | Tuse (sec): | 0.38 | |||||||||||||||||||||||||||
48 | TL (sec): | 16.00 | Long-period Transition Period per ASCE Figures 22-15 through 22-20 (pages 228-233) | ||||||||||||||||||||||||||
49 | T <= TL | ||||||||||||||||||||||||||||
50 | |||||||||||||||||||||||||||||
51 | Equivalent Lateral Force Procedure Design Base Shear per ASCE 12.8 | ||||||||||||||||||||||||||||
52 | Cs: | 0.17 | = SDS / (R/IE); per ASCE Eq. 12.8-2 | ||||||||||||||||||||||||||
53 | Cs-max: | 0.22 | = SD1 / (Ta*R/IE); for T <= TL per ASCE Eq. 12.8-3 | SDC | |||||||||||||||||||||||||
54 | Cs-max: | 9.48 | = SD1*TL / (Ta2*R/IE); for T > TL per ASCE Eq. 12.8-4 | A | |||||||||||||||||||||||||
55 | Cs-min: | 0.01 | per ASCE Eq. 12.8-5 | B | |||||||||||||||||||||||||
56 | Cs-min: | 0.06 | = 0.5S1 / (R/IE) per ASCE Eq. 12.8-6 | C | |||||||||||||||||||||||||
57 | Cs-use: | 0.17 | D | ||||||||||||||||||||||||||
58 | E | ||||||||||||||||||||||||||||
59 | V : | 0.17 W | = CS-use * W; per ASCE Eq. 12.8-1 | F | |||||||||||||||||||||||||
60 | |||||||||||||||||||||||||||||
61 | |||||||||||||||||||||||||||||
62 | |||||||||||||||||||||||||||||
63 | |||||||||||||||||||||||||||||
64 | |||||||||||||||||||||||||||||
65 | |||||||||||||||||||||||||||||
66 | |||||||||||||||||||||||||||||
67 | |||||||||||||||||||||||||||||
68 | |||||||||||||||||||||||||||||
69 | |||||||||||||||||||||||||||||
70 | |||||||||||||||||||||||||||||
71 | |||||||||||||||||||||||||||||
72 | |||||||||||||||||||||||||||||
73 | |||||||||||||||||||||||||||||
74 | |||||||||||||||||||||||||||||
75 | |||||||||||||||||||||||||||||
76 | |||||||||||||||||||||||||||||
77 | |||||||||||||||||||||||||||||
78 | |||||||||||||||||||||||||||||
79 | |||||||||||||||||||||||||||||
80 | |||||||||||||||||||||||||||||
81 | |||||||||||||||||||||||||||||
82 | |||||||||||||||||||||||||||||
83 | |||||||||||||||||||||||||||||
84 | |||||||||||||||||||||||||||||
85 | |||||||||||||||||||||||||||||
86 | |||||||||||||||||||||||||||||
87 | |||||||||||||||||||||||||||||
88 | |||||||||||||||||||||||||||||
89 | |||||||||||||||||||||||||||||
90 | |||||||||||||||||||||||||||||
91 | |||||||||||||||||||||||||||||
92 | |||||||||||||||||||||||||||||
93 | |||||||||||||||||||||||||||||
94 | |||||||||||||||||||||||||||||
95 | |||||||||||||||||||||||||||||
96 | |||||||||||||||||||||||||||||
97 | |||||||||||||||||||||||||||||
98 | |||||||||||||||||||||||||||||
99 | |||||||||||||||||||||||||||||
100 | |||||||||||||||||||||||||||||