ABCDEFGHIJKLM
1
ProjectCountyProject LinkProject #
Completion Date
Permalink(s)DrawingPrimary Editor(s)WME EventNotesOriginal SLConstuction SL
2
NC-295
(Future I-295)
CumberlandNCDOTU-2519OpenPhase 2I-295 Drawingss18sliderNA
3
2018Phase 3
4
Murchison Rd UpgradesCumberlandU-44446-28-2016LinkNew Overpasss18sliderEventNew Overpass not on Overall or Spring Lake Detailed Drawings. It was added later.
5
2017LinkOverall
6
Spring Lake Detailed
7
I-85 RehablitationVanceHarvey PowersI-0914BA/BB2017Area 1Area 1s18slider & The_Cre8rEventThe_Cre8r is recieving emails for closures from NCDOT6555
8
2019Area 2Area 2Public Meeting Link6555
9
Warren2017Area 3Area 36555
10
2018Area 4Area 46555
11
I-85 Widening
and Improvements
CabarrusNCDOTI-3802A and I-3802BJune 2020Overall Mapdfortney & s18slider
12
LinkDale Earnhardt Blvd Interchange
13
LinkLane St Interchange
14
LinkUS-29/601 Interchange
15
LinkWinecoff School Rd
16
LinkLake Concord Rd
17
NC-24 WideningNCDOTR-2303September 2018Overall Maps18slider
18
CumberlandR-2303ALinkSheet 1
19
LinkSheet 2
20
SampsonR-2303BLinkSheet 3
21
LinkSheet 4
22
R-2303CLinkSheet 5
23
LinkSheet 6
24
R-2303DLinkSheet 7
25
LinkSheet 8
26
East End ConnectorDurhamNCDOTU-0071January 2020LinkProject Maps18slider
27
Drawing1
28
Greensboro Urban LoopGuilfordNCDOTU-2524March 2018U2524CU2524 MapsdfortneyRemaining 15 miles of 44-mile long loop around Greensboro
29
Began late 2016U2524D
30
U-2525RoW started, const starts 2018U2525CU2525 Maps
31
December 2018U2525B
32
Owen DrCumberlandW-5514?? 2016LinkDocumentss18sliderNAInstalling Median from All American Freeway to I-95 BUS
33
Gallants Channel BridgeCarteretNCDOTR-33072017LinkProject MapRaptorGuyinNCSuper 70 project. Bridge completion expected summer 2016
34
Monroe ExpresswayMecklenburg
&
Union
NCDOTR-3329
&
R-2559
Late 2018Overall Maps18sliderThis will be a toll road

Contact strnluvr for BOTG. Editor lives close to this project
2013 Overall Map
35
Map 12013 Map 1
36
Map 2A2013 Map 2
37
Map 2B2013 Map 3
38
Map 2C2013 Map 4
39
Map 3A2013 Map 5
40
Map 3B2013 Map 6
41
2013 Map 7
42
2013 Map 8
43
I-40 / I-440 Rebuild
FORTIFY
WakeNCDOTI-5338
& I-5311
Spring 2017LinkMapss18sliderEventMajor lane shifts and ramp closures6560
44
New I-85 Weigh StationGastonTIMSNov 15, 2016Links18sliderNB Lanes shifted and SL Lowered6555
45
US-501 BypassPersonLinkNeeds to be updated.
46
Klumac Road Grade SeparationRowanNCDOTU-3459Nov 2016LinkMap 1dfortneyComplete. Need BOTG / updated SV / satellite to verify details (incl. name of Old Klumac sections)
47
Map 2
48
Salem Creek ConnectorForsythNCDOTU-2925July / Nov 2017LinkMap 1dfortneySalem Creek Connector opened 7/12/2017. Some construction remaining
49
Map 2
50
I-40 and I-77 InterchangeIredellNCDOTI-3819AMay 16, 2017LinkFact SheetdfortneyI-40 being widened from 4 to 6 lanes, some I-40 W of the interchange is temporarily routed onto ramp roads60
51
Project Map
52
Future I-73
(Guilford County)
GuilfordNCDOTI-5110 and R-2413ABJun 2017LinkFuture I-73 Western Enddfortney9.4 mile road to be designated I-73 from Bryan Blvd, crossing NC-68 and ending at US-220. Road has opened. Some signage remains unfinished as of July 2017
53
Future I-73 Map 1
54
Future I-73 Map 2
55
Future I-73 Map 3
56
Future I-73 Map 4
57
Future I-73 Map 5
58
I-73/74 Richmond CountyRichmondR-3421CApr 9, 2018LinkProject PlansdfortneyUpgrade section of US-220 to controlled access FW as part of Southern expansion of I-73 / I-74
59
Transportation Mgt Plan
60
Ray Rd SR-1121HarnettNCDOTU-3465Jun 30, 2018LinkMap 1s18sliderWidening of SR-1121 (Ray Rd) From NC-210 TO SR-1120 (Overhills Rd).
61
Map 2
62
Map 3
63
I-85 BUS / NC-8DavidsonLinkdfortneyNew ramps to/from I-85 BUS / US-29 / US-64 to NC-8
64
65
Troy BypassMontgomeryR-0623Early 2019LinkDesign Maps18sliderNC-24/27 around Troy, NC
66
Design Plans
67
Signing Plans
68
US-17 BypassJones
Craven
NCDOTR-25142020LinkR-2514B Mapnolay2011
s18slider
Partially open already around Maysvile
69
R-2514B Surface Plans
70
R-2514B Design Plans
71
R-2514B Signing Plans
72
LinkR-2514C Surface Plans
73
R-2514C Design Plans
74
LinkR-2514D Surface Plans
75
R-2514D Design Plans
76
R-2514D Signing Plans
77
Winston-Salem Northern BeltwayForsythNCDOTU-2579 / R-2247First section open: May 2020
Completion: TBD
LinkdfortneyProject has two parts: Eastern Loop (17.1 miles - from US-52 to I-74/US-311) and Western Loop (from US-158 to US-52)
78
Project Maps
79
Eastern / Western Loop maps
80
C.F. Harvey Parkway ExtensionLenoirNCDOTR-5703Completion Date:2022LinkOnmywaysirWork is underway on a proposed project to extend C.F. Harvey Parkway (N.C. 148) another 5.8 miles from N.C. 58 to N.C. 11 north of Kinston to improve connectivity in northern Kinston between U.S. 70, N.C. 58 and N.C. 11
81
https://www.ncdot.gov/projects/cf-harvey-parkway/Documents/prelim_designs_alt_2.pdf
82
Lane of I-40 Closing as Rehab ProjectDavieNCDOTMay 29LinkOnmywaysirThe contract crew plans to close the right lane of eastbound I-40 between mile marker 169 near Mocksville and mile marker 164 near the Cool Springs community to conduct shoulder work and paving from April 22 until Memorial Day weekend.
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100