ABCDEFGHIJKLMNOPQRSTUVWXYZAAABACADAEAFAGAHAIAJAKALAMANAOAPAQARASATAUAVAWAXAYAZBABBBCBDBEBFBGBHBIBJBKBLBMBNBOBPBQBRBSBTBUBVBWBXBYBZCACBCCCDCECFCGCHCICJCKCLCMCNCOCPCQCRCSCTCUCV
1
Sample Environment Testing and Maintenance Schedule 2024
January
February
5
Calendar Day:1234567891011121314151617181920212223242526272829303112345678910111213141516171819
7
8
3T Magnet NGD
9
7T Magnet*
10
9T MagnetOut of ServiceOut of Service
11
10T Magnet*
12
11T Magnet
13
15T Magnet*Out of ServiceOut of Service
14
3He Insert (7T)
15
3He Insert (OC)
16
Dil Fridge Insert (Oxford 15T)
17
Dil Fridge Insert (ICE)
18
50mm OC #1 (SANS)
19
50mm OC #2 (short)
20
50mm OC #10 (ICE)
21
50mm OC #12 (HFBS)
22
50mm OC #14 (MACS PB)
23
70mm OC #5 ShortOut of ServiceOut of Service
24
70mm OC #7 (DCS Round)
25
70 mm OC #8 (DCS Square)Out of ServiceOut of Service
26
70mm OC #9 (SB)
27
70mm OC #13 (short)
28
100mm OC #4 (MACS)
29
3He Big Blue
30
3He SD55
31
Furnace (600 C) BNL
32
Furnace (1400 C) HFBSOut of ServiceOut of Service
33
Furnace (1600 C)
34
Pressure Rig A
35
Pressure Rig B
36
Syringe Pump (68.95 MPa)
37
LIPSS (350 MPa)
38
Gas Loading Cart 1 (200 bar)
39
Gas Loading Cart 2 (35 bar)
40
Gas Loading Cart 3 (200 bar) CC
41
CCR-H03 (25-600K)
42
CCR-5 (5-325 K)
43
CCR-8 (5-325 K)
44
CCR-9 (10-325 K)
46
CCR-11 (4-325 K) NGDOut of ServiceOut of Service
47
CCR-12 (4-325 K) NGD
48
CCR-13 (5-325 K) Offline Only
49
CCR-14 (5-325 K)
50
CCR-17 (5-325 K)
51
CCR-18 (9-420 K)
52
CCR-19 (9-420 K)
53
CCR-20 (3-325 K)
54
CCR-21 (3-325 K)
55
CCR-22 (3-325 K)
56
CCR-23 (3-325 K)
57
CCR-24 (3-325 K)
58
CCR-25 (14-750 K)
59
CCR-26 (14-750 K)
60
CCR-27 (14-750 K)
61
CCR-28 (14-750 K)
62
CCR-40 (4-325 K) Cradle BT4
63
CCR-41 (4-325 K) CANDOR
64
TLCCR-1 NSE
65
TLCCR-2 HFBS
66
TLCCR-3 DCS
67
TLCCR-4 FANS
68
TLCCR-5 Short
69
TLCCR-6 ShortOut of ServiceOut of Service
70
7T TLCCR Insert
71
Sourcemeter (20 W) Refl
72
Power Supply (5 kV) Refl
73
Power Supply (5 kV)
74
MANIACS
75
MUZAC
76
77
Not all equipment is available for all instruments.
78
Editing Notes:
79
* Magnet requires or has the option of an ultra-low temperature insert.
Conditional formatting sets the color to match the instrument to the Key in the bottom-right of the sheet. Use the exact initial 3-6 characters.
80
For multiple day experiments, merge the cells.
81
To delete an entry, copy over it with a blank cell to preserve the conditional formatting.
82
Most equipment requires minimum 1 day of prep before experiment and one day of rad cooldown after exposure to neutrons.
Do not schedule back-to-back experiments without coordinating with SE tech first.
Do not use CUT-Paste. Only use COPY-paste.
83
Do not hide columns across merged cells.
84
Unavailable equipment (damage/maintenance/personnel unavailable for support) should be blocked out in grey.
85
Duplicate the entire sheet for a new reactor cycle.
86
When a cycle is over, right-click the tab to Hide the sheet.
87
88
Required Format:
Example:
89
Instrument +Option (IMS ID) LocalContact
BT1 +5kV +7T (12345) Brown
90
91
This sheet is managed by Tanya Dax, NCNR Sample Environment.
92
93
94
95
96
97
98
99
100
101