Streambank Sediment & Nutrient Reduction Crediting* Mitchell Woodward, NC Cooperative Extension
11
12
1200
Total Linear Feet of Streambank Repaired (assumes 1 bank, 2x if repairing both banks)
User supplied data
13
5
Avg Height of Streambank (vertical difference from OHWM to Top of Bank)
Calculated
14
368
Estimated Annual Soil Erosion Reduction (tons post-repair)*
15
654
Estimated Annual N Reduction (lbs)
16
386
Estimated Annual P Reduction (lbs)
17
$52,390
Value of Nitrogen Removed Per Year (Total lbs of N removed * $80.08/lb of N from average DMS)**
18
$119,884
Value of Phosphorus Removed Per Year (Total lbs of P removed * $310.65/lb of P from average DMS)**
19
20
References and Assumptions for the Above Calculations
21
*Area of triangular shaped bank*length of bank repaired*avg wt. cubic ft of soil/2000 lbs ton*73% avg effectivness of repairs
22
**Reference: https://www.chesapeakebay.net/channel_files/30006/nutrient_credit_evaluation_final_report_ncsu_9-17-18.pdf Dr. Barbara Doll, PE
23
***Nutrient fee schedules from NC Div of Mitigation Services. https://deq.nc.gov/about/divisions/mitigation-services/dms-customers/fee-schedules. Mean from 3 river basins 2016: N $80.08/lb, P $310.65/lb
24
****NOTE: The BEHI rating can used to evaluate sediment reduction before and after the repair project.
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100