ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
Labor and Material Estimate Template
2
Use this worksheet for project information, customer-facing scope notes, and final estimate totals. Detailed cost buildup belongs on the Labor, Materials, and Equipment & Other worksheets.
3
4
5
Estimate Information
6
Estimate numberEstimate revision
7
Estimate dateCustomer/company
8
Customer contactProject name
9
Project addressEstimator
10
Scope or tradeProject type / pricing useBase estimate or change-order pricing
11
12
Estimate Totals
13
Labor subtotal$0.00
Configurable inclusions
Include in grand total?
14
Material subtotal$0.00Add alternatesNo
15
Equipment subtotal$0.00Deduct alternatesNo
16
Subcontractor subtotal$0.00AllowancesYes
17
Other direct cost subtotal$0.00Optional pricingNo
18
Total direct cost$0.00
19
Overhead total$0.00
20
Profit total$0.00
21
Tax total$0.00
22
Grand total$0.00
23
24
Scope Notes
25
Estimate assumptionsEnter production assumptions, access conditions, phasing, work-hour limits, height, congestion, or other labor-impacting conditions.
26
27
Scope inclusionsDescribe the work included in this estimate.
28
29
ExclusionsEnter exclusions that apply to this specific estimate. Do not use generic exclusions without reviewing the bid documents.
30
31
Alternates or optional pricingSummarize alternates, allowances, or optional pricing, and indicate whether they are included in the grand total.
32
33
Revision notesDocument changes made since the previous estimate revision.
34
35
Internal estimator notesInternal notes can be kept here or on detailed worksheets. Remove or hide before customer distribution if needed.
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100