ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
2
Create professional Gantt charts in GanttPRO in a few clicks
3
4
New Home Construction Budget6/13/2026
5
Color
WBS Number
Task name / TitleAssigned to
Planned start date
Planned end date
Deadline
Progress (%)
Duration (hours)
Estimated hours
Time log (minutes)
StatusPriority
Task description
Cost
Actual cost
6
1ZONING9/13/202611/15/202603680000
7
1.1Land Use9/13/202611/14/2026036000OpenMedium00
8
1.2Easements, Set Backs9/16/202611/15/2026036000OpenMedium00
9
1.3Access, Street Improvements9/16/202611/15/2026036000OpenMedium00
10
1.4Utilities Available9/16/202611/15/2026036000OpenMedium00
11
2HOUSE PLANS11/18/20261/22/202703840000
12
2.1Purchase Standard Plans11/18/20261/17/2027036000OpenMedium00
13
2.2Architect Original Drawings11/19/20261/20/2027036000OpenMedium00
14
2.3Specifications11/20/20261/21/2027036000OpenMedium00
15
2.4Architect Manage Job11/21/20261/22/2027036000OpenMedium00
16
2.5Engineer-Loads & Spans11/21/20261/22/2027036000OpenMedium00
17
2.6Draftsman11/21/20261/22/2027036000OpenMedium00
18
3LOT SURVEY1/23/20273/31/202703840000
19
3.1House & Driveway1/23/20273/26/2027036000OpenMedium00
20
3.2Well Locaton1/24/20273/27/2027036000OpenMedium00
21
3.3Septic Location1/27/20273/28/2027036000OpenMedium00
22
3.4Fire Hydrant & Truck Access1/28/20273/31/2027036000OpenMedium00
23
3.5Plot Plan1/28/20273/31/2027036000OpenMedium00
24
4FINANCIAL - LOAN4/1/20276/5/202703840000
25
4.1Land Cost4/1/20276/2/2027036000OpenMedium00
26
4.2Interest on Land4/2/20276/3/2027036000OpenMedium00
27
4.3Interest on Const. Loan4/3/20276/4/2027036000OpenMedium00
28
4.4Points, Etc.4/4/20276/5/2027036000OpenMedium00
29
5SEWER & WATER HOOKUP10/7/202612/6/2026036000OpenMedium00
30
6HEALTH PERMIT10/7/202612/10/202603760000
31
6.1Fees10/7/202612/6/2026036000OpenMedium00
32
6.2Percolation Test10/8/202612/9/2026036000OpenMedium00
33
6.3Soils Engineer10/9/202612/10/2026036000OpenMedium00
34
7INSURANCE10/10/202612/11/2026036000OpenMedium00
35
8LOT CLOSING COSTS10/11/202612/12/2026036000OpenMedium00
36
9BUILDING PERMITS10/14/202612/13/202603600000
37
9.1Fees10/14/202612/13/2026036000OpenMedium00
38
9.2Inspection Schedule10/14/202612/13/2026036000OpenMedium00
39
10PRELIMINARY LIST ONLY10/15/202612/16/2026036000OpenMedium00
40
11BUILD PHASE10/16/202612/17/2026036000OpenMedium00
41
12SPECIAL & DRY IN MATERIALS10/18/202612/20/202603680000
42
12.1Rough Hardware, Misc.10/18/202612/19/2026036000OpenMedium00
43
12.2Lolly Columns10/21/202612/20/2026036000OpenMedium00
44
12.3Steel Beams10/21/202612/20/2026036000OpenMedium00
45
12.4Rough Lumber, Trusses10/21/202612/20/2026036000OpenMedium00
46
13WINDOWS/OPENINGS10/23/202612/26/202603760000
47
13.1Windows, Grills, Screens10/23/202612/24/2026036000OpenMedium00
48
13.2Exterior Doors,Screens10/24/202612/25/2026036000OpenMedium00
49
13.3Skylights and Light Tubes10/25/202612/26/2026036000OpenMedium00
50
14DEMOLITION10/28/202612/27/2026036000OpenMedium00
51
15LOT CLEARING10/28/202612/31/202603760000
52
15.1Debris Removal & Clearing10/28/202612/27/2026036000OpenMedium00
53
15.2Dump Fee10/29/202612/30/2026036000OpenMedium00
54
15.3Bury Stumps, etc.10/30/202612/31/2026036000OpenMedium00
55
16DRIVEWAY, rough11/1/20261/3/202703680000
56
16.1Grade11/1/20261/2/2027036000OpenMedium00
57
16.2Base Rock, Culverts11/4/20261/3/2027036000OpenMedium00
58
17UTILITIES11/4/20261/6/202703680000
59
17.1Temporary at startup11/4/20261/3/2027036000OpenMedium00
60
17.2Transfer to permanent11/5/20261/6/2027036000OpenMedium00
61
18WELL or PUBLIC WATER11/6/20261/7/2027036000OpenMedium00
62
19SEPTIC or PUBLIC SEWER11/7/20261/8/2027036000OpenMedium00
63
20LAYOUT HOUSE FOOTPRINT11/11/20261/10/202703600000
64
20.1Establish Finish Floor Height11/11/20261/10/2027036000OpenMedium00
65
20.2Set Back Distances11/11/20261/10/2027036000OpenMedium00
66
21DIG FOUNDATION11/11/20261/10/2027036000OpenMedium00
67
22ROCK PROBLEM11/12/20261/13/2027036000OpenMedium00
68
23PREPARE FOR FOOTINGS11/14/20261/16/202703680000
69
23.1Lay out and excavate11/14/20261/15/2027036000OpenMedium00
70
23.2Form, Rebar, Grade Pegs11/15/20261/16/2027036000OpenMedium00
71
24POUR FOOTINGS & PADS11/18/20261/17/202703600000
72
24.1Yds. of Concrete11/18/20261/17/2027036000OpenMedium00
73
25SET BRICK POINTS11/18/20261/17/2027036000OpenMedium00
74
26TERMITE TREATMENT11/19/20261/20/2027036000OpenMedium00
75
27RADON CONTROL11/20/20261/21/2027036000OpenMedium00
76
28FOUNDATION WALLS11/22/20261/28/202703840000
77
28.1Block/Course11/22/20261/23/2027036000OpenMedium00
78
28.2Piers11/25/20261/24/2027036000OpenMedium00
79
28.3Pour Wall, Yds. Of Concrete11/25/20261/24/2027036000OpenMedium00
80
28.4Lintels, Rebar11/25/20261/24/2027036000OpenMedium00
81
28.5Parging11/26/20261/27/2027036000OpenMedium00
82
28.6Cement, Sand, etc.11/27/20261/28/2027036000OpenMedium00
83
29WATERPROOF FOUNDATION.11/28/20261/29/2027036000OpenMedium00
84
30COLUMNS/BEAMS SET11/29/20261/30/2027036000OpenMedium00
85
31UNDERGROUND PLUMBING12/2/20261/31/2027036000OpenMedium00
86
32BRICK/STONE, to finish grade12/2/20261/31/2027036000OpenMedium00
87
33GARAGE DOORS12/3/20262/4/202703680000
88
33.1Openers12/3/20262/3/2027036000OpenMedium00
89
33.2Trim, Backing, Weatherstrip12/4/20262/4/2027036000OpenMedium00
90
34DRAIN TILE12/5/20262/5/2027036000OpenMedium00
91
35FIRE PLACE - INTERIOR12/9/20262/7/202703600000
92
35.1Pour Hearth12/9/20262/7/2027036000OpenMedium00
93
35.2Firebox, or Set Prefab12/9/20262/7/2027036000OpenMedium00
94
35.3Brick or Stone Facing12/9/20262/7/2027036000OpenMedium00
95
36PREPARE CONC. SLABS ETC.12/11/20262/14/202703840000
96
36.1Gravel, Wire, Poly, Grade Stakes12/11/20262/11/2027036000OpenMedium00
97
36.2Labor to Prepare for Slab12/12/20262/12/2027036000OpenMedium00
98
36.3Rebar, Wire, form boards12/13/20262/13/2027036000OpenMedium00
99
36.4
Labor-Prepare, Form other Conc.
12/16/20262/14/2027036000OpenMedium00
100
36.5
Deck & Post Hole footings, etc.
12/16/20262/14/2027036000OpenMedium00