4
New Home Construction Budget7/14/2026
5
Color
WBS Number
Task name / TitleAssigned to
Planned start date
Planned end date
Deadline
Progress (%)
Duration (hours)
Estimated hours
Time log (minutes)
StatusPriority
Task description
Cost
Actual cost
6
1ZONING10/14/202612/16/202603680000
7
1.1Land Use10/14/202612/15/2026036000OpenMedium00
8
1.2Easements, Set Backs10/17/202612/16/2026036000OpenMedium00
9
1.3Access, Street Improvements10/17/202612/16/2026036000OpenMedium00
10
1.4Utilities Available10/17/202612/16/2026036000OpenMedium00
11
2HOUSE PLANS12/19/20262/22/202703840000
12
2.1Purchase Standard Plans12/19/20262/17/2027036000OpenMedium00
13
2.2Architect Original Drawings12/20/20262/20/2027036000OpenMedium00
14
2.3Specifications12/21/20262/21/2027036000OpenMedium00
15
2.4Architect Manage Job12/22/20262/22/2027036000OpenMedium00
16
2.5Engineer-Loads & Spans12/22/20262/22/2027036000OpenMedium00
17
2.6Draftsman12/22/20262/22/2027036000OpenMedium00
18
3LOT SURVEY2/23/20275/1/202703840000
19
3.1House & Driveway2/23/20274/26/2027036000OpenMedium00
20
3.2Well Locaton2/24/20274/27/2027036000OpenMedium00
21
3.3Septic Location2/27/20274/28/2027036000OpenMedium00
22
3.4Fire Hydrant & Truck Access2/28/20275/1/2027036000OpenMedium00
23
3.5Plot Plan2/28/20275/1/2027036000OpenMedium00
24
4FINANCIAL - LOAN5/2/20277/6/202703840000
25
4.1Land Cost5/2/20277/3/2027036000OpenMedium00
26
4.2Interest on Land5/3/20277/4/2027036000OpenMedium00
27
4.3Interest on Const. Loan5/4/20277/5/2027036000OpenMedium00
28
4.4Points, Etc.5/5/20277/6/2027036000OpenMedium00
29
5SEWER & WATER HOOKUP11/7/20261/6/2027036000OpenMedium00
30
6HEALTH PERMIT11/7/20261/10/202703760000
31
6.1Fees11/7/20261/6/2027036000OpenMedium00
32
6.2Percolation Test11/8/20261/9/2027036000OpenMedium00
33
6.3Soils Engineer11/9/20261/10/2027036000OpenMedium00
34
7INSURANCE11/10/20261/11/2027036000OpenMedium00
35
8LOT CLOSING COSTS11/11/20261/12/2027036000OpenMedium00
36
9BUILDING PERMITS11/14/20261/13/202703600000
37
9.1Fees11/14/20261/13/2027036000OpenMedium00
38
9.2Inspection Schedule11/14/20261/13/2027036000OpenMedium00
39
10PRELIMINARY LIST ONLY11/15/20261/16/2027036000OpenMedium00
40
11BUILD PHASE11/16/20261/17/2027036000OpenMedium00
41
12SPECIAL & DRY IN MATERIALS11/18/20261/20/202703680000
42
12.1Rough Hardware, Misc.11/18/20261/19/2027036000OpenMedium00
43
12.2Lolly Columns11/21/20261/20/2027036000OpenMedium00
44
12.3Steel Beams11/21/20261/20/2027036000OpenMedium00
45
12.4Rough Lumber, Trusses11/21/20261/20/2027036000OpenMedium00
46
13WINDOWS/OPENINGS11/23/20261/26/202703760000
47
13.1Windows, Grills, Screens11/23/20261/24/2027036000OpenMedium00
48
13.2Exterior Doors,Screens11/24/20261/25/2027036000OpenMedium00
49
13.3Skylights and Light Tubes11/25/20261/26/2027036000OpenMedium00
50
14DEMOLITION11/28/20261/27/2027036000OpenMedium00
51
15LOT CLEARING11/28/20261/31/202703760000
52
15.1Debris Removal & Clearing11/28/20261/27/2027036000OpenMedium00
53
15.2Dump Fee11/29/20261/30/2027036000OpenMedium00
54
15.3Bury Stumps, etc.11/30/20261/31/2027036000OpenMedium00
55
16DRIVEWAY, rough12/2/20262/3/202703680000
56
16.1Grade12/2/20262/2/2027036000OpenMedium00
57
16.2Base Rock, Culverts12/5/20262/3/2027036000OpenMedium00
58
17UTILITIES12/5/20262/6/202703680000
59
17.1Temporary at startup12/5/20262/3/2027036000OpenMedium00
60
17.2Transfer to permanent12/6/20262/6/2027036000OpenMedium00
61
18WELL or PUBLIC WATER12/7/20262/7/2027036000OpenMedium00
62
19SEPTIC or PUBLIC SEWER12/8/20262/8/2027036000OpenMedium00
63
20LAYOUT HOUSE FOOTPRINT12/12/20262/10/202703600000
64
20.1Establish Finish Floor Height12/12/20262/10/2027036000OpenMedium00
65
20.2Set Back Distances12/12/20262/10/2027036000OpenMedium00
66
21DIG FOUNDATION12/12/20262/10/2027036000OpenMedium00
67
22ROCK PROBLEM12/13/20262/13/2027036000OpenMedium00
68
23PREPARE FOR FOOTINGS12/15/20262/16/202703680000
69
23.1Lay out and excavate12/15/20262/15/2027036000OpenMedium00
70
23.2Form, Rebar, Grade Pegs12/16/20262/16/2027036000OpenMedium00
71
24POUR FOOTINGS & PADS12/19/20262/17/202703600000
72
24.1Yds. of Concrete12/19/20262/17/2027036000OpenMedium00
73
25SET BRICK POINTS12/19/20262/17/2027036000OpenMedium00
74
26TERMITE TREATMENT12/20/20262/20/2027036000OpenMedium00
75
27RADON CONTROL12/21/20262/21/2027036000OpenMedium00
76
28FOUNDATION WALLS12/23/20262/28/202703840000
77
28.1Block/Course12/23/20262/23/2027036000OpenMedium00
78
28.2Piers12/26/20262/24/2027036000OpenMedium00
79
28.3Pour Wall, Yds. Of Concrete12/26/20262/24/2027036000OpenMedium00
80
28.4Lintels, Rebar12/26/20262/24/2027036000OpenMedium00
81
28.5Parging12/27/20262/27/2027036000OpenMedium00
82
28.6Cement, Sand, etc.12/28/20262/28/2027036000OpenMedium00
83
29WATERPROOF FOUNDATION.12/29/20263/1/2027036000OpenMedium00
84
30COLUMNS/BEAMS SET12/30/20263/2/2027036000OpenMedium00
85
31UNDERGROUND PLUMBING1/2/20273/3/2027036000OpenMedium00
86
32BRICK/STONE, to finish grade1/2/20273/3/2027036000OpenMedium00
87
33GARAGE DOORS1/3/20273/7/202703680000
88
33.1Openers1/3/20273/6/2027036000OpenMedium00
89
33.2Trim, Backing, Weatherstrip1/4/20273/7/2027036000OpenMedium00
90
34DRAIN TILE1/5/20273/8/2027036000OpenMedium00
91
35FIRE PLACE - INTERIOR1/9/20273/10/202703600000
92
35.1Pour Hearth1/9/20273/10/2027036000OpenMedium00
93
35.2Firebox, or Set Prefab1/9/20273/10/2027036000OpenMedium00
94
35.3Brick or Stone Facing1/9/20273/10/2027036000OpenMedium00
95
36PREPARE CONC. SLABS ETC.1/11/20273/17/202703840000
96
36.1Gravel, Wire, Poly, Grade Stakes1/11/20273/14/2027036000OpenMedium00
97
36.2Labor to Prepare for Slab1/12/20273/15/2027036000OpenMedium00
98
36.3Rebar, Wire, form boards1/13/20273/16/2027036000OpenMedium00
99
36.4
Labor-Prepare, Form other Conc.
1/16/20273/17/2027036000OpenMedium00
100
36.5
Deck & Post Hole footings, etc.
1/16/20273/17/2027036000OpenMedium00