BCDEFGHIJKLMNOPQRSTUVWXYZ
1
Sotiyo - T1
2
High
3
0Blueprint ME
Number of builds
Base TritTrit x10T2 Rigged Sotiyo building 1 Cap Drone Bay:296,331
4
5714401
5
000orca11
6
5Target Tritanium needed:9,871,155
7
DO NOT EDIT BELOWNotes
8
2.0%Work on getting B19 into main sheet with options. Then have formulas use that cell for calculations. Make note on Job Insert Tab to switch structure that production will take place.
9
20%
10
1
11
0.01
If Sotiyo 0.9 * 0.99
12
0.3098.00%89.10%87.32%490.00%
13
0.00100.90.9
14
0.15498.00%89.10%87.32%41,817
15
0.00
16
0.054.2095.800.89185.3634
17
0.0200.0420.9580.8910.854
18
0.200.630.370.560.210
19
97.0200%0.948485.36%4
20
130.00%0.004
21
100.000.85364
22
0.76923076923.88080.873184
Structure ME Bonus
23
0.99
24
Bonus4.23.784
25
Realized %95.8
26
Sotiyo85.357844Base ME BonusRig BonusTotal
27
Rig MERig TEStruc MEStruc TENull/WHLowHigh97.0200%0.933.609
28
0.0200.200.010.102.11.91Imputs!$I$2
29
0.0240.240.010.102.11.91
30
0.0200.200.010.202.11.91
31
0.0240.240.010.202.11.91
32
0.0200.200.010.302.11.91
33
0.0240.240.010.302.11.91
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100