A | B | C | |
---|---|---|---|
1 | |||
2 | SCOPE OF WORK TEMPLATE | ||
3 | |||
4 | PROJECT ADDRESS: | ||
5 | COMPANY: | ||
6 | NAME: | ||
7 | PHONE: | ||
8 | EMAIL: | ||
9 | |||
10 | STATEMENT OF WORK What does the project entail? | ||
11 | |||
12 | |||
13 | PRE-CONSTRUCTION | MATERIAL + LABOR | |
14 | PERMITS | ||
15 | ARCHITECTURAL/ENGINEERING DRAWINGS | ||
16 | TERMITE INSPECTION/TREATMENT | ||
17 | RENTAL EQUIPMENT | ||
18 | WELL/SEPTIC | ||
19 | OTHER | ||
20 | |||
21 | |||
22 | TOTAL | ||
23 | |||
24 | DEMOLITION | MATERIAL + LABOR | |
25 | DEMO | ||
26 | DEBRIS/REMOVAL | ||
27 | DUMPSTERS | ||
28 | OTHER | ||
29 | |||
30 | |||
31 | |||
32 | TOTAL | ||
33 | |||
34 | FRAMING | MATERIAL + LABOR | |
35 | INTERIOR/EXTERIOR STRUCTURAL | ||
36 | INTERIOR NO LOAD | ||
37 | SUB FLOORS | ||
38 | REPAIRS | ||
39 | FOUNDATION | ||
40 | OTHER | ||
41 | |||
42 | |||
43 | |||
44 | TOTAL | ||
45 | |||
46 | ROOFING | MATERIAL + LABOR | |
47 | NEW | ||
48 | REPAIR | ||
49 | CHIMNEY | ||
50 | OTHER | ||
51 | |||
52 | |||
53 | |||
54 | TOTAL | ||
55 | |||
56 | PLUMBING | MATERIAL + LABOR | |
57 | ROUGH IN | ||
58 | FIXTURES | ||
59 | PLUMBING FINAL | ||
60 | WATER HEATER | ||
61 | OTHER | ||
62 | |||
63 | |||
64 | TOTAL | ||
65 | |||
66 | ELECTRICAL WORK | MATERIAL + LABOR | |
67 | ROUGH IN | ||
68 | FIXTURES | ||
69 | ELECTRICAL FINAL | ||
70 | OTHER | ||
71 | |||
72 | |||
73 | |||
74 | |||
75 | TOTAL | ||
76 | |||
77 | MECHANICAL | MATERIAL + LABOR | |
78 | HVAC ROUGH IN | ||
79 | HVAC FINAL/UNITS/GRILLS | ||
80 | OTHER | ||
81 | |||
82 | |||
83 | |||
84 | TOTAL | ||
85 | |||
86 | INSULATION | MATERIAL + LABOR | |
87 | WALLS | ||
88 | CEILINGS | ||
89 | OTHER | ||
90 | |||
91 | |||
92 | |||
93 | |||
94 | TOTAL | ||
95 | |||
96 | DRYWALL | MATERIAL + LABOR | |
97 | DRYWALL INSTALLATION | ||
98 | FINISH | ||
99 | REPAIR | ||
100 | OTHER |