1 | Mine Name | Mine Name (AKAs and Non-ENG) | GEM Wiki Page (ENG) | Status | Status Detail | Project Type | Project Phase | Operators | Owners | Production or Capacity Data | Coal Output (Annual, Mmt) | Reserves Type | Reserve Size (Mmt) | Mine Type | Mining Method | Mine Size (Km2) | Mine Depth (m) | Depth Accuracy | Coal Type | Coal Grade | Methane Gas Content (m^3/tonne) | Coal Mine Methane Emissions (MCM/yr) | Carbon Dioxide Emissions (Mt) CO2/yr) | Worforce Size | Coalfield | Location | County | Prefecture, District | Province | Opening Year | Reported Life of Mine (Remaining) | Primary Consumer, Destination | Coal Plant, Steel Plant, Terminal | Coal Plant, Steel Plant, Termnial Wiki |
2 | Alexander Coal Project | https://www.gem.wiki/Alexander_Coal_Project | Proposed | Pre-Permit | New | Sasol Mining | Sasol | Capacity | 8 | Underground | 80 | Estimate | Bituminous | 4.4 | 56.3 | 19.2 | Witbank | Kriel | Emalahleni | Nkangala | Mpumalanga | 2025 | ||||||||||||
3 | Bernice-Cygnus Coal Mine | https://www.gem.wiki/Bernice_coal_project | Proposed | Pre-Permit | New | Universal Coal | Universal Coal | Capacity | 10 | Recoverable | 402 | Surface | Open Pit | 50 | 59 | Estimate | Bituminous | Met | 3.5 | 52.5 | 26.2 | Soutpansberg | Musina | Vhembe | Limpopo | TBD | 25 | |||||||
4 | Birmingham Coal Mine | https://www.gem.wiki/Birmingham_coal_mine | Proposed | Pre-Permit | New | Canyon Coal | Canyon Coal | Capacity | 3.6 | Underground | 80 | Estimate | Bituminous | 4.4 | 25.3 | 8.6 | Ermelo | Hendrina | Steve Tshwete | Nkangala | Mpumalanga | TBD | 13 | Coal Plant | Arnot Power Station | https://www.gem.wiki/Arnot_Power_Station | ||||||||
5 | Boikarabelo Coal Mine | https://www.gem.wiki/Boikarabelo_Coal_Mine | Proposed | Permitted | New | Resgen South Africa | Resource Generation Australia | Capacity | 6 | Recoverable | 995 | Surface | Open Pit | 89 | 30 | Exact | Bituminous | Thermal | 1.9 | 17.1 | 14.4 | Waterberg | Resgen | Limpopo | TBD | 60 | Coal Plant | Boikarabelo Power Station | https://www.gem.wiki/Boikarabelo_power_station_(Resgen) | |||||
6 | Boschkrans Coal Mine | https://www.gem.wiki/Boschkrans_coal_project | Proposed | Exploration | New | Puckree Group | Puckree Group | Capacity | 1.2 | Recoverable | 31 | Underground & Surface | Mixed | 50 | Estimate | Subbituminous | 0.8 | 1.4 | 2.1 | Highveld, Ermelo | Bethal | Govan Mbeki | Gert Sibande | Mpumalanga | TBD | 15 | ||||||||
7 | Davel Coal Project | https://www.gem.wiki/Davel_coal_project | Proposed | Pre-Permit | New | Scinta South Africa | Scinta South Africa | Capacity | 5 | Recoverable | 320 | Underground | 80 | Estimate | Bituminous | Thermal | 4.4 | 35.2 | 12.0 | Ermelo | Ermelo | Msukaligwa | Gert Sibande | Mpumalanga | TBD | 50 | ||||||||
8 | De Wittekrans Coal Mine | https://www.gem.wiki/De_Wittekrans_coal_mine | Proposed | Pre-Permit | New | Canyon Coal | Canyon Coal | Capacity | 3.6 | Recoverable | 80 | Underground & Surface | Mixed | 50 | Estimate | Subbituminous | Thermal | 0.8 | 4.3 | 6.4 | 430 | Ermelo | Hendrina | Steve Tshwete | Nkangala | Mpumalanga | 2020 | 22 | ||||||
9 | Eloff Coal Project | Kangala extension | https://www.gem.wiki/Eloff_coal_project | Proposed | Pre-Permit | Expansion | Eloff Mining Company | Ndalamo Resources (70%), Universal Coal (29%), Others (1%) | Capacity | 2.4 | Recoverable | 41 | Surface | Open Pit | 81.68 | 37 | Exact | Bituminous | Thermal | 2.1 | 7.6 | 5.8 | Delmas | Delmas | Victor Khanye | Nkangala | Mpumalanga | TBD | 20 | |||||
10 | Greater Soutpansberg Coal Project | Chapudi, Mopane, Generaal | https://www.gem.wiki/Greater_Soutpansberg_Project | Proposed | Pre-Permit | New | MC Mining (74%), Black Economic Empowerment (26%) | Capacity | 16.4 | Recoverable | 1051 | Surface | Mixed | 59 | Estimate | Bituminous | Thermal & Met | 3.5 | 86.1 | 39.3 | Soutpansberg | Mudimeli | Makhado | Vhembe | Limpopo | TBD | ||||||||
11 | Hendrina Coal Mine | https://www.gem.wiki/Hendrina_coal_project | Proposed | Exploration | New | Umcebo | Glencore | Capacity | 2.4 | Recoverable | 44 | Underground | 80 | Estimate | Bituminous | Thermal | 4.4 | 16.9 | 5.8 | Ermelo | Hendrina | Steve Tshwete | Nkangala | Mpumalanga | TBD | 30 | ||||||||
12 | Koornfontein Coal Mine | KCM, Blinkpan | https://www.gem.wiki/Koornfontein_coal_mine | Proposed | Construction | Recommission | Black Royalty Minerals | Makole Group | Capacity | 3.7 | Underground & Surface | Mixed | 80 | Estimate | Bituminous | Thermal | 4.4 | 26.0 | 8.9 | 2000 | Witbank | Witbank | eMalahleni | Nkangala | Mpumalanga | 1991 | ||||||||
13 | Koppie Coal Mine | https://www.gem.wiki/Koppie_coal_mine | Proposed | Pre-Permit | New | Canyon Coal | Canyon Coal | Capacity | 1.8 | Underground | 80 | Estimate | Bituminous | 4.4 | 12.7 | 4.3 | Highveld | Bethal | Govan Mbeki | Gert Sibande | Mpumalanga | TBD | 20 | |||||||||||
14 | Kranspan Coal Project | https://www.gem.wiki/Kranspan_coal_project | Proposed | Pre-Permit | New | Ilima Coal Company | Ilima Coal Company | Capacity | 2.16 | Recoverable | 25 | Underground & Surface | Mixed | 50 | Estimate | Subbituminous | Thermal | 0.8 | 2.6 | 3.9 | Ermelo | Carolina | Albert Luthuli | Gert Sibande | Mpumalanga | TBD | 12 | |||||||
15 | Leeuwpan Coal Mine | https://www.gem.wiki/Leeuwpan_coal_mine | Proposed | Construction | Expansion | Exxaro Coal | Exxaro | Capacity | 2.7 | Recoverable | 52 | Surface | Open Pit | 59 | Estimate | Bituminous | Thermal | 3.5 | 14.2 | 6.5 | Witbank | Delmas | Victor Khanye | Nkangala | Mpumalanga | 2020 | 11 | Coal Plant | Malta Power Station | https://www.gem.wiki/Matla_Power_Station | ||||
16 | Leslie 1 Coal Mine | https://www.gem.wiki/Leslie_1_Mining_Project | Proposed | Permitted | New | Anglo American | Anglo American | Capacity | 4 | Recoverable | 125 | Underground | 97 | 70 | Exact | Bituminous | 4 | 25.6 | 9.6 | 685 | Highveld | Leander | Govan Mbeki | Gert Sibande | Mpumalanga | TBD | 35 | |||||||
17 | Makhado Coal Mine | https://www.gem.wiki/Makhado_coal_mine | Proposed | Permitted | Expansion | Stage 2 | MC Mining, Industrial Development Corporation | MC Mining (95%), Industrial Development Corporation (5%) | Capacity | 1.6 | Recoverable | 188 | Surface | Open Pit | 81.90 | 30 | Exact | Bituminous | Thermal & Met | 1.9 | 4.6 | 3.8 | 650 | Soutspanberg | Mudimeli | Makhado | Vhembe | Limpopo | 2022 | 29 | ||||
18 | Makhado Coal Mine | https://www.gem.wiki/Makhado_coal_mine | Proposed | Construction | New | Stage 1 | MC Mining, Industrial Development Corporation | MC Mining (95%), Industrial Development Corporation (5%) | Capacity | 1.1 | Recoverable | 188 | Surface | Open Pit | 81.90 | 17 | Exact | Bituminous | Thermal & Met | 1.3 | 2.1 | 2.6 | Soutspanberg | Mudimeli | Makhado | Vhembe | Limpopo | 2020 | 9 | |||||
19 | Moabsvelden Coal Mine | https://www.gem.wiki/Moabsvelden_coal_project | Proposed | Construction | New | Wescoal | Wescoal | Capacity | 2 | Recoverable | 44 | Surface | Open Pit | 59 | Estimate | Bituminous | Thermal | 3.5 | 10.5 | 4.8 | Witbank | Delmas | Victor Khanye | Nkangala | Mpumalanga | TBD | 14 | |||||||
20 | New Largo Coal Mine | https://www.gem.wiki/New_Largo_coal_mine | Proposed | Pre-Permit | New | New Largo Coal | Seriti (45%), Industrial Development Corporation (23%), Coalzar (23%) | Capacity | 12 | Recoverable | 585 | Surface | Open Pit | 59 | Estimate | Bituminous | Thermal | 3.5 | 63.0 | 28.8 | Witbank | Balmoral | Victor Khanye | Nkangala | Mpumalanga | TBD | Coal Plant | Kusile Power Station | https://www.gem.wiki/Kusile_Power_Station | |||||
21 | Paardekop Coal Mine | https://www.gem.wiki/Paardekop_coal_project | Proposed | Pre-Permit | New | Glencore | Glencore | Capacity | 8 | Recoverable | 695 | Underground | 80 | Estimate | Bituminous | Thermal | 4.4 | 56.3 | 19.2 | Ermelo | Perdekop | Pixley Ka Seme | Gert Sibande | Mpumalanga | TBD | 30 | Terminal (Export) | |||||||
22 | Springboklaagte Coal Mine | https://www.gem.wiki/Springboklaagte_coal_project | Proposed | Pre-Permit | New | Izimbiwa Coal, Umcebo | Glencore (50%), Phembani (50%) | Capacity | 2.4 | Recoverable | 87 | Underground & Surface | Mixed | 50 | Estimate | Subbituminous | Thermal | 0.8 | 2.9 | 4.3 | Witbank | Delmas | Victor Khanye | Nkangala | Mpumalanga | TBD | ||||||||
23 | Springfield Coal Mine | https://www.gem.wiki/Springfield_coal_project | Proposed | Pre-Permit | New | Canyon Coal | Menar | Capacity | 7.2 | Surface | Open Pit | 50 | Estimate | Subbituminous | Thermal | 0.8 | 8.6 | 12.9 | 800 | Sasolburg-Vereeneging | Vereeniging | Emfuleni | Sedibeng | Gauteng | 2021 | 37 | ||||||||
24 | Sterkfontein Coal Mine | https://www.gem.wiki/Sterkfontein_coal_project | Proposed | Exploration | New | Wescoal | Wescoal | Capacity | 1.57 | Recoverable | 24 | Underground | Bord and Pillar | 80 | Estimate | Bituminous | Thermal | 4.4 | 11.1 | 3.8 | Highveld | Bethal | Govan Mbeki | Gert Sibande | Mpumalanga | TBD | 15 | |||||||
25 | Thabametsi Coal Mine | https://www.gem.wiki/Thabametsi_coal_mine | Proposed | Permitted | New | Exxaro Coal | Exxaro | Capacity | 3.9 | Recoverable | 130 | Underground & Surface | Mixed | 50 | Estimate | Subbituminous | Thermal | 0.8 | 4.7 | 7.0 | Lephalale | Limpopo | 2021 | 30 | Coal Plant | Thabametsi Power Station | https://www.gem.wiki/Thabametsi_power_station | |||||||
26 | Ubuntu Coal Mine | Brakfontein | https://www.gem.wiki/Ubuntu_coal_project | Proposed | Pre-Permit | New | Ndalamo Resources (51%), Universal Coal (49%) | Capacity | 1.2 | Recoverable | 9 | Surface | Open Pit | 59 | Estimate | Bituminous | Thermal | 3.5 | 6.3 | 2.9 | Witbank | Delmas | Victor Khanye | Nkangala | Mpumalanga | TBD | 6 | |||||||
27 | Vele Colliery | https://www.gem.wiki/Vele_coal_mine | Proposed | Construction | New | MC Mining | MC Mining | Capacity | 1.2 | Recoverable | 325 | Surface | Open Pit | 86 | 59 | Estimate | Bituminous | Thermal & Met | 3.5 | 6.3 | 2.9 | Limpopo | Musina | Vhembe | Limpopo | TBD | ||||||||
28 | Welstand Coal Mine | TNC | https://www.gem.wiki/Welstand_coal_project | Proposed | Pre-Permit | New | Mbuyelo Coal | IchorCoal | Capacity | 3 | Resource | 89 | Underground & Surface | Mixed | 50 | Estimate | Subbituminous | Thermal | 0.8 | 3.6 | 5.4 | Highveld | Kriel | Emalahleni | Nkangala | Mpumalanga | TBD | |||||||
29 | Weltevreden Project | Klipspruit Life Extension Project | https://www.gem.wiki/Weltevreden_coal_project | Proposed | Construction | Expansion | South Africa Energy Coal | South32 | Capacity | 8.0 | Underground & Surface | Mixed | 59 | Estimate | Bituminous | Thermal | 3.5 | 44.8 | 19.2 | 740 | Witbank | Phola | Emalahleni | Nkangala | Mpumalanga | TBD | 20 | |||||||
30 | Witfontein Coal Mine | https://www.gem.wiki/Witfontein_Coal_Project | Proposed | Pre-Permit | New | Littlesnipe Ltd | Canyon Coal | Capacity | 1.8 | Resource | 19 | Underground & Surface | Mixed | 50 | Estimate | Subbituminous | Thermal | 0.8 | 2.2 | 3.2 | 500 | Highveld | Bethal | Govan Mbeki | Gert Sibande | Mpumalanga | 2021 | 7 | ||||||
31 | Zimpande Coal Mine | Leeuw Braakfontein, Braakfontein | https://www.gem.wiki/Zimpande_coal_project | Proposed | Pre-Permit | New | Wescoal | Wescoal | Capacity | 1.6 | Underground & Surface | Mixed | 50 | Estimate | Subbituminous | Thermal | 0.8 | 1.9 | 2.9 | Klipriver | Newcastle | Amajuba | KwaZulu-Natal | TBD | ||||||||||
32 | ||||||||||||||||||||||||||||||||||
33 | ||||||||||||||||||||||||||||||||||
34 | ||||||||||||||||||||||||||||||||||
35 | ||||||||||||||||||||||||||||||||||
36 | ||||||||||||||||||||||||||||||||||
37 | ||||||||||||||||||||||||||||||||||
38 | ||||||||||||||||||||||||||||||||||
39 | ||||||||||||||||||||||||||||||||||
40 | ||||||||||||||||||||||||||||||||||
41 | ||||||||||||||||||||||||||||||||||
42 | ||||||||||||||||||||||||||||||||||
43 | ||||||||||||||||||||||||||||||||||
44 | ||||||||||||||||||||||||||||||||||
45 | ||||||||||||||||||||||||||||||||||
46 | ||||||||||||||||||||||||||||||||||
47 | ||||||||||||||||||||||||||||||||||
48 | ||||||||||||||||||||||||||||||||||
49 | ||||||||||||||||||||||||||||||||||
50 | ||||||||||||||||||||||||||||||||||
51 | ||||||||||||||||||||||||||||||||||
52 | ||||||||||||||||||||||||||||||||||
53 | ||||||||||||||||||||||||||||||||||
54 | ||||||||||||||||||||||||||||||||||
55 | ||||||||||||||||||||||||||||||||||
56 | ||||||||||||||||||||||||||||||||||
57 | ||||||||||||||||||||||||||||||||||
58 | ||||||||||||||||||||||||||||||||||
59 | ||||||||||||||||||||||||||||||||||
60 | ||||||||||||||||||||||||||||||||||
61 | ||||||||||||||||||||||||||||||||||
62 | ||||||||||||||||||||||||||||||||||
63 | ||||||||||||||||||||||||||||||||||
64 | ||||||||||||||||||||||||||||||||||
65 | ||||||||||||||||||||||||||||||||||
66 | ||||||||||||||||||||||||||||||||||
67 | ||||||||||||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||||||||||
100 |