Wall Pier Design Based on CBC 2001 / IBC 2003 / IBC 2006
6
7
INPUT DATA & DESIGN SUMMARY
8
9
CONCRETE STRENGTH
10
fc' =3ksi
11
REBAR YIELD STRESS
12
fy =60ksi
13
WALL PIER LENGTH
14
L =5ft
15
WALL PIER HEIGHT
16
H =12ft
17
WALL PIER THICKNESS
18
t =10in
19
VERTICAL EDGE BARS, As
20
2#9
21
TRANSVERSE REINFORCEMENT, Av
THE DESIGN IS ADEQUATE.
22
2#4@6
in, o.c. (at each face.)
23
FACTORED AXIAL LOAD
Pu =60kips
24
FACTORED SHEAR FORCE
Vu =60
kips, (in plane)
25
26
27
28
ANALYSIS
29
30
CHECK WALL PIER DEFINITION (CBC 2001 1902A / IBC 2003 1908.1.4 / IBC 2006 1908.1.8)
31
L / t =6.00
within [2.5 , 6]
&H / L =2.40>2
32
[Satisfactory]
33
34
CHECK SHEAR STRENGTH (SEC 1921.6.13.2, 1921.4.51, & 1921.3.4.2 / IBC 2003 1908.1.4 / IBC 2006 1908.1.11)
35
Ve = (Mpr, left, top + Mpr, right,bot) / H + Vu =
175.1kips
36
<
8f(fc')0.5bd =
216.7kips
[Satisfactory]
37
<
f[Vc + Avfyd/s ] =
197.8kips
[Satisfactory]
38
whered =58.19in
39
rleft =0.003>
rmin=MIN[3(fc')0.5/fy, 200/fy ]=
0.003
[Satisfactory]
40
rright =0.003>rmin =0.003
[Satisfactory]
41
Mpr, left, top = rleft bd2fy (1.25 - 0.919rleft fy/fc') =
691ft-kips
42
Mpr, right ,bot = rright bd2fy (1.25 - 0.919rright fy/fc') =
691ft-kips
43
f =0.85
(Sec 1909.3.2.3)
44
Av = 0.4in2
45
Vc = 2(fc')0.5bd =
0.0
kips, (Per Sec 1921.3.4.2, Vc = 0, if (Ve -Vu) ≥ 50% Ve AND Pu < Ag fc' / 20 )
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100