3 | Country | State / Province | City/Locale | Company/Institution | Reactor | Technology / Features | Power Rating | Fuel | en | Status for Description | Status for Color Coding | Targeted Demonstration Date | Latitude | Longitude | Source: | |||||||||||
4 | Canada | New Brunswick | Point Lepreau | ARC Nuclear Canada Inc. / New Brunswick Power | ARC-100 | Sodium-cooled Fast Reactor | 100 MWe | HALEU | CAD40M awarded from Province of New Brunswick & U.S. DOE Advanced Reactor Demonstration Program. ARC-20 Awardee ($27.5) | Planned | Planned | 2029 | 45.0686 | -66.4543 | ||||||||||||
5 | Canada | Alberta | TBD | ARC Nuclear Canada Inc. / Capital Power Corporation & Ontario Power Generation | ARC-100 | Sodium-cooled Fast Reactor | 100 MWe | HALEU | U.S. DOE Advanced Reactor Demonstration Program. ARC-20 Awardee ($27.5) | Planned | Planned | TBD | 53.6539 | -113.679334 | https://www.opg.com/releases/capital-power-and-opg-partner-to-advance-new-nuclear-in-alberta/ | |||||||||||
6 | Canada | New Brunswick | Port of Belledune | ARC Nuclear Canada Inc. / Cross River Infrastructure Partners | ARC-100 | Sodium-cooled Fast Reactor | 100 MWe | HALEU | U.S. DOE Advanced Reactor Demonstration Program. ARC-20 Awardee ($27.5) | Planned | Planned | TBD | 47.9033 | -65.84759403 | https://www.arc-cleantech.com/news/71/39/ARC-Announces-First-Industrial-Application-in-North-America | |||||||||||
7 | Canada | New Brunswick | Point Lepreau | Moltex / New Brunswick Power | SSR-W | Fast-spectrum Molten Salt Reactor | 300 MWe | Recycled nuclear fuel | Cost-share award from Canadian Nuclear Laboratories | Planned | Planned | Late 2020s | 45.16678 | -66.4597 | ||||||||||||
8 | Canada | Ontario | Chalk River | Global First Power (GFP)(joint venture between Ontario Power Generation and Ultra Safe Nuclear Corporation); Canadian Nuclear Laboratories (CNL) | MMR™ | High-temperature Gas-cooled Microreactor | 15 MWt | HALEU | Funding under the CNL Canadian Nuclear Research Initiative" (CNRI) cost-sharing program | Planned | Planned | 2027 | 46.01737 | -77.4524 | ||||||||||||
9 | Canada | Ontario | Darlington Nuclear Generating Station (Bowmanville) | Ontario Power Generation and GE Hitachi | BWRX-300 | Light-water SMR | 1200 MWe | LEU | Canada Infrastructure Bank (CIB) committed a CAD 970M investment (USD 713M) towards the project. | Licensing/Site Preparation (first phase of site preparation activities concluded in June 2024) | Under construction | 2029 | 43.91051 | -78.6801 | ||||||||||||
10 | Canada | Sasketchewan | Estevan | SaskPower and GE Hitachi | BWRX-300 | Light-water SMR | 300 MWe | LEU | None to date | Planned | Planned | 2034 | 49.14365 | -102.9871 | ||||||||||||
11 | Canada | Manitoba | Pinawa | Not announced | Micro-reactor | Not announced | 5-20 MWe | TBD | As part of Canada's SMR Action Plan, Local Government District (LGD) of Pinawa will become the Demonstration Remote Community powered by SMR Technology to show the many benefits that an SMR can bring to a remote, off-grid community and/or mining organization. | Planned | Planned | TBD | 50.15 | -95.8833 | ||||||||||||
12 | Canada | Sasketchewan | Saskatoon | Westinghouse and Saskatchewan Research Council (SRC) | eVinci Microreactor | Heat Pipe-cooled Microreactor | 1-5MW | HALEU | N/A | Planned | Planned | TBD | 52.3599 | -107.7990768 | https://info.westinghousenuclear.com/news/first-canadian-evinci-microreactor-targeted-for-saskatchewan | |||||||||||
13 | Canada | Alberta | TBD | X-Energy and TransAlta | Xe-100 | High-temperature Gas-cooled Reactor | Not Announced | HALEU | Funding through Emissions Reduction Alberta | Planned | Planned | TBD | 56.19685396 | -115.0838368 | https://x-energy.com/media/news-releases/x-energy-transalta-partner-to-study-deployment-of-advanced-small-modular-nuclear-reactors-in-alberta-through-emissions-reduction-alberta-award | |||||||||||
14 | China | Changjiang Li Autonomous County, Hainan | Changjiang Nuclear Power Plant (Haiwei Township) | CNNC; Nuclear Power Institute of China (NPIC); China Nuclear Power Engineering Group | ACP-100 | Light-water SMR | 100 MWe | LEU | Fully government funded | Under construction (as of 2021) | Under construction | 2026 | 19.46075 | 108.8999 | ||||||||||||
15 | China | Hengfeng County, Jiangxi Province | Shangrao City | CNNC; Nuclear Power Institute of China (NPIC); China Nuclear Power Engineering Group | ACP-100 | Light-water SMR | 100 MWe | LEU | Fully government funded | Planned | Planned | TBD | 28.45493 | 117.94514 | ||||||||||||
16 | China | Ningdu County, Jiangxi Province | Ganzhou City | CNNC; Nuclear Power Institute of China (NPIC); China Nuclear Power Engineering Group | ACP-100 | Light-water SMR | 100 MWe | LEU | Fully government funded | Planned | Planned | TBD | 25.83241 | 114.93208 | ||||||||||||
17 | China | Shidao Bay Nuclear Power Plant (Rongcheng, Weihai) | Shandong | China Huaneng Group / China Nuclear Engineering & Construction Group / Tsinghua University | HTR-PM | High-temperature Pebble-bed Reactor | 200 MWe | HALEU | Fully government funded | In operation | In operation | Operational | 37.16532187 | 122.4866531 | ||||||||||||
18 | China | Xiapu County, Fujian | Changbiao Island | China Huaneng Group / China Nuclear Engineering & Construction Group / Tsinghua University | HTR-PM | High-temperature Pebble-bed Reactor | 600 MWe | HALEU | Fully government funded | Planned | Planned | TBD | 26.80126 | 120.15456 | ||||||||||||
19 | China | Xiapu County, Fujian | Changbiao Island | CNNC | CFR600 | Fast Reactor | 642 MWe (x2) | HALEU | Fully government funded | Under construction (as of 2023) | Under construction | TBD | 26.80051 | 120.1555 | ||||||||||||
20 | Finland | TBD | Salmisaari caves (Helsinki’s inner city), Huuhanmäki caves (Kuopio), Kymijärvi (Lahti) or Teivaanmäki (Lahti) | Steady Power | LDR-50 | Light-water SMR | 10–50 MWe / unit | LEU | TBD | Construction of pilot to begin next year | Planned | 2027-2028 | 61.75399 | 27.05614 | ||||||||||||
21 | Finland | Kuopio | TBD | Steady Power; Kuopion Energia | LDR-50 | Light-water SMR | 10–50 MWe / unit (up to 5) | LEU | TBD | Construction to begin in 2028 | Planned | Early 2030s | 62.81918 | 28.16391 | ||||||||||||
22 | Finland | TBD | TBD | Steady Power; Helen | LDR-50 | Light-water SMR | 10–50 MWe / unit (up to 10) | LEU | TBD | Construction to begin in 2028 | Planned | Early 2030s | 63.82532 | 39.96663 | ||||||||||||
23 | France | TBD | Deployment at any of EDF's 18 licensed sites | EDF / Nuward | NUWARD SMR | Light-water SMR | 170 MWe (x2) | LEU | EUR 500 million from French government | Planned | Planned | 2030 | 46.22388 | 5.74936 | ||||||||||||
24 | France | Marne | Bazancourt | Jimmy Energy | The Jimmy Thermal Generator | High-temperature microreactor | 20 MWe | HALEU | EUR 32 million under the France 2030 plan | Planned | Planned | 2026 | 49.36594015 | 4.168914043 | ||||||||||||
25 | Ghana | Nsuban (Western Region); back-up site: Obotan (Central Region) | TBD | Nuclear Power Ghana/Regnum Technology Group | VOYGR™ | Light-water SMR | TBD | LEU | Combination of Government and private funding. Early funding provided by the FIRST program. | Planned | Planned | TBD | 7.932055696 | -1.057349248 | ||||||||||||
26 | Japan | Ibaraki Prefecture | Oarai | Japan Atomic Energy Agency (JAEA) | High Temperature Test Reactor (HTTR) | High-temperature Gas-cooled Reactor | 30 MWth | HALEU | Fully government funded | In operation | In operation | 1998 | 36.2634 | 140.54967 | ||||||||||||
27 | Poland | Otwork | Świerk | National Centre for Nuclear Research (NCBJ) | HTGR-POLA | High-temperature Gas-cooled Demonstration Reactor | 30 MWth | HALEU | Fully government funded | Planned | Planned | TBD | 52.11161 | 21.35901 | ||||||||||||
28 | Poland | Lesser Poland Voivodeship | Stawy Monowskie, Gmina Oświęcim | Orlen Synthos Green Energy (OSGE) / GE-Hitachi (GEH) | BWRX-300 | Light-water SMR | 300 MWe x 4 | LEU | TBD | Proposed | Proposed | Early 2030s | 50.01748 | 19.39079 | OSGE has received a positive decision-in-principle to build the SMRs at 6 locations | |||||||||||
29 | Poland | Silesian Voivodeship | Dąbrowa Górnicza | OSGE / GEH | BWRX-300 | Light-water SMR | 300 MWe x 4 | LEU | TBD | Proposed | Proposed | Early 2030s | 50.32782 | 19.22582 | OSGE has received a positive decision-in-principle to build the SMRs at 6 locations | |||||||||||
30 | Poland | Lesser Poland Voivodeship | Nowa Huta (Kraków) | OSGE / GEH | BWRX-300 | Light-water SMR | 300 MWe x 4 | LEU | TBD | Proposed | Proposed | Early 2030s | 50.06965043 | 20.00798813 | OSGE has received a positive decision-in-principle to build the SMRs at 6 locations | |||||||||||
31 | Poland | Masovian Voivodeship | Ostrołęka | OSGE / GEH | BWRX-300 | Light-water SMR | 300 MWe x 4 | LEU | TBD | Proposed | Proposed | Early 2030s | 53.08689519 | 21.55996768 | OSGE has received a positive decision-in-principle to build the SMRs at 6 locations | |||||||||||
32 | Poland | Subcarpathian Voivodeship | Tarnobrzeg Special Economic Zone | OSGE / GEH | BWRX-300 | Light-water SMR | 300 MWe x 4 | LEU | TBD | Proposed | Proposed | Early 2030s | 50.5242501 | 21.62543429 | OSGE has received a positive decision-in-principle to build the SMRs at 6 locations | |||||||||||
33 | Poland | Kuyavian-Pomeranian Voivodeship | Włocławek | OSGE / GEH | BWRX-300 | Light-water SMR | 300 MWe x 4 | LEU | TBD | Proposed | Proposed | Early 2030s | 52.64852809 | 19.06775671 | OSGE has received a positive decision-in-principle to build the SMRs at 6 locations | |||||||||||
34 | Poland | Świętokrzyskie Voivodeship | Daleszyce or Chmielnik | Industria / Rolls-Royce | Rolls-Royce SMR | Light-water SMR | 440 MWe units | LEU | TBD | Proposed | Proposed | 2035 | 50.70476748 | 20.78174669 | https://world-nuclear-news.org/Articles/Industria-and-Rolls-Royce-SMR-plans-hit-ministeria | |||||||||||
35 | Poland | Silesian Voivodeship | Katowice | Last Energy and Katowice Special Economic Zone | Last Energy PWR-20 | Light-water SMR | 20 MWe x 10 | LEU | TBD | Proposed | Proposed | TBD | 50.26119315 | 19.02307394 | https://www.lastenergy.com/case-studies/ksse | |||||||||||
36 | Poland | Lower Silesian Voivodeship | Legnica | Last Energy and Legnicka Specjalna Strefa Ekonomiczna (LSSE) | Last Energy PWR-20 | Light-water SMR | 20 MWe x 10 | LEU | TBD | Proposed | Proposed | TBD | 51.2075917 | 16.16494902 | https://www.lastenergy.com/case-studies/lsse | |||||||||||
37 | Romania | Dâmbovița County | Doicesti | RoPower | VOYAGR | Light-water SMR | 77 MWe (x6) | LEU | $99M from the EXIM Engineering Multiplier Program | Planned. Preliminary investment decision to be made in 2025 | Planned | TBD | 44.99556402 | 25.40088436 | ||||||||||||
38 | Romania | Argeș County | Mioveni | Last Energy and Regia Autonomă Tehnologii pentru Energia Nucleară (RATEN) | PWR-20 | Light-water SMR | 20 MWe | LEU | None to date | Planned | Planned | TBD | 44.95672784 | 24.94230837 | ||||||||||||
39 | Rwanda | Bugesera | Nyamata | Rwanda Atomic Energy Board (RAEB), Dual Fluid Energy | Dual Fluid Reactor | Liquid-fueled Heterogeneous Fast-spectrum Reactor | 1 MWe (test reactor) | HALEU | None | Planned | Planned | 2026 (test reactor) | -2.207190772 | 30.14459602 | ||||||||||||
40 | Russia | Chukotka | Pevek | Rosatom | KLT-40 | Floating Light-water SMR | 32 MWe (x2) | LEU | Fully government funded | In operation | In operation | 2019 | 69.70331 | 170.28 | ||||||||||||
41 | Russia | Yakutia | Ust-Kuyga | Rosatom | RITM-200 | Light-water SMR | 50 MWe | LEU | Fully government funded | Planned | Planned | 2027 | 69.99675 | 135.5714 | ||||||||||||
42 | Russia | Sverdlovsk Oblast | Zarechny | Rosatom | BN-600 | Fast Reactor | 560 MWe | HALEU | Fully government funded | In operation | In operation | 2014 | 56.80624 | 61.32705 | ||||||||||||
43 | Russia | Sverdlovsk Oblast | Zarechny | Rosatom | BN-800 | Fast Reactor | 864 MWe | HALEU | Fully government funded | In operation | In operation | 2014 | 56.80624 | 61.32705 | ||||||||||||
44 | Russia | Chukotka Autonomous Okrug | Baimsky mining and processing plant (GOK) | Rosatom; GDK Baimskaya LLC | RITM-200S | Light-water SMR | 100 Mwe (x4) | LEU | Fully government funded | Planned | Planned | 2027-2028 | 67.30314383 | 163.6587942 | ||||||||||||
45 | Russia | Tomsk | Seversk | Rosatom | BREST-OD-300 | Lead-cooled Fast Reactor | 300 MWe | HALEU | Fully government funded | Under construction | Under construction | 2026 | 56.59729 | 84.82264 | ||||||||||||
46 | Russia | Ulyanovsk | Dimitrovgrad | Rosatom | MBIR | Fast-neutron Test Reactor | 150 MWt | HALEU | Fully government funded | Under construction | Under construction | ~2025 | 54.0198 | 49.6212 | ||||||||||||
47 | Russia | Ulyanovsk | Dimitrovgrad | AKME-engineering (50/50 Rosatom / Irkutskenergo) | SVBR-100 | Lead-bismuth Fast Reactor | 100 MWe | HALEU | Partially government funded through Rosatom participation | Site license granted | Licensing | TBD | 54.21973044 | 49.62311959 | ||||||||||||
48 | Saudi Arabia | TBD | TBD | KEPCO / KHNP / K.A.CARE | SMART | Light-water SMR | 330 MWt | LEU | Funded by the government of the Republic of Korea and Saudi Arabia | Planned | Planned | TBD | 24.70705881 | 46.67871535 | ||||||||||||
49 | Sweden | Kalmar | Oskarshamn | Uniper Sweden, Blykalla and Royal Institute of Technology (KTH) | SEALER-55 | Lead-cooled Fast Reactor | 55 MWe | HALEU | SEK 99 million (USD 9.8 million) from the Swedish Energy Agency | Planned | Planned | 2029 | 57.26519795 | 16.44701979 | ||||||||||||
50 | Sweden | Östergötland | Valdemarsvik | Kärnfull Next | BWRX-300 | Light-water SMR | 300 MWe (4-6 units) | LEU | Private funding | Planned | Planned | TBD | 58.2025189 | 16.60110179 | ||||||||||||
51 | Sweden | Södermanland | Nyköping | Kärnfull Next | BWRX-300 | Light-water SMR | 300 MWe (number of units TBD) | LEU | Private funding | Planned | Planned | TBD | 58.75328239 | 17.00900362 | ||||||||||||
52 | Ukraine | River Oblast | Varash, Rivne Nuclear Power Plant | Energoatom / Holtec | SMR-160 | Light-water SMR | 160 MWe (6 units) | LEU | TBD | Planned | Planned | TBD | 51.32948353 | 25.89396606 | ||||||||||||
53 | United Kingdom | West Cumbria | Adjacent to Sellafield | Rolls Royce SMR and Solway Community Power Company | Rolls-Royce SMR | Light-water SMR | 440 MWe units | LEU | £18 million (2019) + £215 million (2020) match from UK Research & Innovation (UKRI) | Planned | Planned | Planned | 54.42556903 | -3.49673653 | https://www.rolls-royce-smr.com/press/rolls-royce-smr-prioritises-four-nda-sites-for-15-gw-of-new-nuclear-power | |||||||||||
54 | United Kingdom | West Cumbria | Sellafield | Rolls Royce SMR and Nuclear Decommissioning Authority | Rolls-Royce SMR | Light-water SMR | 440 MWe units | LEU | TBD | Planned | Planned | Planned | 54.41943169 | -3.498665073 | https://www.rolls-royce-smr.com/press/rolls-royce-smr-prioritises-four-nda-sites-for-15-gw-of-new-nuclear-power | |||||||||||
55 | United Kingdom | Gwynedd (Wales) | Trawsfynydd | Rolls Royce SMR | Rolls-Royce SMR | Light-water SMR | 440 MWe units | LEU | TBD | Planned | Planned | Planned | 52.90103354 | -3.920999698 | https://www.rolls-royce-smr.com/press/rolls-royce-smr-prioritises-four-nda-sites-for-15-gw-of-new-nuclear-power | |||||||||||
56 | United Kingdom | Anglesey (Wales) | Wylfa | Rolls Royce SMR | Rolls Royce SMR | Light-water SMR | 440 MWe units | LEU | TBD | Planned | Planned | Planned | 53.41609829 | -4.483064164 | https://www.rolls-royce-smr.com/press/rolls-royce-smr-prioritises-four-nda-sites-for-15-gw-of-new-nuclear-power | |||||||||||
57 | United Kingdom | South Gloucestershire (England) | Oldbury-on-Severn | Rolls Royce SMR | Rolls Royce SMR | Light-water SMR | 440 MWe units | LEU | TBD | Planned | Planned | Planned | 51.64687019 | -2.569397768 | https://www.rolls-royce-smr.com/press/rolls-royce-smr-prioritises-four-nda-sites-for-15-gw-of-new-nuclear-power | |||||||||||
58 | United Kingdom | North Teesside (England) | Stockton-on-Tees | Westinghouse; Community Nuclear Power, Ltd. | Westinghouse AP300™ SMR | Light-water SMR | 300 MWe x 4 | LEU | TBD | Planned | Planned | Early 2030s | 54.61097624 | -1.169031063 | https://info.westinghousenuclear.com/news/westinghouse-and-uks-community-nuclear-power-collaborate-to-deploy-fleet-of-ap300-small-modular-reactors | |||||||||||
59 | United States | Alaska | Eielson Air Force Base | Department of Air Force (DAF), Oklo | Aurora Microreactor | Sodium-cooled Compact Fast Reactor | Microreactor | HALEU | DAF will execute a land lease and the 30-year fixed price PPA with Oklo once Oklo obtains a combined operating license from the NRC. | Planned | Planned | 2027 | 64.66359033 | -147.0989562 | ||||||||||||
60 | United States | Ohio | Piketon | Oklo and Southern Ohio Diversification Initiative (SODI) | Aurora Microreactor | Sodium-cooled Compact Fast Reactor | 30 MWe | HALEU | No | Planned | Planned | TBD | 39.01472268 | -83.01532149 | ||||||||||||
61 | United States | Ohio | TBD | Standard Power; ENTRA1; NuScale | VOYGR™ | Light-water SMR | 77 MWe (x8) | LEU | TBD | Planned | Planned | TBD | 40.34011505 | -82.71169405 | ||||||||||||
62 | United States | Idaho | Idaho National Lab | Oklo | Aurora Microreactor | Sodium-cooled Compact Fast Reactor | 1.5 MWe | HALEU | DOE Site Use Permit and HALEU supplied by DOE | Licensing (First advanced reactor licensing application in the U.S. to the NRC) | Licensing | 2027 | 43.5195 | -112.0459 | ||||||||||||
63 | United States | Idaho | Idaho National Labs | DoD, BWXT, DOE | Transportable Microreactor | High-temperature Gas-cooled Transportable Microreactor | Microreactor | HALEU | DoD contract for $300M; $42.5 million from DoD for reactor design and fuel development; $37M from INL to manufacture core. | In manufacturing process at BWXT facility in Lynchburg, VA; the complex holding the microreactor broke ground in September 2024 | Under manufacturing | 2025 | 43.54241 | -111.878 | https://www.energy.gov/ne/articles/department-defense-breaks-ground-project-pele-microreactor | |||||||||||
64 | United States | Idaho | Idaho National Labs | Radiant Industries; National Reactor Innovation Center (NRIC) | Kaleidos | High-temperature Gas-cooled Microreactor | 1.9 MWt | HALEU | GAIN vouchers; USD 1.5 million from NRIC FEED process | Planned | Planned | 2026 | 43.53264851 | -112.9436294 | ||||||||||||
65 | United States | Illinois | University of Illinois-Urbana Champaign | University of Illinois-Urbana Champaign/Ultra Safe Nuclear Corporation | Micro-Modular Reactor (MMR) | High-Temperature Gas Cooled Reactor with Heat Storage Unit (TRISO Fuel) | 15-30MW | HALEU | N/A | Planned | Planned | TBD | 40.10789 | -88.2443 | ||||||||||||
66 | United States | Michigan | Palisades Nuclear Power Plant | Holtec | SMR-300 | Light-water SMR | 300 MWe | LEU | ARDP Risk Reduction Award ($147.5 million (DOE share = $116 million)) | Planned | Planned | TBD | 42.32319763 | -86.3136372 | ||||||||||||
67 | United States | Not Announced | Not Announced | Westinghouse | eVinci Microreactor | Heat Pipe-cooled Microreactor | 1-5MW | HALEU | ARDP Risk Reduction Award ($9.3 million (DOE share = $7.4 million)) | Planned | Planned | 2024 | 40.68360654 | -77.848694 | ||||||||||||
68 | United States | Pennsylvania | State College | Westinghouse and Penn State University | eVinci Microreactor | Heat Pipe-cooled Microreactor | 1-5MW | HALEU | N/A | Planned | Planned | TBD | 40.8039 | -77.848694 | https://www.icds.psu.edu/westinghouse-and-penn-state-to-explore-advancing-sustainable-micro-reactors/ | |||||||||||
69 | United States | Not Announced | Not Announced | DoD, with contract awarded to X-energy, LLC | X-energy Mobile Micoreactor Prototype | Mobile Microreactor | 3-5 MWe | HALEU | DOD funding awarded to complete design work | Planned | Planned | TBD | 39.05972614 | -77.12039005 | ||||||||||||
70 | United States | North Carolina | Belews Creek Steam Station (Stokes County, NC) | Duke Energy | TBD | Light-water SMR | ~300 MWe | LEU | TBD | Planned | Planned | TBD | 36.29212287 | -80.06412707 | ||||||||||||
71 | United States | Pennsylvania | TBD | Standard Power; ENTRA1; NuScale | VOYGR™ | Light-water SMR | 77 MWe (x8) | LEU | TBD | Planned | Planned | TBD | 40.82963544 | -77.76244658 | ||||||||||||
72 | United States | Tennessee | Oak Ridge | Kairos Power | Hermes Reduced Scale Test Reactor | Fluoride Salt-cooled High-temperature Reactor (TRISO fuel) | 140 MWe | HALEU | ARDP Risk Reduction Award ($629 million over seven years (DOE share = $303 million)) | Under construction (construction permit awarded in December 2023) | Under construction | 2027 | 36.01938 | -84.2432 | ||||||||||||
73 | United States | Tennessee | Oak Ridge | Kairos Power | Hermes 2 | Fluoride Salt-cooled High-temperature Reactor (FHR) | 140 MWe | HALEU | N/A | Planned | Planned | TBD | 36.01938 | -84.2432 | https://www.ans.org/news/article-5214/kairos-applies-for-permit-to-build-twounit-hermes-plant/ | |||||||||||
74 | United States | Tennessee | Clinch River | GE-Hitachi | BWRX-300 | Light-water SMR | 300MWe | LEU | N/A | Planned (Early Site Permit approved Dec 2019) | Planned | TBD | 35.64062 | -86.691 | ||||||||||||
75 | United States | Texas | Abilene | Natura Energy; NEXT Research Alliance (NEXTRA) (led by Abilene Christian University; includes Texas A&M University, The University of Texas at Austin (UT Austin) and the Georgia Institute of Technology (Georgia Tech)) | Molten salt research reactor (MSRR) | Low-power Molten Salt Research Reactor | Up to 1 MWth | HALEU | No | Licensing (CP filed in 2022) | Licensing | 2025 | 32.47009207 | -99.70801031 | ||||||||||||
76 | United States | Texas | Midland | Oklo and Diamondback Energy | Aurora Microreactor | Sodium-cooled Compact Fast Reactor | 50 MWe | HALEU | No | Planned | Planned | TBD | 31.99878332 | -102.0806586 | Plot located in Diamondback Energy's HQ in Midland, TX | |||||||||||
77 | United States | Texas | Seadrift | X-Energy and Dow Chemical | Xe-100 | High-temperature Gas-cooled Reactor | 320 MWe | HALEU | $160 million USD in Bipartisan Infrastructure Law funding via DOE Office of Nuclear Energy | Planned | Planned | 2030 | 28.50713654 | -96.7798513 | ||||||||||||
78 | United States | Washington | Energy Northwest Richland Campus (Preferred Site) | X-Energy and Energy Northwest | Xe-100 | High-temperature Gas-cooled Reactor | 100 MWe (x12) | HALEU | TBD | Planned | Planned | 2027 | 46.22284559 | -119.6975387 | ||||||||||||
79 | United States | Maryland | TBD | X-Energy and Maryland Energy Administration | Xe-100 | High-temperature Gas-cooled Reactor | Not Announced | HALEU | No | Planned | Planned | TBD | 39.31227136 | -76.79516763 | ||||||||||||
80 | United States | Washington (IET Only) | Everett (IET Only) | Southern Company Services; Terra Power; Core Power | MCFR | Molten Chloride Fast Reactor | Not Announced | HALEU | ARDP Risk Reduction Award ($113 million (DOE share = $90.4 million)) | Planned | Planned | TBD | 47.98866 | -122.2 | ||||||||||||
81 | United States | Wyoming | Green River | Tata Chemicals Soda Ash Partners (TCSAP) and BWXT | BWXT Advanced Nuclear Reactor (BANR) | Transportable Microreactor | Microreactor | HALEU | ARDP Risk Reduction Award ($106.6 million (DOE share is $85.3 million)). Paid contract from Wyoming Energy Authority (WEA) to evaluate deployment in the State. | Planned | Planned | TBD | 41.52682283 | -109.4669908 | ||||||||||||
82 | United States | Wyoming | Kemmerer | Terrapower/GE Hitachi/Bechtel | Natrium | Sodium-cooled Fast Reactor with Molten Salt Energy Storage System (can boost the output to 500 MWe for more than 5.5. hours) | 345 MWe | HALEU | ARDP Demonstration Award ($160M) | Licensing/Site Preparation (CP application submitted in March 2023) | Under construction | 2030 | 41.70587657 | -110.5605859 | ||||||||||||
83 | Uzbekistan | Jizzakh | TBD | UzAtom | RITM-200 | Light-water SMR | 330 MWe | LEU | Government Funding | Planned | Planned | 2029 | 40.12349557 | 67.87338147 | ||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 | ||||||||||||||||||||||||||