1 | STATE OF CALIFORNIA | STATE ALLOCATION BOARD | ||||||||||||||||
2 | FACILITY INSPECTION TOOL(FIT) | OFFICE OF PUBLIC SCHOOL CONSTRUCTION | ||||||||||||||||
3 | SCHOOL FACILITY CONDITIONS EVALUATION | |||||||||||||||||
4 | (REV 04/22) | Page 7 of 7 | ||||||||||||||||
5 | ||||||||||||||||||
6 | SCHOOL DISTRICT/COUNTY OFFICE OF EDUCATION | COUNTY | ||||||||||||||||
7 | Bennett Valley Union School District | Sonoma | ||||||||||||||||
8 | SCHOOL SITE | SCHOOL TYPE (GRADE LEVELS) | NUMBER OF CLASSROOMS ON SITE: | 34 | ||||||||||||||
9 | Yulpa School | 4th - 6th | NUMBER OF RESTROOMS ON SITE: | 16 | ||||||||||||||
10 | INSPECTOR'S NAME | INSPECTOR'S TITLE | NAME OF DISTRICT REPRESENTATIVE ACCOMPANYING THE INSPECTOR(S) (IF APPLICABLE) | |||||||||||||||
11 | Jimmie Hughes | Director of Maintenance and Operations | Alexis Cala , Amy Hale, Josh Wilson | |||||||||||||||
12 | TOTAL ESTIMATED BUILDING VOLUME (CUBIC FEET): | 552,000 | TIME OF INSPECTION | 11:30 pm 1/18/24 | SITE ENROLLMENT | 565 | ||||||||||||
13 | TOTAL ESTIMATED SITE SQUARE FOOTAGE/ ACREAGE: | 295,685 | WEATHER CONDITION AT TIME OF INSPECTION | |||||||||||||||
14 | TOTAL ESTIMATED BUILDING SQUARE FOOTAGE: | 42,500 | slightly cloudy | |||||||||||||||
15 | PART III: CATEGORY TOTALS AND RANKING (round all calculations to two decimal places) | |||||||||||||||||
16 | TOTAL NUMBER OF AREAS EVALUATED | CATEGORY TOTALS | A. SYSTEMS | B. INTERIOR | C. CLEANLINESS | D. ELECTRICAL | E. RESTROOMS/FOUNTAINS | F. SAFETY | G. STRUCTURAL | H. EXTERNAL | ||||||||
17 | GAS LEAKS | MECH/HVAC | SEWER | INTERIOR SURFACES | OVERALL CLEANLINESS | PEST/VERMIN INFESTATION | ELECTRICAL | RESTROOMS | SINKS/ FOUNTAINS | FIRE SAFETY | HAZARDOUS MATERIALS | STRUCTURAL DAMAGE | ROOFS | PLAYGROUND/ SCHOOL GROUNDS | WINDOWS/DOORS/ GATES/FENCES | |||
18 | Number of "OK"s: | 11 | 10 | 11 | 10 | 11 | 11 | 10 | 10 | 11 | 11 | 11 | 11 | 9 | 3 | 11 | ||
19 | Number of "D"s: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 0 | 0 | ||
20 | 11 | Number of "X"s: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
21 | Number of N/As: | 0 | 1 | 0 | 1 | 0 | 0 | 1 | 1 | 0 | 0 | 0 | 0 | 1 | 8 | 0 | ||
22 | Percent of System in Good Repair Number of "OK"s divided by (Total Areas - "NA"s)* | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 90.00% | 100.00% | 100.00% | ||
23 | Total Percent per Category (average of above)* | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 95.00% | 100.00% | |||||||||
24 | Rank (Circle one) GOOD = 90%-100% FAIR = 75%-89.99% POOR = 0%-74.99% | GOOD | GOOD | GOOD | GOOD | GOOD | GOOD | GOOD | GOOD | |||||||||
25 | *Note: An extreme deficiency in any area automatically results in a "poor" ranking for that category and a zero for "Total Percent per Category". | |||||||||||||||||
26 | OVERALL RATING: | DETERMINE AVERAGE PERCENTAGE OF 8 CATEGORIES ABOVE ➜ | 100.00% | SCHOOL RATING** ➜ | EXEMPLARY | |||||||||||||
27 | **For School Rating, apply the Percentage Range below to the average percentage determined above, taking into account the rating Description below. | |||||||||||||||||
28 | PERCENTAGE | DESCRIPTION | RATING | |||||||||||||||
29 | 99%-100% | The school meets most or all standards of good repair. Deficiencies noted, if any, are not significant and/or impact a very small area of the school. | EXEMPLARY | |||||||||||||||
30 | 90%-98.99% | The school is maintained in good repair with a number of non-critical deficiencies noted. These deficiencies are isolated, and/or resulting from minor wear and tear, and/or in the process of being mitigated. | GOOD | |||||||||||||||
31 | 75.%-89.99% | The school is not in good repair. Some deficiencies noted are critical and/or widespread. Repairs and/or additional maintenance are necessary in several areas of the school site. | FAIR | |||||||||||||||
32 | 0%-74.99% | The school facilities are in poor condition. Deficiencies of various degrees have been noted throughout the site. Major repairs and maintenance are necessary throughout the campus. | POOR | |||||||||||||||
33 | ||||||||||||||||||
34 | INSPECTOR'S COMMENTS AND RATING EXPLANATION: | nothing additional report | ||||||||||||||||
35 | ||||||||||||||||||
36 | ||||||||||||||||||
37 | ||||||||||||||||||
38 | DISTRICT'S RESPONSES TO REPORT (Attach additional pages if necessary): | nothing additional report | ||||||||||||||||
39 | ||||||||||||||||||
40 | ||||||||||||||||||
41 | ||||||||||||||||||
42 | ||||||||||||||||||
43 | ||||||||||||||||||
44 | ||||||||||||||||||
45 | ||||||||||||||||||
46 | ||||||||||||||||||
47 | ||||||||||||||||||
48 | ||||||||||||||||||
49 | ||||||||||||||||||
50 | ||||||||||||||||||
51 | ||||||||||||||||||
52 | ||||||||||||||||||
53 | ||||||||||||||||||
54 | ||||||||||||||||||
55 | ||||||||||||||||||
56 | ||||||||||||||||||
57 | ||||||||||||||||||
58 | ||||||||||||||||||
59 | ||||||||||||||||||
60 | ||||||||||||||||||
61 | ||||||||||||||||||
62 | ||||||||||||||||||
63 | ||||||||||||||||||
64 | ||||||||||||||||||
65 | ||||||||||||||||||
66 | ||||||||||||||||||
67 | ||||||||||||||||||
68 | ||||||||||||||||||
69 | ||||||||||||||||||
70 | ||||||||||||||||||
71 | ||||||||||||||||||
72 | ||||||||||||||||||
73 | ||||||||||||||||||
74 | ||||||||||||||||||
75 | ||||||||||||||||||
76 | ||||||||||||||||||
77 | ||||||||||||||||||
78 | ||||||||||||||||||
79 | ||||||||||||||||||
80 | ||||||||||||||||||
81 | ||||||||||||||||||
82 | ||||||||||||||||||
83 | ||||||||||||||||||
84 | ||||||||||||||||||
85 | ||||||||||||||||||
86 | ||||||||||||||||||
87 | ||||||||||||||||||
88 | ||||||||||||||||||
89 | ||||||||||||||||||
90 | ||||||||||||||||||
91 | ||||||||||||||||||
92 | ||||||||||||||||||
93 | ||||||||||||||||||
94 | ||||||||||||||||||
95 | ||||||||||||||||||
96 | ||||||||||||||||||
97 | ||||||||||||||||||
98 | ||||||||||||||||||
99 | ||||||||||||||||||
100 |