Base KVA Details:
4
Base KVA for H.T. Breaker and Transformer Primary6MVAJignesh.Parmar, jiguparmar@yahoo.com
5
Base KV for H.T. Breaker and Transformer Primary6٫6KVwww.electricalnotes.wordpress.com,
6
Base KVA for Transformer Secondary and down stream2٫5MVA
7
Base KVA for Transformer Secondary and down stream0٫415KV
8
9
HT Incoming Power Supply Details
10
HT Power received at 6٫6KV
11
Fault Level at HT Incoming Power Supply360MVA
12
13
Transformer Details:
14
Transformer Rating2٫5MVA
15
Transformer Impedence 6٫00%6
16
% Reactance at Base KVA6٫00%
17
18
Fault Level at HT Side (Sub-station):
19
FromToCable DetailsZ PU ReactanceTotal Impedance up to this Location (Ω)Fault Level
20
Cable SizeNo of RunLength (Meter)Resistance (Ω/Km)Reactance (Ω/Km)Total Cable Resistance (R5)Total Cable Reactance (X5)Z Impedance (Ω)Fault Level @ LocationsFault MVAFault Current (KA)
21
HT incomingHT Circuit Breaker5500٫102300٫099000٫001020٫000990٫001420٫016670٫0181HT Circuit Breaker33250
22
HT Circuit BreakerPrimary Side of Transformer34000٫102300٫099000٫013640٫013200٫018980٫002610٫02070Primary Side of Transformer29044
23
Primary Side of Transformer0٫0207029044
24
0٫0207029044
25
0٫0207029044
26
Secondary Side of Transfomer0٫060000٫0807Secondary Side of Transfomer3143
27
28
Fault Level at LV Side (Substation to Down Stream):
29
Secondary Side of TransfomerMain LT Panel13120٫102300٫061800٫000090٫000060٫000110٫001600٫0823Main LT Panel3042
30
Main LT PanelFeeder Piller21600٫102300٫061800٫008180٫004940٫009560٫138790٫2211Feeder Piller1116
31
Feeder PillerSub Panel61500٫1230٫07390٫003080٫001850٫003590٫052070٫2732Sub Panel913
32
Sub PanelMotor Control Panel61500٫1230٫07390٫003080٫001850٫003590٫052070٫3252Motor Control Panel811
33
Motor Control Panel
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100