DateShiftTeamStatus
4
2/23/2026
5
MOPAccess...
6
MOPAll caverns patrolled and closed @ 14:00.
7
AOPAll vacuum valves (except pt2 open), circuits on. BIS & LBDS armed.
8
AOPCycle to 50/15 with BIS and LBDS armed. "Quench" of ITR2 to be investigated by QPS/EE teams
9
NOP
10
NOP
11
Tue 24/2/26
12
MOPAccess for VSC to point 2, Intervention by QPS in ITR2.
13
MOPMachine to 6.8 TeV to check ITR2.
14
AOPLBDS and BIS MP tests, TL tests - LHC MTG crashes on injection requests
15
AOPTL test, FMCM tests, RF frequency ramp LBDS armed
16
NOP
17
NOP
18
Wed 25/2/26
19
MOPAccess for removal of VSC equipment from point 2, BRAN, DOROS, ZDC checks
20
MOPAccess for removal of VSC equipment from point 2, BRAN, DOROS, ZDC checks
21
AOPRecovery
22
AOPPrecycle & cycle (circuits & RF)
23
NOP
24
NOP
25
Thu 26/2/26
26
MOPFirst injections and circulating beam, Q & Q', orbit, trajectory corrections
27
MOPMeyrin injectors down (technet issue), RF bucket setup, ADT excitation, AC-dipole
28
AOMCBCMOptics checks at injection, BI, RF and ADT setup, VELO valves closed (SMOG)
29
AOP/OMCBCMOptics checks at injection and FT (1.2m)
30
NOPLUMISteering TI2/8 with nominals, E-matching, ramp and collide with nominals (stop at 1.2m)
31
NOPLUMIProbes to 50/15 cm, LMs at 50/15 with coarse settings
32
Fri 27/2/26
33
MOP/COLL/BICollimation alignment at injection, IR6 BPM intensity threshold, SMOG in LHCb
34
MOMCBCMCollimation LMs, optics check @ FT
35
AOMCBCMOptics check at FT at 93 cm, 60cm, 30cm, 25 cm
36
AOMCBCMOptics check at FT at 18 cm, 15 cm - dumped on BLMs - OMC setup completed
37
NOPDecay measurements at injection (6.8 TeV / precycle)
38
NOPDecay measurements at injection (6.8 TeV / precycle)
39
Sat 28/2/26
40
MCOLL Collimator alignment at FT
41
MCOLL Collimator alignment at FT, aperture measurement at injection
42
AOP/BIBlindable BLM test
43
AOP/BI/RFBlindable BLM test, splashes ATLAS, RF V calibration
44
NRFRF cavity phasing (voltage cal not possible, scope issue)
45
NRFRF cavity phasing (voltage cal not possible, scope issue)
46
Sun 1/3/26
47
MABTTDIS & TCDQ alignment check @ injection
48
MOPCycle to 1.2 TeV (FT only) - issue with TCTPH.4L8.B1 (all switches actives)
49
AOPAccess to UA83 for TCTPH, 1.2 TeV cycle
50
AOPLUMIVDM cycle with nominals
51
NCOLL/ABPCollimator impedance - lost S78
52
NCOLL/ABPTZ82 fire alarm, ITL8 PC issue
53
Mon 2/3/261WEEK 10MC: H. Timko
54
MABTAccess for ITL8 PC, TCDI aligment check and inj prot validation
55
MABTTCDI aligment check and inj prot validation, CMS splashes
56
AADTADT setup (single nominals) - bumps, intensity range setup...
57
AADTADT setup (single nominals), nominal cycle cleaning
58
NOPBeta* levelling cleaning
59
NOPLUMIBeta* levelling cleaning / setup / nominal optimization in squeeze
60
Tue 3/3/262
61
MABTLUMITCDQ alignment at FT, beta* levelling setup (collisions, TCT+TCL alignment)
62
MOP/COLLLUMIBeta* levelling setup (collisions, TCT+TCL alignment), aperture at 15 cm
63
ACOLLLUMILM at injection, TDIS angular alignment re-check
64
ACOLLLUMIAperture at 18 cm
65
NOPOMC corrections for 1.2 TeV cycle - beam lost due to instability (Q')
66
NOPOMC corrections for 1.2 TeV cycle
67
Wed 4/3/263
68
MOPLM during ramp and FT - nominal lost during first ramp
69
MOPLM during ramp and FT
70
ARFRF voltage calibration / LM at injection
71
AABPImpedance studies
72
NABPImpedance studies
73
NABPCrystal alignment check
74
Thu 5/3/264
75
MOPAccess
76
MOPRecovery, IR6 BPM sensitivity + beam presence flag check, AGK adjustment
77
ACOLLLUMIAGK adjustment, Interlock BPM check (single b), XRP alignment
78
ACOLLLUMIXRP alignment
79
NCOLLLUMIXRP data taking (AFP mu = 0.5, 1h, CTPPS 6h)
80
NCOLLLUMIXRP data taking (AFP mu = 0.5, 1h, CTPPS 6h)
81
Fri 6/3/265
82
MRF/ADTLMs at injection, interlock BPM validation with 12b, train injection, ADT setup/check
83
MRF/ADTTrain injection, ADT setup/check, access for RCBH30.R7B2
84
AOPLUMIAccess for COD + ADT, MP validation 60/18
85
AOPLUMIMP validation 60/18
86
NOPLUMIMP validation
87
NOPLUMIMP validation, 1.2 TeV cycle
88
Sat 7/3/266
89
MOMCVdM optics
90
MOPVdM optics
91
AOPLUMIStable beams with 4b
92
AOPLUMIStable beams with 4b - dumped on beta* smp range for SB flag
Single_4b_2_2_2_noLRs
93
NOPLUMIStable beams with 12b
94
NOPLUMIStable beams with 12b
Single_12b_8_8_8_1bpi_12inj
95
Sun 8/3/267
96
MOPStable beams with 12b, 3 TeV cycle
verbal "checklist"
97
MOPStable beams with 75b - ALICE field off fill (1st fill, min 5 h)
25ns_75b_74_38_50_12bpi_9inj_3INDIVs
98
AOPStable beams with 75b
99
AOPStable beams with 75b
100
NOPStable beams with 75b