3 | Date | Shift | Team | Status | ||||||||||||||||||||
4 | 2/23/2026 | |||||||||||||||||||||||
5 | M | OP | Access... | |||||||||||||||||||||
6 | M | OP | All caverns patrolled and closed @ 14:00. | |||||||||||||||||||||
7 | A | OP | All vacuum valves (except pt2 open), circuits on. BIS & LBDS armed. | |||||||||||||||||||||
8 | A | OP | Cycle to 50/15 with BIS and LBDS armed. "Quench" of ITR2 to be investigated by QPS/EE teams | |||||||||||||||||||||
9 | N | OP | ||||||||||||||||||||||
10 | N | OP | ||||||||||||||||||||||
11 | Tue 24/2/26 | |||||||||||||||||||||||
12 | M | OP | Access for VSC to point 2, Intervention by QPS in ITR2. | |||||||||||||||||||||
13 | M | OP | Machine to 6.8 TeV to check ITR2. | |||||||||||||||||||||
14 | A | OP | LBDS and BIS MP tests, TL tests - LHC MTG crashes on injection requests | |||||||||||||||||||||
15 | A | OP | TL test, FMCM tests, RF frequency ramp LBDS armed | |||||||||||||||||||||
16 | N | OP | ||||||||||||||||||||||
17 | N | OP | ||||||||||||||||||||||
18 | Wed 25/2/26 | |||||||||||||||||||||||
19 | M | OP | Access for removal of VSC equipment from point 2, BRAN, DOROS, ZDC checks | |||||||||||||||||||||
20 | M | OP | Access for removal of VSC equipment from point 2, BRAN, DOROS, ZDC checks | |||||||||||||||||||||
21 | A | OP | Recovery | |||||||||||||||||||||
22 | A | OP | Precycle & cycle (circuits & RF) | |||||||||||||||||||||
23 | N | OP | ||||||||||||||||||||||
24 | N | OP | ||||||||||||||||||||||
25 | Thu 26/2/26 | |||||||||||||||||||||||
26 | M | OP | First injections and circulating beam, Q & Q', orbit, trajectory corrections | |||||||||||||||||||||
27 | M | OP | Meyrin injectors down (technet issue), RF bucket setup, ADT excitation, AC-dipole | |||||||||||||||||||||
28 | A | OMC | BCM | Optics checks at injection, BI, RF and ADT setup, VELO valves closed (SMOG) | ||||||||||||||||||||
29 | A | OP/OMC | BCM | Optics checks at injection and FT (1.2m) | ||||||||||||||||||||
30 | N | OP | LUMI | Steering TI2/8 with nominals, E-matching, ramp and collide with nominals (stop at 1.2m) | ||||||||||||||||||||
31 | N | OP | LUMI | Probes to 50/15 cm, LMs at 50/15 with coarse settings | ||||||||||||||||||||
32 | Fri 27/2/26 | |||||||||||||||||||||||
33 | M | OP/COLL/BI | Collimation alignment at injection, IR6 BPM intensity threshold, SMOG in LHCb | |||||||||||||||||||||
34 | M | OMC | BCM | Collimation LMs, optics check @ FT | ||||||||||||||||||||
35 | A | OMC | BCM | Optics check at FT at 93 cm, 60cm, 30cm, 25 cm | ||||||||||||||||||||
36 | A | OMC | BCM | Optics check at FT at 18 cm, 15 cm - dumped on BLMs - OMC setup completed | ||||||||||||||||||||
37 | N | OP | Decay measurements at injection (6.8 TeV / precycle) | |||||||||||||||||||||
38 | N | OP | Decay measurements at injection (6.8 TeV / precycle) | |||||||||||||||||||||
39 | Sat 28/2/26 | |||||||||||||||||||||||
40 | M | COLL | Collimator alignment at FT | |||||||||||||||||||||
41 | M | COLL | Collimator alignment at FT, aperture measurement at injection | |||||||||||||||||||||
42 | A | OP/BI | Blindable BLM test | |||||||||||||||||||||
43 | A | OP/BI/RF | Blindable BLM test, splashes ATLAS, RF V calibration | |||||||||||||||||||||
44 | N | RF | RF cavity phasing (voltage cal not possible, scope issue) | |||||||||||||||||||||
45 | N | RF | RF cavity phasing (voltage cal not possible, scope issue) | |||||||||||||||||||||
46 | Sun 1/3/26 | |||||||||||||||||||||||
47 | M | ABT | TDIS & TCDQ alignment check @ injection | |||||||||||||||||||||
48 | M | OP | Cycle to 1.2 TeV (FT only) - issue with TCTPH.4L8.B1 (all switches actives) | |||||||||||||||||||||
49 | A | OP | Access to UA83 for TCTPH, 1.2 TeV cycle | |||||||||||||||||||||
50 | A | OP | LUMI | VDM cycle with nominals | ||||||||||||||||||||
51 | N | COLL/ABP | Collimator impedance - lost S78 | |||||||||||||||||||||
52 | N | COLL/ABP | TZ82 fire alarm, ITL8 PC issue | |||||||||||||||||||||
53 | Mon 2/3/26 | 1 | WEEK | 10 | MC: H. Timko | |||||||||||||||||||
54 | M | ABT | Access for ITL8 PC, TCDI aligment check and inj prot validation | |||||||||||||||||||||
55 | M | ABT | TCDI aligment check and inj prot validation, CMS splashes | |||||||||||||||||||||
56 | A | ADT | ADT setup (single nominals) - bumps, intensity range setup... | |||||||||||||||||||||
57 | A | ADT | ADT setup (single nominals), nominal cycle cleaning | |||||||||||||||||||||
58 | N | OP | Beta* levelling cleaning | |||||||||||||||||||||
59 | N | OP | LUMI | Beta* levelling cleaning / setup / nominal optimization in squeeze | ||||||||||||||||||||
60 | Tue 3/3/26 | 2 | ||||||||||||||||||||||
61 | M | ABT | LUMI | TCDQ alignment at FT, beta* levelling setup (collisions, TCT+TCL alignment) | ||||||||||||||||||||
62 | M | OP/COLL | LUMI | Beta* levelling setup (collisions, TCT+TCL alignment), aperture at 15 cm | ||||||||||||||||||||
63 | A | COLL | LUMI | LM at injection, TDIS angular alignment re-check | ||||||||||||||||||||
64 | A | COLL | LUMI | Aperture at 18 cm | ||||||||||||||||||||
65 | N | OP | OMC corrections for 1.2 TeV cycle - beam lost due to instability (Q') | |||||||||||||||||||||
66 | N | OP | OMC corrections for 1.2 TeV cycle | |||||||||||||||||||||
67 | Wed 4/3/26 | 3 | ||||||||||||||||||||||
68 | M | OP | LM during ramp and FT - nominal lost during first ramp | |||||||||||||||||||||
69 | M | OP | LM during ramp and FT | |||||||||||||||||||||
70 | A | RF | RF voltage calibration / LM at injection | |||||||||||||||||||||
71 | A | ABP | Impedance studies | |||||||||||||||||||||
72 | N | ABP | Impedance studies | |||||||||||||||||||||
73 | N | ABP | Crystal alignment check | |||||||||||||||||||||
74 | Thu 5/3/26 | 4 | ||||||||||||||||||||||
75 | M | OP | Access | |||||||||||||||||||||
76 | M | OP | Recovery, IR6 BPM sensitivity + beam presence flag check, AGK adjustment | |||||||||||||||||||||
77 | A | COLL | LUMI | AGK adjustment, Interlock BPM check (single b), XRP alignment | ||||||||||||||||||||
78 | A | COLL | LUMI | XRP alignment | ||||||||||||||||||||
79 | N | COLL | LUMI | XRP data taking (AFP mu = 0.5, 1h, CTPPS 6h) | ||||||||||||||||||||
80 | N | COLL | LUMI | XRP data taking (AFP mu = 0.5, 1h, CTPPS 6h) | ||||||||||||||||||||
81 | Fri 6/3/26 | 5 | ||||||||||||||||||||||
82 | M | RF/ADT | LMs at injection, interlock BPM validation with 12b, train injection, ADT setup/check | |||||||||||||||||||||
83 | M | RF/ADT | Train injection, ADT setup/check, access for RCBH30.R7B2 | |||||||||||||||||||||
84 | A | OP | LUMI | Access for COD + ADT, MP validation 60/18 | ||||||||||||||||||||
85 | A | OP | LUMI | MP validation 60/18 | ||||||||||||||||||||
86 | N | OP | LUMI | MP validation | ||||||||||||||||||||
87 | N | OP | LUMI | MP validation, 1.2 TeV cycle | ||||||||||||||||||||
88 | Sat 7/3/26 | 6 | ||||||||||||||||||||||
89 | M | OMC | VdM optics | |||||||||||||||||||||
90 | M | OP | VdM optics | |||||||||||||||||||||
91 | A | OP | LUMI | Stable beams with 4b | ||||||||||||||||||||
92 | A | OP | LUMI | Stable beams with 4b - dumped on beta* smp range for SB flag | Single_4b_2_2_2_noLRs | |||||||||||||||||||
93 | N | OP | LUMI | Stable beams with 12b | ||||||||||||||||||||
94 | N | OP | LUMI | Stable beams with 12b | Single_12b_8_8_8_1bpi_12inj | |||||||||||||||||||
95 | Sun 8/3/26 | 7 | ||||||||||||||||||||||
96 | M | OP | Stable beams with 12b, 3 TeV cycle | verbal "checklist" | ||||||||||||||||||||
97 | M | OP | Stable beams with 75b - ALICE field off fill (1st fill, min 5 h) | 25ns_75b_74_38_50_12bpi_9inj_3INDIVs | ||||||||||||||||||||
98 | A | OP | Stable beams with 75b | |||||||||||||||||||||
99 | A | OP | Stable beams with 75b | |||||||||||||||||||||