Greene Acres Garden Vital Brooklyn Upgrade Workdays
 Share
The version of the browser you are using is no longer supported. Please upgrade to a supported browser.Dismiss

 
$
%
123
 
 
 
 
 
 
 
 
 
ABCDEFGHIJKLMNOPQRSTUVWXYZAA
1
WorkslotMember/Volunteer NamePhone Number
2
10am-1pm
3
1Juliana6462806146
4
2Susan
5
3Gwen 3054504261
6
4Tyler 7173149099
7
5
Aaron Smith (can be there the entire day)
646.464.4226
8
6Justine with pending + 1Justinebra0@gmail.com
9
7Carmen Mondesire718 - 638-9879
10
8
11
9
12
10
13
* Tasks
14
Layout of beds
15
Leveling groundAn alternative to having a perfectly level ground for install: create a template made of wood to construct the durable green beds on a level surface and then transfer to the hand leveled ground after construction. We can make two or three templates; depending on how many beds can be constructed simultaneously. (A.S.)
16
Prepping materials for each site for June 22 & June 23
17
Runthrough Install of Minimum of 1 New Plot
See video: https://durablegreenbed.com/assembly-instructions/
18
19
*Tools RequiredNumber NeededNotes
20
Tape Measure2Juliana can bring 1, nicole can bring 2, aaron has a wheel measuring device
21
String/Mason Line1Juliana will pick up
22
Stakes
23
Cordless Drills2Juliana can bring 1, Nikki can bring 1, Aaron can bring 2, Kim can bring 1
24
Hammer1gwen, we have hammers in the shed toolbox (A.S.)
25
Gorilla Wood Glue or weather resistant wood glueaaron can purchase from hardware store
26
Drive Socket Wrenchaaron can bring a set
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Loading...