1 | SCADA CYBERSECURITY AUDIT CHECKLIST | |||||||||||||||||||||||||
2 | Standards: IEC 62443 | NIST SP 800-82 Rev.3 | NERC CIP v7 | |||||||||||||||||||||||||
3 | Facility / Site: ___________________________ | Auditor: ___________________________ | Audit Date: ___________________________ | |||||||||||||||||||||||
4 | # | Control Area | Control Requirement | Standard Ref. | Requirement Level | Status | Evidence / Notes | Owner | Target Date | |||||||||||||||||
5 | 1. ASSET INVENTORY & IDENTIFICATION | |||||||||||||||||||||||||
6 | 1.1 | Asset Inventory | Maintain a complete, up-to-date inventory of all SCADA hardware (HMIs, RTUs, PLCs, historians, servers, network devices) and software versions. | IEC 62443 SR 2.8 / NIST 800-82 §5.2 / NERC CIP-002 | High | Select ▼ | ||||||||||||||||||||
7 | 1.2 | Asset Classification | Classify each asset by criticality (Safety, Critical, High, Low) and document the classification rationale. | IEC 62443 SL-T / NIST 800-82 §5.2 | High | Select ▼ | ||||||||||||||||||||
8 | 1.3 | Network Topology Map | Maintain a current network diagram showing all OT/ICS devices, zones, conduits, and communication paths. | IEC 62443 SR 1.13 / NERC CIP-005 | High | Select ▼ | ||||||||||||||||||||
9 | 1.4 | Software Baseline | Document authorized software, firmware versions, and patch levels for every OT asset. | IEC 62443 SR 2.2 / NIST 800-82 §6.2.1 | Medium | Select ▼ | ||||||||||||||||||||
10 | 1.5 | Removable Media Control | Maintain a register of all authorized removable media (USB, portable drives) used in the OT environment. | IEC 62443 SR 2.3 / NERC CIP-010 | Medium | Select ▼ | ||||||||||||||||||||
11 | 2. NETWORK ARCHITECTURE & SEGMENTATION | |||||||||||||||||||||||||
12 | 2.1 | Zone & Conduit Model | Define security zones and conduits per IEC 62443 with documented security-level targets (SL-T) for each zone. | IEC 62443 §4.2 / NIST 800-82 §6.1 | High | Select ▼ | ||||||||||||||||||||
13 | 2.2 | IT/OT Separation | Enforce logical and/or physical separation between corporate IT networks and OT/SCADA networks using firewalls or DMZs. | IEC 62443 SR 1.13 / NIST 800-82 §6.1 / NERC CIP-005 | High | Select ▼ | ||||||||||||||||||||
14 | 2.3 | Purdue Model Compliance | Segment the network into Levels 0–4 (Field, Control, Supervisory, Operations, Enterprise) with restricted cross-level communication. | IEC 62443 / NIST 800-82 Fig. 5-1 | High | Select ▼ | ||||||||||||||||||||
15 | 2.4 | Firewall Rule Review | Review and audit all firewall rules at least every 90 days; deny all traffic not explicitly permitted. | IEC 62443 SR 5.1 / NERC CIP-007 | High | Select ▼ | ||||||||||||||||||||
16 | 2.5 | Data Diodes / Unidirectional Gateways | Deploy unidirectional security gateways where data must only flow from OT to IT (historian, SCADA to business intelligence). | IEC 62443 SR 3.5 / NIST 800-82 §6.1 | Medium | Select ▼ | ||||||||||||||||||||
17 | 2.6 | Wireless Security | Disable all unauthorized wireless access; where wireless is required, enforce WPA3-Enterprise and segment to a dedicated VLAN. | IEC 62443 SR 1.13 / NIST 800-82 §6.7 | High | Select ▼ | ||||||||||||||||||||
18 | 2.7 | VLAN Segmentation | Separate control-layer devices (PLCs, RTUs) from supervisory-layer devices (SCADA servers, HMIs) using VLANs with ACLs. | IEC 62443 SR 5.2 / NERC CIP-005 | Medium | Select ▼ | ||||||||||||||||||||
19 | 2.8 | Legacy Protocol Isolation | Isolate insecure legacy protocols (Modbus, DNP3, older OPC-DA) within their own network segment; block external routing. | IEC 62443 SR 3.3 / NIST 800-82 §6.2 | High | Select ▼ | ||||||||||||||||||||
20 | 3. ACCESS CONTROL & IDENTITY MANAGEMENT | |||||||||||||||||||||||||
21 | 3.1 | Role-Based Access Control (RBAC) | Implement RBAC; assign minimum necessary permissions to each user role (operator, engineer, admin, auditor). | IEC 62443 SR 2.1 / NIST 800-82 §6.2.2 | High | Select ▼ | ||||||||||||||||||||
22 | 3.2 | Unique User Accounts | Eliminate shared accounts; every user must authenticate with a unique, individual account on all OT systems. | IEC 62443 SR 1.1 / NERC CIP-007 | High | Select ▼ | ||||||||||||||||||||
23 | 3.3 | Multi-Factor Authentication | Enforce MFA for all privileged accounts, remote sessions, and SCADA server logins. | IEC 62443 SR 1.1 / NIST 800-82 §6.2.2 | High | Select ▼ | ||||||||||||||||||||
24 | 3.4 | Password Policy | Enforce password complexity (min 12 chars, upper/lower/number/symbol) with 90-day rotation for privileged accounts. | IEC 62443 SR 1.5 / NERC CIP-007-6 R5 | High | Select ▼ | ||||||||||||||||||||
25 | 3.5 | Account Review | Review all active user accounts and permissions every 90 days; disable dormant accounts within 24 hours of termination. | IEC 62443 SR 2.4 / NERC CIP-007 | Medium | Select ▼ | ||||||||||||||||||||
26 | 3.6 | Default Credential Removal | Change all manufacturer default usernames and passwords before commissioning any device. | IEC 62443 SR 1.5 / NIST 800-82 §6.2 | High | Select ▼ | ||||||||||||||||||||
27 | 3.7 | Privileged Account Management | Limit the number of administrator-level accounts; log all privileged actions with timestamps. | IEC 62443 SR 2.1 / NERC CIP-007 | High | Select ▼ | ||||||||||||||||||||
28 | 4. REMOTE ACCESS SECURITY | |||||||||||||||||||||||||
29 | 4.1 | Encrypted VPN | All remote access to the OT network must use an approved, encrypted VPN (IPsec or TLS 1.2+). No direct RDP or SSH to field devices. | IEC 62443 SR 1.13 / NIST 800-82 §6.2.3 / NERC CIP-005 | High | Select ▼ | ||||||||||||||||||||
30 | 4.2 | Jump Server / Bastion Host | Route all remote sessions through a dedicated jump server with session logging, recording, and automatic timeout. | IEC 62443 SR 2.6 / NERC CIP-005 | High | Select ▼ | ||||||||||||||||||||
31 | 4.3 | Vendor / Third-Party Access | Issue time-limited, just-in-time access credentials for vendors; revoke immediately upon job completion; monitor all sessions. | IEC 62443 SR 1.2 / NERC CIP-005 | High | Select ▼ | ||||||||||||||||||||
32 | 4.4 | Session Timeout | Configure idle session timeouts ≤15 minutes on all remote access sessions and HMI workstations. | IEC 62443 SR 1.6 / NIST 800-82 §6.2.2 | Medium | Select ▼ | ||||||||||||||||||||
33 | 4.5 | Remote Access Logging | Log all remote connections: user, source IP, timestamp, session duration, commands executed. Retain logs ≥90 days. | IEC 62443 SR 2.8 / NERC CIP-007 | High | Select ▼ | ||||||||||||||||||||
34 | 4.6 | Modem & Legacy Dial-Up Removal | Audit and remove unauthorized modems or legacy dial-up connections to RTUs or PLCs. | IEC 62443 SR 1.13 / NERC CIP-005 | High | Select ▼ | ||||||||||||||||||||
35 | 5. PATCH & VULNERABILITY MANAGEMENT | |||||||||||||||||||||||||
36 | 5.1 | Vulnerability Scanning | Conduct OT-safe vulnerability scans at least quarterly using a passive or OT-specific scanner (e.g., Claroty, Dragos, Nozomi). | IEC 62443 SR 7.7 / NIST 800-82 §6.3 / NERC CIP-010 | High | Select ▼ | ||||||||||||||||||||
37 | 5.2 | Patch Assessment | Evaluate vendor security patches within 35 days of release; document applicability, risk, and schedule for each asset. | IEC 62443 SR 3.9 / NERC CIP-007-6 R2 | High | Select ▼ | ||||||||||||||||||||
38 | 5.3 | Patch Deployment | Apply critical patches within 35 days; high-severity patches within 90 days; document exceptions with compensating controls. | IEC 62443 SR 3.9 / NERC CIP-007 | High | Select ▼ | ||||||||||||||||||||
39 | 5.4 | Patch Testing | Test patches in a non-production/staging environment before deploying to live SCADA systems. | IEC 62443 / NIST 800-82 §6.3 | High | Select ▼ | ||||||||||||||||||||
40 | 5.5 | Change Management | Submit all changes to OT systems through a formal change management process with rollback plan. | IEC 62443 SR 7.7 / NERC CIP-010 | Medium | Select ▼ | ||||||||||||||||||||
41 | 5.6 | End-of-Life Tracking | Identify all EoL/EoS software and hardware; document compensating controls (e.g., additional monitoring, air-gapping) until replacement. | IEC 62443 SR 7.7 / NIST 800-82 | Medium | Select ▼ | ||||||||||||||||||||
42 | 6. THREAT DETECTION & MONITORING | |||||||||||||||||||||||||
43 | 6.1 | OT Security Monitoring | Deploy continuous, passive network monitoring for OT traffic; alert on anomalous communication patterns. | IEC 62443 SR 6.1 / NIST 800-82 §6.4 / NERC CIP-007 | High | Select ▼ | ||||||||||||||||||||
44 | 6.2 | Security Event Logging | Enable logging on all SCADA servers, HMIs, engineering workstations, and network devices; synchronize clocks with NTP. | IEC 62443 SR 6.1 / NERC CIP-007-6 R4 | High | Select ▼ | ||||||||||||||||||||
45 | 6.3 | Log Retention | Retain security logs for a minimum of 90 days online; archive for 1 year (3 years for NERC CIP environments). | IEC 62443 SR 6.2 / NERC CIP-007 | Medium | Select ▼ | ||||||||||||||||||||
46 | 6.4 | SIEM Integration | Forward OT security events to a SIEM with OT-specific correlation rules; define escalation thresholds. | IEC 62443 SR 6.2 / NIST 800-82 §6.4 | Medium | Select ▼ | ||||||||||||||||||||
47 | 6.5 | IDS/IPS Deployment | Deploy intrusion detection (passive IDS preferred for OT) to monitor traffic between zones and conduits. | IEC 62443 SR 6.2 / NERC CIP-005 | High | Select ▼ | ||||||||||||||||||||
48 | 6.6 | Malware Protection | Deploy OT-compatible endpoint protection on all Windows-based HMIs and SCADA servers; run definition updates on a tested schedule. | IEC 62443 SR 3.2 / NERC CIP-007-6 R3 | High | Select ▼ | ||||||||||||||||||||
49 | 6.7 | Baseline Behaviour | Establish a communication baseline for all SCADA assets; alert on deviations (new connections, unusual polling intervals, protocol anomalies). | IEC 62443 SR 6.2 / NIST 800-82 §6.4 | Medium | Select ▼ | ||||||||||||||||||||
50 | 7. INCIDENT RESPONSE & RECOVERY | |||||||||||||||||||||||||
51 | 7.1 | ICS Incident Response Plan | Document and maintain an OT-specific Incident Response Plan (IRP) covering detection, containment, eradication, recovery, and lessons-learned. | IEC 62443 SR 6.1 / NIST 800-82 §6.5 / NERC CIP-008 | High | Select ▼ | ||||||||||||||||||||
52 | 7.2 | IR Plan Testing | Test the OT IRP at least annually via tabletop exercise or live drill; update the plan after each exercise. | IEC 62443 / NERC CIP-008-6 R2 | High | Select ▼ | ||||||||||||||||||||
53 | 7.3 | Cyber Incident Reporting | Define and document internal and regulatory incident reporting timelines (NERC CIP: 1 hour for Cybersecurity Incidents). | NERC CIP-008 / NIST 800-82 §6.5 | High | Select ▼ | ||||||||||||||||||||
54 | 7.4 | Forensic Evidence Preservation | Define procedures for preserving logs and forensic evidence without disrupting SCADA operations during an incident. | IEC 62443 SR 6.1 / NERC CIP-008 | Medium | Select ▼ | ||||||||||||||||||||
55 | 7.5 | Backup & Recovery | Back up all SCADA configurations, historian data, and server images. Test restores quarterly. Store backups offline or air-gapped. | IEC 62443 SR 7.3 / NERC CIP-009 / NIST 800-82 | High | Select ▼ | ||||||||||||||||||||
56 | 7.6 | Recovery Time Objective | Define and test Recovery Time Objective (RTO) and Recovery Point Objective (RPO) for all critical SCADA functions. | IEC 62443 SR 7.3 / NERC CIP-009 | High | Select ▼ | ||||||||||||||||||||
57 | 8. PHYSICAL SECURITY | |||||||||||||||||||||||||
58 | 8.1 | Physical Access Control | Restrict physical access to control rooms, server rooms, and field equipment enclosures to authorized personnel only. | IEC 62443 SR 2.7 / NERC CIP-006 | High | Select ▼ | ||||||||||||||||||||
59 | 8.2 | Access Logs | Log and audit all physical access to critical cyber assets using electronic access control systems (card reader, PIN, biometric). | IEC 62443 SR 2.8 / NERC CIP-006-6 | High | Select ▼ | ||||||||||||||||||||
60 | 8.3 | CCTV Monitoring | Deploy CCTV surveillance at all entry points to OT areas; retain footage for a minimum of 90 days. | IEC 62443 SR 2.7 / NERC CIP-006 | Medium | Select ▼ | ||||||||||||||||||||
61 | 8.4 | USB & Port Lockdown | Disable or physically block all unused USB ports, CD/DVD drives, and serial ports on field devices and workstations. | IEC 62443 SR 2.3 / NIST 800-82 §6.2 | High | Select ▼ | ||||||||||||||||||||
62 | 8.5 | Environmental Controls | Monitor and alarm on environmental conditions (temperature, humidity, power, smoke) in control rooms and comms cabinets. | NIST 800-82 §6.8 | Medium | Select ▼ | ||||||||||||||||||||
63 | 9. SUPPLY CHAIN & VENDOR MANAGEMENT | |||||||||||||||||||||||||
64 | 9.1 | Vendor Security Assessment | Conduct a cybersecurity assessment of all OT vendors and system integrators before contract award; review annually. | IEC 62443 Part 2-4 / NIST 800-82 | High | Select ▼ | ||||||||||||||||||||
65 | 9.2 | Software Integrity Verification | Verify the integrity (hash / digital signature) of all OT software, firmware, and patches before installation. | IEC 62443 SR 3.4 / NIST 800-82 §6.2 | High | Select ▼ | ||||||||||||||||||||
66 | 9.3 | Third-Party Contract Requirements | Include cybersecurity obligations (right-to-audit, incident notification, patch timelines) in all OT vendor contracts. | IEC 62443 Part 2-4 | Medium | Select ▼ | ||||||||||||||||||||
67 | 9.4 | Component Provenance | Document the country of origin for all critical hardware components; assess supply-chain risk for hardware installed in critical systems. | NIST 800-82 / EO 14028 | Medium | Select ▼ | ||||||||||||||||||||
68 | 10. SECURITY GOVERNANCE & TRAINING | |||||||||||||||||||||||||
69 | 10.1 | OT Security Policy | Maintain a documented, board-approved OT / ICS cybersecurity policy reviewed and updated at least annually. | IEC 62443 Part 2-1 / NIST 800-82 §4 | High | Select ▼ | ||||||||||||||||||||
70 | 10.2 | Security Roles & Responsibilities | Assign a named OT Security Owner / CISO with documented responsibilities for SCADA cybersecurity. | IEC 62443 Part 2-1 / NERC CIP-003 | High | Select ▼ | ||||||||||||||||||||
71 | 10.3 | Annual Security Training | Deliver role-specific cybersecurity awareness training to all OT personnel annually; document completion. | IEC 62443 SR 2.9 / NERC CIP-004 | High | Select ▼ | ||||||||||||||||||||
72 | 10.4 | Security Risk Assessment | Conduct a formal OT cybersecurity risk assessment (using IEC 62443 or NIST RMF) at least every two years or after major changes. | IEC 62443 Part 3-2 / NIST 800-82 §5 | High | Select ▼ | ||||||||||||||||||||
73 | 10.5 | Penetration Testing | Conduct OT-specific penetration tests every two years (or after major architecture changes) using a qualified ICS pen-tester. | IEC 62443 / NERC CIP-010 | Medium | Select ▼ | ||||||||||||||||||||
74 | 10.6 | Management Review | Conduct quarterly management reviews of the OT security posture, outstanding findings, and KPIs. | IEC 62443 Part 2-1 | Medium | Select ▼ | ||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 | ||||||||||||||||||||||||||