| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Part 7 Schedule of Breakdown Prices | |||||||||||||||||||||||||
2 | The bidder shall provide breakdown of item cost and indicate any item not listed, but necessary for the successful completion of the Works. | |||||||||||||||||||||||||
3 | The items and dimensions given are to serve as a guide for the Bidder to submit his prices. If any of these items are not priced, it shall be deemed that the costs for such item(s) have been allowed for elsewhere in this RFP and no claim against them will be considered by the Employer. | |||||||||||||||||||||||||
4 | The Employer reserves the right to vary the quantities and or accept such portions of each RFP. | |||||||||||||||||||||||||
5 | Instructions: 1. Please input the the proposed unit rates for all items, and the proposed quantity for 7.4.9.8 and 7.4.9.9. 2. The Total Price column has formulas to aid the summations of the proposed prices. Please verify your entries. 3. Please submit the completed files in i) excel and ii) PDF which includes the authorised name, signature, company stamp and date at the bottom of every page. | |||||||||||||||||||||||||
6 | Company Name: [Please input Company Name here] | |||||||||||||||||||||||||
7 | S/N | Item Description | Quantity | Unit | Unit Rate [S$] | Total Price [S$] | ||||||||||||||||||||
8 | 7.1 | RFP Submission of Drawings & Layouts | ||||||||||||||||||||||||
9 | 7.1.1 | Proposed 3D artist impression / 3D rendering. Minimal A3 size with 2 to 3 views for Item 7.3.9/10/11 – 3 Existing Units into New Consult Rooms, and Item 7.4 – 4 New Units for Counselling, Administration, Meeting and Pantry Rooms | 1 | Lot | - | Deemed included. | ||||||||||||||||||||
10 | 7.1.2 | Proposed design layout plans (1 piece) | 1 | nos | - | Deemed included. | ||||||||||||||||||||
11 | 7.2 | Preliminaries | ||||||||||||||||||||||||
12 | 7.2.1 | To apply all permits as according to all Landlord/statutory rules and submission. To engage Qualified Person (QP) for design, preparation of submission to the Authorities & Landlord. To obtain all necessary clearances and permits including FSSB submission with Fire Safety Certification, Licensed Electrical Worker for testing and commissioning with single-line diagram endorsement, and Licensed Plumber for all Plumbing and Sanitary works. | 1 | Lot | $ - | |||||||||||||||||||||
13 | 7.2.2 | To supply and produce a complete set of drawings for M&E services, plan layout and detailed works before start of work. Drawings subject to change and amendments before works commence. To provide final drawings QP endorsed in both hard and softcopy (CAD and PDF in thumb drive) and all vendors' contact & information (2 sets). Submission of all documents as required by the Landlord including Signing off and Handover listing. | 1 | Lot | $ - | |||||||||||||||||||||
14 | 7.2.3 | To supply and install hoarding as required by the Landlord. | 1 | Lot | $ - | |||||||||||||||||||||
15 | 7.2.4 | Others including insurance, mobilization cost, site protection, material disposal, and any other items not specified in this RFP but necessary for the completion of the renovation / improvement works, in compliance with local authorities as well as the Landlord’s and the Building Management’s requirements. | 1 | Lot | $ - | |||||||||||||||||||||
16 | 7.2.5 | To submit all As-Built Drawings and Detailed Plans (soft and hard copies) upon completion of the Design & Build project. e.g. M&E Plan, Fire Safety Plan, Wall Setting-out Details, Cabinetry Key Plan, Reflected Ceiling Plan, Floor Finish Plan, Door Key Plan, Louvre Details, Room Elevations, Toilet Details, Masterkey Plan. | 1 | Lot | $ - | |||||||||||||||||||||
17 | 7.3 | Improvement Works for the Existing Medical Centre #01-18, #01-20, #01-21, #01-22, #01-23, #01-24 & #01-25 (includes making good of any damages during the works where required) | ||||||||||||||||||||||||
18 | 7.3.1 | Registration Glass Window To replace the existing glass window panel at Registration Counter with a new panel i.e. so that the line of sight is not obstructed, the patient and staff are visible to each other. | 1 | Lot | $ - | |||||||||||||||||||||
19 | 7.3.2 | To add a clear divider separating the 2 staff at the Registration counter with acoustic properties (double glazed). | 1 | Lot | $ - | |||||||||||||||||||||
20 | 7.3.3 | Entrance Door Area to Non-ARI Area To supply and install sensor on top of the existing entrance sliding door at Non - Acute Respiratory Infection (ARI) area i.e. the sliding door should automatically open / close & the existing wall sensor switch is to be disconnected. | 1 | Lot | $ - | |||||||||||||||||||||
21 | 7.3.4 | Entrance Door Area to ARI Area To supply and install sensor for existing entrance sliding door to ARI area i.e. the sliding door should automatically open / close | 1 | Lot | $ - | |||||||||||||||||||||
22 | 7.3.5 | Acrylic Covers To supply and install acrylic covers to prevent patients from accidentally pressing the switches on the wall at required locations. | 20 | nos | $ - | |||||||||||||||||||||
23 | 7.3.6 | Painting To supply and apply SKK or NIPPON odourless paint suitable for healthcare, all-in-1 emulsion paint (one undercoat and 2 finishing coats) to all walls and partitions. | 1 | Lot | $ - | |||||||||||||||||||||
24 | 7.3.7 | TV Point To supply and install additional TV point, c/w 2 power points at non-ARI patient waiting area between Room 9 and Room 10. Install TV with brackets. TV will be supplied by SAMWMC. | 1 | Lot | $ - | |||||||||||||||||||||
25 | 7.3.8 | Re-configure 3 Existing Rooms into 3 New Consultation Rooms at Non-ARI Area Existing meeting room - to convert to 1 consultation room on one side with new room signage i.e. Supply and install signage for new Room 12 Consultation Room. Remove existing pantry on remaining side and install 1 new shower room and 1 new toilet c/w necessary water proofing works (provide 10 year warranty) and include a small dry change area, mirror, tap and basin. Construct new partition with suitable waterproofing at change room upturn of 1m to prevent new consultation room to become mouldy. Remove existing EM lock, wiring, etc. | 1 | Lot | $ - | |||||||||||||||||||||
26 | 7.3.9 | Room 10 - remove existing full height cabinet, and re-configure into consultation room, new door signage to "Room 10 Consultation Room" | 1 | Lot | $ - | |||||||||||||||||||||
27 | 7.3.10 | Room 14 - re-configure into new consultation room with new door signage. i.e. Change to Room 15 Consultation Room. To change existing room signage for Room 15 (to Room 16). | 1 | Lot | $ - | |||||||||||||||||||||
28 | 7.3.11 | To supply New Doctor Chairs | 4 | nos | $ - | |||||||||||||||||||||
29 | 7.3.13 | Shower / Toilet Room Works To convert existing shower room at non-ARI area to toilet and add 1 more basin and tap c/w necessary water proofing works (provide 10 year warranty). | 1 | Lot | $ - | |||||||||||||||||||||
30 | 7.3.14 | Room 12 & 13 (Dental Rooms) Room 12 - To replace broken counter top with similar counter top where autoclave is. Supply and install top hung cabinet at cleaning area behind main door. Change existing room signage from Room 12 to Room 13 | 1 | Lot | $ - | |||||||||||||||||||||
31 | 7.3.15 | To replace signage at Room 13 to "Room 14 Dental Room" | 1 | Lot | $ - | |||||||||||||||||||||
32 | 7.3.16 | Miscellaneous Works To supply and install door seal at Room 8 to prevent ingress of leaves/dust from external | 1 | Lot | $ - | |||||||||||||||||||||
33 | 7.3.17 | Isolation Room 5 - to supply and install movable table for the purpose of converting to use as a Consultation Room. | 1 | Lot | $ - | |||||||||||||||||||||
34 | 7.3.18 | To supply and install new Ceiling Boards i.e. to replace existing stained and worn-out ceiling boards | 400 | nos | $ - | |||||||||||||||||||||
35 | 7.3.19 | To supply and install external light-weight aluminum louvre panels to span across ARI and Non-ARI entrance of height 1.5m c/w necessary submissions for landlord's and authorities' approval. | 1 | Lot | $ - | |||||||||||||||||||||
36 | 7.4 | Scope of Works For the 4 New Units #01-26, #01-27, #01-28 & #01-29 | ||||||||||||||||||||||||
37 | 7.4.1 | User Brief for the 4 New Units Design and Build proposal for 4 new units. All units are to be interconnected internally. Design concept to be aligned with existing Medical Centre in terms of colour and material selection. Contractor's design proposal can include removal of existing partition and installing new partition/interconnected doors. | 1 | Lot | $ - | |||||||||||||||||||||
38 | 7.4.1.1 | #01-26 Counselling Room for 4 pax with 4 no. 1 seater sofa and coffee table. | 1 | Lot | $ - | |||||||||||||||||||||
39 | 7.4.1.2 | #01-27 for 8 pax Administration Room c/w workstations with half height partition (<1.5m), with 3 rooms (6 pax, 1 pax, 1 pax). To supply and install 2 glass door for 2 no. 1 pax rooms. | 1 | Lot | $ - | |||||||||||||||||||||
40 | 7.4.1.3 | #01-28 Meeting Room. To supply and install operable wall between #01-28 and #01-29. | 1 | Lot | $ - | |||||||||||||||||||||
41 | 7.4.1.4 | #01-29 Meeting Room & Pantry space. Total meeting room space including #01-28 for up to 35 pax. To relocate and install existing projector/screen, TV and fridge from existing pantry. | 1 | Lot | $ - | |||||||||||||||||||||
42 | 7.4.1.5 | To work with existing vendors, e.g. card access for doors, fire alarm, electrical, etc. | 1 | Lot | $ - | |||||||||||||||||||||
43 | 7.4.2 | Walls and Partitions | ||||||||||||||||||||||||
44 | 7.4.2.1 | To supply & apply SKK or NIPPON odourless paint suitable for healthcare, all-in-1 emulsion paint (one undercoat and 2 finishing coats) to all walls and partition (colour to be advised later) | 1 | Lot | $ - | |||||||||||||||||||||
45 | 7.4.2.2 | To supply and install 75mm thick gypsum board partition from finished floor to ceiling (height subject to site verification) for all others c/w internal metal structure, rock wool and joint compound plastering to receive emulsion paint as per the approved proposed drawings. | 1 | Lot | $ - | |||||||||||||||||||||
46 | 7.4.3 | Doors | ||||||||||||||||||||||||
47 | 7.4.3.1 | To provide minimum 3 entrance glass tempered doors at #01-26 Counselling room, #01-27 Administration room, #01-28/29 Meeting cum Pantry room c/w card access and EM lock to meet fire safety requirements including interfacing to existing system, programming, testing and commissioning as per approved proposed design. | 1 | Lot | $ - | |||||||||||||||||||||
48 | 7.4.3.2 | To supply & install internal swing doors/sliding doors in selected laminate finish c/w iron-mongery as per approved proposed design. | 1 | Lot | $ - | |||||||||||||||||||||
49 | 7.4.4 | Floor Finish | ||||||||||||||||||||||||
50 | 7.4.4.1 | To supply and lay vinyl sheet (4mm thick). All surface has to be levelled, screed and dirt free before laying the vinyl c/w clove upturn/skirting (to submit sample for approval). Surface subject to inspection before laying. | 1 | Lot | $ - | |||||||||||||||||||||
51 | 7.4.5 | Ceiling Works | ||||||||||||||||||||||||
52 | 7.4.5.1 | To supply and install grid ceiling for all rooms as per existing design in Medical Centre | 1 | Lot | $ - | |||||||||||||||||||||
53 | 7.4.6 | Pantry | ||||||||||||||||||||||||
54 | 7.4.6.1 | To supply & install pantry cabinet with built-in applicances storage pockets/shelves for refridgerator, table top direct pipe-in new water dispenser (hot & cold) & new microwave. The pantry cabinet should include top storage cabinet and bottom integrated wash basin cabinet in selected quartz counter top surface c/w 150mm high flashback and anti-drop edges to blend into the design. | 1 | Lot | $ - | |||||||||||||||||||||
55 | 7.4.7 | Plumbing Works | ||||||||||||||||||||||||
56 | 7.4.7.1 | To supply and install water copper pipes to all sink as of plan | 1 | Lot | $ - | |||||||||||||||||||||
57 | 7.4.7.2 | To supply and install hand towel holders/dispensers or equivalent to all sinks and accessories (follow existing brands/models) | 1 | Lot | $ - | |||||||||||||||||||||
58 | 7.4.7.3 | To supply and install UPVC discharge water pipings to sinks as per approved proposed design. | 1 | Lot | $ - | |||||||||||||||||||||
59 | 7.4.7.4 | Supply and install water point and water dispenser (hot and cold water) at new pantry area | 1 | Lot | $ - | |||||||||||||||||||||
60 | 7.4.8 | Air-conditioning Works | ||||||||||||||||||||||||
61 | 7.4.8.1 | To supply and install multi-split air-conditioning system with system 2 and system 3 (Daikin / Mitsubishi or equivalent brand) and all its associated works as per approved proposed design. | 1 | Lot | $ - | |||||||||||||||||||||
62 | 7.4.9 | Loose Furniture / Furnishings (Contractor to propose & submit at least 2 samples for selection) | ||||||||||||||||||||||||
63 | 7.4.9.1 | 4 no. 1 seater sofas for counselling room | 4 | nos | - | Deemed included. | ||||||||||||||||||||
64 | 7.4.9.2 | 1 coffee table for counselling room | 1 | nos | - | Deemed included. | ||||||||||||||||||||
65 | 7.4.9.3 | Office chairs | 8 | nos | - | Deemed included. | ||||||||||||||||||||
66 | 7.4.9.4 | Office workstations | 8 | nos | - | Deemed included. | ||||||||||||||||||||
67 | 7.4.9.5 | Movable pedestal with stationary tray & lockset for staff | 8 | nos | - | Deemed included. | ||||||||||||||||||||
68 | 7.4.9.6 | Storage cabinets with adjustable shelves & locksets for Admin Room | 1 | nos | - | Deemed included. | ||||||||||||||||||||
69 | 7.4.9.7 | Meeting room chairs (stackable) | 35 | nos | - | Deemed included. | ||||||||||||||||||||
70 | 7.4.9.8 | Meeting room movable tables (contractor's proposal) | Bidder to Propose | nos | - | Deemed included. | ||||||||||||||||||||
71 | 7.4.9.9 | Pantry chairs (contractor's proposal) | Bidder to Propose | nos | - | Deemed included. | ||||||||||||||||||||
72 | 7.4.9.10 | Storage cabinets with adjustable shelves & locksets for Meeting cum Pantry room | 1 | Lot | - | Deemed included. | ||||||||||||||||||||
73 | 7.4.10 | Electrical Works | ||||||||||||||||||||||||
74 | 7.4.10.1 | Supply and install 13A electrical socket outlet (twin sockets) | 60 | nos | $ - | |||||||||||||||||||||
75 | 7.4.10.2 | Supply and install 20A aircon isolators | 4 | nos | $ - | |||||||||||||||||||||
76 | 7.4.10.3 | To install Telephone points | 12 | nos | $ - | |||||||||||||||||||||
77 | 7.4.10.4 | All lighting points with light fixtures (LED type) as per approved proposed design | 20 | nos | $ - | |||||||||||||||||||||
78 | 7.4.10.5 | To supply and install new Electrical Distribution Board, and to connect from existing isolator with single line | 1 | Lot | $ - | |||||||||||||||||||||
79 | 7.4.10.6 | To supply and install CCTV system with 30 days recording (5 cameras) to integrate into existing CCTV system | 1 | Lot | $ - | |||||||||||||||||||||
80 | 7.4.10.7 | To supply lighting and AV/speakers for meeting room/presentation purpose. (contractor to propose) | 1 | Lot | $ - | |||||||||||||||||||||
81 | 7.4.10.8 | To supply and install EM locks for doors at various locations with contactless release button as per approved proposed design. Card access system in reader, contactless exit button, breakglass, EM lock, controller, power supply with back up battery, comm cable, controller opener including interfacing to existing system, programming, testing and commissioning. | 1 | Lot | - | Deemed included. | ||||||||||||||||||||
82 | 7.4.11 | Fire Protection System | ||||||||||||||||||||||||
83 | 7.4.11.1 | To supply and install exit light, fire extinguishers with mounting brackets/housing enclosure, battery pack UFO emergency LED lights, etc. To comply with QP instruction and FSSB regulations. Units to be QP endorsed and submission to relevant authorities for approval. To obtain fire safety certification and etc. | 1 | Lot | $ - | |||||||||||||||||||||
84 | 7.4.11.2 | To supply and install Public Address System speakers c/w metal trunkings, GI conduit, FR cables, programming, linking back to existing PA system / fire alarm and zoning, necessary accessories and associated works. | 1 | Lot | $ - | |||||||||||||||||||||
85 | 7.4.12 | IT Systems | ||||||||||||||||||||||||
86 | 7.4.12.1 | To supply and install cabling works for network points. The copper cabling used is the industry standard Category 6 (CAT 6 cable) shielded copper cables based on industry best practices. Where fiber is deployed, 6-core Multimode OM3 fibres shall be used. | 35 | nos | $ - | |||||||||||||||||||||
87 | 7.4.12.2 | The cabling start point and end point will be from the IT rack to the user end. At the user end, the cable must be terminated on white face plate. | 1 | Lot | - | Deemed included. | ||||||||||||||||||||
88 | 7.4.12.3 | The cable has to be a single continuous run from start to end. | 1 | Lot | - | Deemed included. | ||||||||||||||||||||
89 | 7.4.12.4 | For data outlet points shall be deployed within one (1) metre of the location where IT required the data outlet point especially for Wireless Access Points (WAP). These should be within one arm's length (max 0.5 metre) from access panels. | 1 | Lot | - | Deemed included. | ||||||||||||||||||||
90 | 7.4.12.5 | To supply and install appropriate conduits. All the cables have to be laid in either a metal trunk or appropriate conduits – which is deemed as the cable support system. The cabling must be concealed in these conduits. | 1 | Lot | $ - | |||||||||||||||||||||
91 | 7.4.12.6 | To supply and install patch panel with cable management at the IT rack. | 1 | Lot | $ - | |||||||||||||||||||||
92 | 7.4.12.7 | To supply AWG 28 patch cables for connecting between patch panel and network switches. The patch cords should be 1 metre in length and white in colour except for patch cords meant for Access Points which are to be Green colour. | 35 | nos | $ - | |||||||||||||||||||||
93 | 7.4.12.8 | To supply labels and labour to label the patch panel and faceplates, install the patch cables between the network switches and the patch panel. Labelling format would be provided by the IT infrastructure team. | 1 | Lot | $ - | |||||||||||||||||||||
94 | 7.4.12.9 | The vendor shall use cable ties to secure any cabling to the network rack. For patching at the network switches, the patch cords need to be secured using Velcro strips. Cable ties are not allowed. | 1 | Lot | - | Deemed included. | ||||||||||||||||||||
95 | 7.4.12.10 | Patch cables must be properly organized and should not be obstructing other devices or ports within the IT rack. | 1 | Lot | - | Deemed included. | ||||||||||||||||||||
96 | 7.4.12.11 | To supply cable test reports. The cables laid have to be accompanied with a test result from a fluke tester clearly indicating the performance and gain loss of the cabled laid with the cable length shown. | 1 | Lot | $ - | |||||||||||||||||||||
97 | 7.4.12.12 | To provide documentation of the cabling installed. | 1 | Lot | $ - | |||||||||||||||||||||
98 | 7.4.12.13 | Document the switch port to patch panel port connection. | 1 | Lot | - | Deemed included. | ||||||||||||||||||||
99 | 7.4.12.14 | Document the cabling to user locations. Overlay on the floor plans with the list of all ports and their locations and port number labels. | 1 | Lot | - | Deemed included. | ||||||||||||||||||||
100 | 7.4.12.15 | To supply labour for works required for the cabling support system. All hacking, drilling, penetration works required shall be worked out and comply with building management (e.g. submit of document for the necessary permits to perform works). This should be at no additional cost to the Company. | 1 | Lot | $ - | |||||||||||||||||||||