CONSTRUCTION WORKER PRODUCTIVITY NORMS — NIGERIA
2
Source: "Construction Workers Average Output in Nigeria" (Official Nigerian Construction Industry Reference) | 8-hour working day basis
3
HOW TO USE: All labour hour (hr/unit) values in Col L of the Schedule are derived from these outputs using: hr/unit = 8hr ÷ daily_output. To change a productivity assumption, update the Col L formula denominator.
4
5
SECTION A — EXCAVATION & EARTHWORKS
6
#Activity / Work TypeOutput
(day)
UnitCrew
Type
hr /
unit
Formula in
Schedule
Notes / ConditionsTemplate Col L
(current)
7
ATrench excav, foundation ≤675mm wide, ≤1.5m deep6.00m³/dayUnskilled1.3333333331.333hr/m³Soft laterite / normal soilFormula: 8/4.5 pit or =8/6 trench
8
BPit excav (pads) ≤1.5m deep4.50m³/dayUnskilled1.7777777781.778hr/m³Pad/column base excavationFormula: 8/4.5
9
CBasement excav, ground tank ≤1.5m3.50m³/dayUnskilled2.2857142862.286hr/m³Wider cut, less room to swing—
10
DBasement excav, ground tank 1.5–3.0m1.75m³/dayUnskilled4.5714285714.571hr/m³Deeper cut, shoring required—
11
EBackfill sides of excavation10.00m³/dayUnskilled0.80.800hr/m³Returned excavated materialFormula: 8/10
12
FImported filling to make up level7.00m³/dayUnskilled1.1428571431.143hr/m³Laterite/hardcore import+spreadFormula: 8/7
13
14
SECTION B — CONCRETE WORKS
15
#Activity / Work TypeOutput
(day)
UnitCrew
Type
hr /
unit
hr/unit
(REFERENCE)
Schedule
Col L Rate
Notes / Clarification
16
AHand mix+place, ≤3m above GL0.5 m³/daym³/dayGang: 4 Unskilled16Gang ref only≈4-7hr/m³
GANG DAILY OUTPUT: A 4-man mixing gang (1 mixer + 3 labourers) produces approximately 0.5m³/day finished concrete. This is the TOTAL GANG OUTPUT — NOT each man's billing rate. SCHEDULE Col L uses 4-6hr/m³ ATTENDANCE rate (time each labourer is physically present and active on concrete work). Do NOT use 16hr/m³ for billing — use 4-6hr/m³.
17
BMachine mix+place, ≤3m above GL4-5 m³/daym³/day
Gang: Mixer Op + 2 Lab
2Gang ref only≈1-2hr/m³
GANG DAILY OUTPUT: A 3-man machine-mix gang produces 4-5m³/day concrete. Machine mix is always FASTER than hand mix (4-5 vs 0.5m³/day). Previous incorrect figure of 0.6m³/day has been corrected. SCHEDULE: Mixer Operator bills at 1hr/m³ attendance; Labourers bill at 4-6hr/m³ attendance — not the gang output figure.
18
CSpread+tamp cols/walls/beams10.00m³/dayUnskilled0.80.800 hr/unitSpreading and tamping only (after pour)Formula: 0.8hr/m³
19
DSteel fixer — cut/bend/fix ≤16mm80kg/daySkilled100100.0 hr/t
PDF reference: 100kg/day per skilled bender (ideal). Nigerian site reality (manual bending, labour turnover): 80kg/day per person. Schedule uses =8/0.08 = 100hr/t (80kg/day/person basis). This is within the reviewer-recommended 60-80kg/day range. Iron Bender (separate trade) handles bending; Steel Fixer handles placement.
Formula: 8/0.1 = 80hr/t
20
ESteel fixer — machine bend/cut 20–25mm50kg/daySkilled160160.0 hr/tMachine-assisted larger bars — 60kg/day
Links/stirrups: individually bent to shape, tied in place one by one. Nigerian site reality: 50kg/day per skilled iron bender (not 60kg/day). Schedule uses =8/0.05 = 160hr/t for all 8mm link/stirrup items. This is correctly HIGHER than straight bars (100hr/t) — links are slower.
21
FCut/bend/fix mesh fabric (BRC)120m²/daySkilled0.066666666670.067 hr/unitMesh fabric A-type on slabFormula: 8/80 = 0.1hr/m²
22
23
SECTION C — FORMWORK (CARPENTRY)
24
#Activity / Work TypeOutput
(day)
UnitCrew
Type
hr /
unit
Formula in
Schedule
Notes / ConditionsTemplate Col L
(current)
25
HGround beams/bases ≤1.0m high12m²/daySkilled0.66666666670.667 hr/m²Simple ground level form—
26
JColumns or walls8m²/daySkilled11.000 hr/m²Vertical column faces+bracingFormula: 8/8 = 1.0hr/m²
27
KBeams — sides and soffit5m²/daySkilled1.61.600 hr/m²Beams are hardest (sides+soffit+props)Formula: 8/5 = 1.6hr/m²
28
LLintels6m²/daySkilled1.3333333331.333 hr/m²Small members, more cutsFormula: 8/6 = 1.33hr/m²
29
MFloor slab soffit ≤3.5m15m²/daySkilled0.53333333330.533 hr/m²Large flat area, good productivityFormula: 8/15 = 0.53hr/m²
30
NDismantle — beams or columns16m²/daySkilled0.50.500 hr/m²Strip and set asideNot separately billed
31
PDismantle — floor slab30m²/daySkilled0.26666666670.267 hr/m²Drop the prop, sheet fallsNot separately billed
32
33
SECTION D — BLOCKWORK
34
#Activity / Work TypeOutput
(day)
UnitCrew
Type
hr /
unit
Formula in
Schedule
Notes / ConditionsTemplate Col L
(current)
35
A100mm blockwall8m²/dayGang (1M+1L)11.000 hr/m²Each person bills 1.0hr/m² (mason + labourer)—
36
B150mm blockwall8m²/dayGang (1M+1L)11.000 hr/m²Same output as 100mmFormula: 8/8 = 1.0hr/m²
37
C230mm / 225mm blockwall6m²/dayGang (1M+1L)1.3333333331.333 hr/m²
Nigerian site condition: 225mm hollow blocks are significantly heavier than 150mm blocks. Gang output reduced from PDF's 7m²/day to 6m²/day to reflect extra handling time, heavier lifts, and greater mortar volume. Matches schedule formula =8/6.
Formula: 8/7 = 1.14hr/m²
38
DPrecast concrete screenwall10m²/dayGang (1M+1L)0.80.800 hr/m²Lighter precast panels—
39
EClay block screenwall12m²/dayGang (1M+1L)0.66666666670.667 hr/m²Light clay blocks, fastest—
40
FGlass blockwall10m²/dayGang (1M+1L)0.80.800 hr/m²Careful handling needed—
41
42
SECTION E — ROOFING & CEILING (Gang: 2 Carpenters + 1 Labour)
43
#Activity / Work TypeOutput
(day)
UnitCrew
Type
hr /
unit
Formula in
Schedule
Notes / ConditionsTemplate Col L
(current)
44
AGable roof bungalow @ 3.5m25m²/dayGang (2C+1L)0.960.960 hr/m²Per person in gang. 25m²/day totalFormula: 8/(130/3) ≈ 0.185
45
BGable roof 3-storey @ 6.5m15m²/dayGang (2C+1L)1.61.600 hr/m²Per person, higher level slower—
46
CGable roof 3-storey @ 9.5m9m²/dayGang (2C+1L)2.6666666672.667 hr/m²Per person, highest level slowest—
47
DCeiling noggins (framing)30m²/dayGang (2C+1L)0.80.800 hr/m²Per personFormula: 8/30 per carpenter
48
KAluminium roofing sheet, bungalow130m²/dayGang (2C+1L)0.18461538460.185 hr/m²Per person in 3-man gangFormula: 8/(130/3)=0.185
49
50
SECTION F — JOINERY (DOORS)
51
#Activity / Work TypeOutput
(day)
UnitCrew
Type
hr /
unit
Formula in
Schedule
Notes / ConditionsTemplate Col L
(current)
52
AFix hollow-core flush door (pair hinges+lock)4Nr/daySkilled22.000 hr/Nr"Fix only" — door pre-made+deliveredFormula: 5hr/nr
53
BFix solid-core flush door3Nr/daySkilled2.6666666672.667 hr/Nr"Fix only" — solid door, heavierFormula: 6hr/nr (incl. build-in)
54
CFix hardwood framed door2Nr/daySkilled44.000 hr/Nr"Fix only" — frame+hang+hardwareFormula: 7hr/nr (incl. frame)
55
56
SECTION G — FINISHINGS
57
#Activity / Work TypeOutput
(day)
UnitCrew
Type
hr /
unit
Formula in
Schedule
Notes / ConditionsTemplate Col L
(current)
58
APlastering wall18m²/daySkilled0.44444444440.444 hr/unitTypical wall rendering/plaster 13mmFormula: 8/18 = 0.44hr/m²
59
BPlastering ceiling soffit ≤3.5m10m²/daySkilled0.80.800 hr/unitOverhead work, slower—
60
CPlastering 4-sided column6m/daySkilled1.3333333331.333 hr/unitPer linear metre of column—
61
DPlastering 3-sided beam25m²/daySkilled0.320.320 hr/unitBeam soffit+sides—
62
EScreeding floor 50mm thick25m²/daySkilled0.320.320 hr/unitAt 50mm. 25mm≈35m²/day → 0.229hrFormula: 8/35 = 0.23hr/m²
63
FFloor tiling 300×300 with screed bed10m²/daySkilled0.80.800 hr/unit300×300 tiles. 600×600≈13m²/dayFormula: 8/13 = 0.6hr/m²
64
GWall tiling 300×300 with screed backing8m²/daySkilled11.000 hr/unit300×300 tiles. 400×400≈9m²/dayFormula: 8/9 = 0.89hr/m²
65
HBuild-in & dress single door frame2Nr/daySkilled44.000 hr/unitFrame, pack, pointCombined with hang in template
66
KBuild-in & dress window 1200×1200mm2Nr/daySkilled44.000 hr/unitFix frame in opening, point round—
67
LBuild-in & dress window 1800×1200mm1Nr/daySkilled88.000 hr/unitLarger window, more work—
68
69
NOTE: All outputs are for normal soil conditions and standard Nigerian construction practice. Adjust for difficult access, heights above 3.5m, or non-standard materials. Gang rates (Mason+Labour, 2 Carpenters+Labour) bill each worker separately in the Schedule.
70
71
SECTION H — SITE EFFICIENCY FACTOR (Apply to all Labour Hours)
72
The Site Efficiency Factor adjusts all labour hours for real-world Nigerian site conditions (weather, Ramadan, material handling delays, supervision gaps). A factor of 0.85 means workers are 85% productive — multiply all Schedule Col L hours by (1 ÷ factor) to get field-adjusted hours.
73
Factor CodeSite ConditionEfficiency FactorEquivalent OutputLabour Hour MultiplierRecommended For
74
EF-1Controlled / Ideal conditions1.00100% of norm× 1.00
Factory, controlled environment
75
EF-2Good site — dry, good management0.9090% of norm× 1.11
Well-managed Lagos/Abuja site
76
EF-3Typical Nigerian site ◄ DEFAULT0.8585% of norm× 1.18
Average conditions — use this
77
EF-4Wet season or remote site0.7575% of norm× 1.33
Rainy season, far from suppliers
78
EF-5Adverse — very remote / conflicts0.6565% of norm× 1.54
Northern remote, Ramadan, disputes
79
HOW TO USE: (1) Select your Site Condition above. (2) In Col L of the Schedule, multiply each hour formula by the Labour Hour Multiplier. EXAMPLE: Mason blockwork 225mm: normally =8/6 = 1.333hr/m². On a typical Nigerian site (EF-3): =8/6 × 1.18 = 1.571hr/m². Alternatively, use the Factor cell (0.85) to scale your total Labour Cost in the Grand Summary.
80
81
SECTION I — CONCRETE GRADE & MIX RATIO REFERENCE TABLE (Nigerian Practice)
82
All mix ratios by volume (cement:fine aggregate:coarse aggregate). Cement bags based on 50kg bag = 0.0347m³. Dry rodded bulk density used. Water-cement ratio: 0.45-0.55 for structural (0.55 max for durability). Aggregates: specify 20mm clean crushed granite; Zone II sharp river sand.
83
GradeBESMM4 Mix RatioCement (bags/m³)Sharp Sand (m³/m³)
Granite 20mm (m³/m³)
Water (m³/m³)Typical Application
84
C101:4:840.5380.7680.120Weak blinding, oversite fill, backing concrete
Very weak blinding only — site roads, oversite fill, not structural
85
C151:3:6 (or 1:2:5)50.5250.7480.125Blinding, mass fill, pathways (no rebar)
86
C201:2:470.50.7130.180
Mass paving slabs, unreinforced walls, foundations <1.5m
87
C251:1.5:390.4770.680.200
★ STANDARD STRUCTURAL RC: Columns, beams, slabs, lintels, stairs
★ STANDARD STRUCTURAL RC: Columns, beams, slabs, lintels, stairs. NOTE: This schedule uses Grade C20 (1:2:4) for all structural items acceptable for residential buildings under BS 8110/NCP. Upgrade to C25 (1:1.5:3) for critical or multi-storey structures.
88
C301:1.5:390.4770.680.175High-stress members, water-retaining structures, piling
89
C351:1:2130.4370.6240.150
Pre-stressed, heavily reinforced, aggressive environment
90
Screed 1:4—0.220.031—0.020
25mm cement:sand floor screed (no coarse aggregate)
91
Mortar 1:6—0.40.083—0.030
Blockwork bedding mortar (225mm, 150mm hollow blocks)
92
93
94
95
96
97
98
99
100