ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
Verona 740
2
Available Budget $ 33,700
3
sidewalk only
4
DescriptionNumberUnits Unit price Total
5
Catch Basins1EA $ 1,500 $ 1,500
6
Storm Drains50LF $ 30 $ 1,500
7
Sidewalk Base Gravel608TN $ 12 $ 7,301
8
Sidewalk crushed Gravel152TN $ 18 $ 2,738
9
Curb (concrete)680 $ 15 $ 10,200
10
Asphalt Sidewalk59TN $ 200 $ 11,717
11
Markings1LS $ 250 $ 250
12
Total $ 35,206
13
Assumptions:
14
Town staff complete the work
15
5' sidewalk on north side of the road
16
ROW is 50' (verified)
17
Crosswalk would be prior (east) of the north Brook Hollow driveway
18
Crosswalk on East Wheelock would remain in existing location
19
Sidewalk ends at Willow Springs (original CIP funding criteria)
20
21
MUP
22
DescriptionNumberUnits Unit price Total
23
Bank Run Gravel Base811TN $ 15 $ 12,169
24
Crushed Gravel203TN $ 22 $ 4,462
25
Asphalt base141TN $ 200 $ 28,120
26
Asphalt Pavement160TN $ 120 $ 19,178
27
Utility pole relocation make ready*2EA $ 10,000 $ 20,000
28
Hydrant relocation1EA $ 3,500 $ 3,500
29
Gate Valve Replacement1EA $ 1,500 $ 1,500
30
Catch Basins6EA $ 1,500 $ 9,000
31
Storm Drains180LF $ 30 $ 5,400
32
Hedge Replacement135LF $ 25 $ 3,375
33
Fence Replacement80LF $ 25 $ 2,000
34
MUP Base Gravel1014TN $ 15 $ 15,211
35
MUP crushed Gravel254TN $ 22 $ 5,577
36
Curb680 $ 25 $ 17,000
37
MUP Asphalt117TN $ 200 $ 23,433
38
Markings1LS $ 350 $ 350
39
Total $ 170,276
40
41
Assumptions:
42
* 3rd & 4th Utility poles will be required to be relocated, make ready costs are difficult to determine
43
hedge and fence will need to be replaced
44
MUP width 10' will require road to be shift to the north 8'
45
Crosswalk on East Wheelock would remain in existing locaiton
46
MUP would end at Willow Springs
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100