1 | DR-4886-NM FEMA Project Status Summary May 5, 2026 | |||||||||||||||||||||||||
2 | ||||||||||||||||||||||||||
3 | FEMA Project Worksheet (PW) # | FEMA Project # | FEMA Category | FEMA Title | Damaged Sites | FEMA Process Step | Village of Ruidoso Repair Step | *FEMA Estimated Cost | *FEMA Estimated Federal Share Cost | |||||||||||||||||
4 | 2 | 958942 | A - Debris Removal | Village-Wide Debris Removal | Village-Wide | Obligated | Pending Reimbursement | $382,333.29 | $286,749.97 | |||||||||||||||||
5 | 1 | 958940 | B - Emergency Protective Measures | Emergency Protective Measures | Village-Wide | Obligated | Partially Reimbursed | $4,133,333.34 | $3,100,000.01 | |||||||||||||||||
6 | 134 | 1065133 | B - Emergency Protective Measures | Racetrack Emergency Work | Racetrack detention pond, perimeter fence, and western track culverts | Pending PDMG Application Review | Pending Obligation | $8,567,094.60 | $6,425,320.95 | |||||||||||||||||
7 | 122 | 1063635 | B - Emergency Work Donated Resources | Village Wide Donated Resources | Village-Wide | Pending TFL Review | Pending Obligation | $0.00 | $0.00 | |||||||||||||||||
8 | 71 | 966377 | C - Roads and Bridges | Grindstone Bridge v0 | N. Grindstone bridge at Rio Ruidoso | Obligated | Pending Engineering Proposal | $92,000.00 | $69,000.00 | |||||||||||||||||
9 | 91 | 966679 | C - Roads and Bridges | N. Loop Bridge | N. Loop Rd. at Rio Ruidoso eastern crossing | Obligated | Pending RFP | $83,385.00 | $62,538.75 | |||||||||||||||||
10 | 11 | 962140 | C - Roads and Bridges | Village Wide Roads, Culverts, and Ditches | 1. N., Loop Road, 2) Maple Drive, 3) Paradise Canyon Road, 4) Gavilan Canyon Road, 5) Alpine Village Road, 6) Country Club Drive, 7) Coyote Bridge, 8) Cree Meadows Drive, 9) Eagle Drive Bridge, 10) Ebarb Drive, 11) Ike Wingfield Drive, 12) Main Road, 13) Metz Drive, 14) Mountain Trail, 15) N. Oak Drive, 16) Porr Drive, 17) River Trail, 18) Singing Pines Road, 19) Valonia Lane, 20 White Mountain Drive, 21) Wilson Lane, 22) Brady Canyon Road, 23) Jack Little Drive, 24) Leon Farrar Drive, 25) Close Road, 26) Fern Trail, 27) Olympia Road, 28) University Drive, 29) Warren Tucker Drive, 30) Whitney Drive, 31) Kenza Trail, 32) Ash Drive, 33) Robin Road, 34) Starlite Road, 35) Hummingbird Lane, 36) Peak Drive, 37) Perk Canyon Drive, 38) St. Vitus Place, 39) Ponderosa Drive, 40) Marie Lane, 41) Deck Road, 42) Rio Street, 43) Hiding Place, 44) Bradford Drive, 45) Malone Road Bridge, 46) Juniper Road, 47) Warrior Drive, 48) Sunny Slope Drive | Pending Final FEMA Review | Pending Obligation | $2,125,713.00 | $1,594,284.75 | |||||||||||||||||
11 | 111 | 967929 | D - Water Control Facilities | Erosion Control Boulders near Water Plant 1 | Rio Ruidoso near 1140 Main Rd. | Obligated | Pending Engineering Task Order | $219,257.82 | $164,443.37 | |||||||||||||||||
12 | 23 | 962940 | D - Water Control Facilities | Upper Canyon Surface Diversion | Rio Ruidoso between Malone Rd. and Martin Rd. | Obligated | Engineering | $159,526.00 | $119,644.50 | |||||||||||||||||
13 | 24 | 962941 | F - Utilities | Water Distribution Center & Water Plant 1 | Village-Wide primarily surrounding Rio Ruidoso | Obligated | Engineering | $397,804.00 | $298,353.00 | |||||||||||||||||
14 | 22 | 962936 | F - Utilities | Regional Wastewater Treatment Plant | Regional Wastewater Treatment Plant | Pending Final FEMA Review | Pending Obligation | $610,069.94 | $457,552.46 | |||||||||||||||||
15 | 13 | 962288 | F - Utilities | Wastewater Collection System Village Wide v0 | Majority of Wastewater Collection System about 14 miles in length | Obligated | Engineering | $1,618,875.00 | $1,214,156.25 | |||||||||||||||||
16 | 62 | 965836 | G - Parks, Recreational Facilities, and Other Items | Fish Weirs and Ladders v0 | Rio Ruidoso at Two Rivers Park | Obligated | Pending Engineering Task Order | $74,714.00 | $56,035.50 | |||||||||||||||||
17 | 52 | 964284 | G - Parks, Recreational Facilities, and Other Items | Gavilan Softball Field, Fire Station 2 Ball Field, and Two Rivers Park | Gavilan, Fire Station # 2, and White Mt. Sports Complex Ball Fields and White Mt. Sports Complex Trails and Two Rivers Park | Pending Final FEMA Review | Pending Obligation | $1,189,772.24 | $892,329.18 | |||||||||||||||||
18 | 53 | 964286 | G - Parks, Recreational Facilities, and Other Items | Side Loading Containers, Cree Meadows Pedestrian Bridge, Eagle Dr Sidewalk, and Moon Mountain | Village-Wide Waste Containers, Pedestrian Bridge at Cree Meadows Dr, Eagle Mt. Bridge Sidewalks, Moon Mountain Access road | Obligated | Pending Contractor Quotes | $57,149.65 | $42,862.24 | |||||||||||||||||
19 | 9 | 960127 | Z - Management Costs | Management Costs | Cost to Administer FEMA PA | Pending Award | Pending Obligation | $360,918.91 | $360,918.91 | |||||||||||||||||
20 | Total | 16 | $ 20,071,946.79 | $ 15,144,189.84 | ||||||||||||||||||||||
21 | ||||||||||||||||||||||||||
22 | *Projects will be reimbursed based on actual costs. | |||||||||||||||||||||||||
23 | ||||||||||||||||||||||||||
24 | ||||||||||||||||||||||||||
25 | ||||||||||||||||||||||||||
26 | ||||||||||||||||||||||||||
27 | ||||||||||||||||||||||||||
28 | ||||||||||||||||||||||||||
29 | ||||||||||||||||||||||||||
30 | ||||||||||||||||||||||||||
31 | ||||||||||||||||||||||||||
32 | ||||||||||||||||||||||||||
33 | ||||||||||||||||||||||||||
34 | ||||||||||||||||||||||||||
35 | ||||||||||||||||||||||||||
36 | ||||||||||||||||||||||||||
37 | ||||||||||||||||||||||||||
38 | ||||||||||||||||||||||||||
39 | ||||||||||||||||||||||||||
40 | ||||||||||||||||||||||||||
41 | ||||||||||||||||||||||||||
42 | ||||||||||||||||||||||||||
43 | ||||||||||||||||||||||||||
44 | ||||||||||||||||||||||||||
45 | ||||||||||||||||||||||||||
46 | ||||||||||||||||||||||||||
47 | ||||||||||||||||||||||||||
48 | ||||||||||||||||||||||||||
49 | ||||||||||||||||||||||||||
50 | ||||||||||||||||||||||||||
51 | ||||||||||||||||||||||||||
52 | ||||||||||||||||||||||||||
53 | ||||||||||||||||||||||||||
54 | ||||||||||||||||||||||||||
55 | ||||||||||||||||||||||||||
56 | ||||||||||||||||||||||||||
57 | ||||||||||||||||||||||||||
58 | ||||||||||||||||||||||||||
59 | ||||||||||||||||||||||||||
60 | ||||||||||||||||||||||||||
61 | ||||||||||||||||||||||||||
62 | ||||||||||||||||||||||||||
63 | ||||||||||||||||||||||||||
64 | ||||||||||||||||||||||||||
65 | ||||||||||||||||||||||||||
66 | ||||||||||||||||||||||||||
67 | ||||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 | ||||||||||||||||||||||||||