TrailsLocation on trailWork neededWork completedWork hours + travelPermissions neededWork Leader
2
EvolutionLower Evolution, entire trailDrainage refresh/add armoring and rebuild/upgrade turnsPlanned for 2022, need final permissions
3
4
CycloneEntire trail, light work mainly, reroute on lower section where trail folds on itselfDrainage and corridor refresh along entire trail, redo lower Evolution intersection, reroute tight section Hand drainage work can begin any time, reroute permissions needed
5
The second lowest bridge on the lowest section needs a few boards replaced.no permission needed
6
7
ClinicEntire trail, light work mainlyDrainage refresh along entire trailHand work can begin any time
8
9
GSEntire trail, light work mainly, lower section needs moreDrainage refresh along entire trailHand work can begin any time
10
11
BusternutTop and bottomDrainage at entrance/road intersectionPlanned for 2022 with excavator, need private landowner input too
12
Drainage and rockwork on lower section with persistent wet spots Planned for 2022, need final permissions
13
14
Enchanted ForestEntire trail, field and powerline sections have special considerationsUpgrade field and powerline sections, drainage refresh on entire rest of trail - planned for 2022Planned for 2022, wetlands permit for field and powerline, FPR variance for excavator use
15
16
Cyclone ConnectorEntire trail
17
18
Clinic ConnectorEntire trail
19
20
Dana Hill Connector
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100