| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | KARANTINA PARK MAINTENANCE - DETAILED BOQ | |||||||||||||||||||||||||
2 | DESIGN: CATALYTICACTION | |||||||||||||||||||||||||
3 | ||||||||||||||||||||||||||
4 | Price per unit | Unit | Quantity | Total | Notes | |||||||||||||||||||||
5 | A | Concrete works | ||||||||||||||||||||||||
6 | A.1 | M25 reinforced concrete for the playhouses, slide and benches. Includes removal of a few tree stumps, excavations, materials, formworks and required labour for installation. Refer to drawings 04-05 for more details. | $ - | m3 | 4.2 | $ - | ||||||||||||||||||||
7 | A.2 | Removal of all pipes and sealing of the pipe's holes in the system room and compensation tank with concrete. Includes materials and required labour for installation. Refer to drawing 09 for more details. | $ - | n | 10 | $ - | ||||||||||||||||||||
8 | A.3 | New waterproofing membrane system for the existing concrete surface of the bathroom roof. Includes surface preparation, all materials, and labour for installation. Complementary works are also included, such as transportation of removed materials to the legal discharge place. Refer to drawing 07 for more details. | $ - | m2 | 25 | $ - | Please provide specs. | |||||||||||||||||||
9 | ||||||||||||||||||||||||||
10 | B | Wood works | ||||||||||||||||||||||||
11 | B.1 | Removal of damaged wooden decking boards. Includes required labour to deliver the work. Complementary works are also included, such as transportation of removed materials to the legal discharge place. Refer to drawing 02 for more details. | $ - | m2 | 113 | $ - | ||||||||||||||||||||
12 | B.2 | Iroko wood decking board (thickness 20 mm). Includes materials and required labour for delivering the timber sanded, oil treated and installed on existing metal profiles. Refer to drawing 02 for more details. | $ - | m2 | 113 | $ - | ||||||||||||||||||||
13 | B.3 | Replacement of broken Iroko wood pieces (thickness 50 mm) of the benches. Includes materials and required labour for delivering the timber sanded, oil treated and installed. Refer to drawing 03 for more details. | $ - | m3 | 0.02 | $ - | ||||||||||||||||||||
14 | ||||||||||||||||||||||||||
15 | C | Metal works | ||||||||||||||||||||||||
16 | C.1 | Hollow steel bar Ø 2" (thickness 2.5 mm) for the handrail of the zip line platform. Includes materials and required labour to implement the specified design. Steel has to be treated with a primer coat and painted (two layers). Refer to drawing 06 for more details. | $ - | kg | 15.7 | $ - | ||||||||||||||||||||
17 | C.2 | Stainless steel sheet 0.5x1.5 m (thickness 2 mm - grade AISI 316L) for the slide. Includes materials and required labour to implement the specified design. Refer to drawing 04 for more details. | $ - | LS | 1 | $ - | ||||||||||||||||||||
18 | ||||||||||||||||||||||||||
19 | D | Paint works | ||||||||||||||||||||||||
20 | D.1 | Painting of the existing concrete low walls, new concrete playhouses, slide and benches with Tinol water based paint colors. Includes materials and required labour for installation. Refer to drawings 04-05-08 for more details. | $ - | m2 | 91 | $ - | ||||||||||||||||||||
21 | D.2 | Fixing and painting of the bathrooms' ceiling with Tinol water based paint colors. Includes materials and required labour for installation. Refer to drawing 07 for more details. | $ - | m2 | 25 | $ - | ||||||||||||||||||||
22 | D.3 | Painting of floor games with polyurethane paint. Includes materials and required labour for installation. Refer to drawing 08 for more details. | $ - | m2 | 21.4 | $ - | ||||||||||||||||||||
23 | ||||||||||||||||||||||||||
24 | E | Play items | ||||||||||||||||||||||||
25 | E.1 | Rubber seat (thickness 1 cm) for the toddlers swing. Includes materials and required labour for installation. Refer to drawing 03 for more details. | $ - | n | 1 | $ - | Suggested provider: Lattouf Traiding (Beirut) | |||||||||||||||||||
26 | E.2 | Stainless steel plate 7x18.8 cm (thickness 2 mm) for the toddlers swing. Includes materials and required labour to implement the specified design. Refer to drawing 03 for more details. | $ - | n | 2 | $ - | ||||||||||||||||||||
27 | E.3 | Stainless steel chain 6 mm for the toddlers swing. Includes materials and required labour to implement the specified design. Refer to drawing 03 for more details. | $ - | m | 4 | $ - | ||||||||||||||||||||
28 | E.4 | Stainless steel shackles 10 mm for the toddlers swing. Includes materials and required labour for installation. Refer to drawing 03 for more details. | $ - | n | 4 | $ - | ||||||||||||||||||||
29 | E.5 | Moving of the steel cable of the existing zip line. Includes required labour to deliver the work. Refer to drawing 06 for more details. | $ - | LS | 1 | $ - | ||||||||||||||||||||
30 | E.6 | Reflective Alucobond sheet (thickness 5 mm). Includes material and installation on a concrete surface with PU45 glue. Refer to drawing 06 for more details. | $ - | m2 | 16 | $ - | ||||||||||||||||||||
31 | ||||||||||||||||||||||||||
32 | F | Safe floor | ||||||||||||||||||||||||
33 | F.1 | Rubber tiles 50x50cm (thickness 20 mm) for the playhouses. Includes materials and required labour for installation. Refer to drawing 05 for more details. | $ - | m2 | 6 | $ - | ||||||||||||||||||||
34 | ||||||||||||||||||||||||||
35 | G | Plumbing works | ||||||||||||||||||||||||
36 | G.1 | Drainage of water inside the system room and compensation tank with a pump. Includes required labour to deliver the work. Refer to drawing 09 for more details. | $ - | LS | 1 | $ - | ||||||||||||||||||||
37 | G.2 | Automatic start/stop water booster pump to increase municipal water pressure and supply 3 bathroom water tanks with a total capacity of 6,000 liters within 1 hour (based on average daily municipal electricity availability). Includes all materials, enclosure shall to protect the booster pump and associated electrical components, accessories and required labour for installation. Refer to drawings 10-11 for more details. | $ - | LS | 1 | $ - | Contractor to conduct site assessment prior to submitting their offer, and provide pump specifications, installation method, and detailed cost breakdown (pump, system components, labour, etc.). | |||||||||||||||||||
38 | ||||||||||||||||||||||||||
39 | ||||||||||||||||||||||||||
40 | SUB TOTAL: | $ - | ||||||||||||||||||||||||
41 | VAT 11% | $ - | ||||||||||||||||||||||||
42 | ||||||||||||||||||||||||||
43 | ||||||||||||||||||||||||||
44 | GRAND TOTAL: | $ - | ||||||||||||||||||||||||
45 | ||||||||||||||||||||||||||
46 | ||||||||||||||||||||||||||
47 | ||||||||||||||||||||||||||
48 | ||||||||||||||||||||||||||
49 | ||||||||||||||||||||||||||
50 | ||||||||||||||||||||||||||
51 | ||||||||||||||||||||||||||
52 | ||||||||||||||||||||||||||
53 | ||||||||||||||||||||||||||
54 | ||||||||||||||||||||||||||
55 | ||||||||||||||||||||||||||
56 | ||||||||||||||||||||||||||
57 | ||||||||||||||||||||||||||
58 | ||||||||||||||||||||||||||
59 | ||||||||||||||||||||||||||
60 | ||||||||||||||||||||||||||
61 | ||||||||||||||||||||||||||
62 | ||||||||||||||||||||||||||
63 | ||||||||||||||||||||||||||
64 | ||||||||||||||||||||||||||
65 | ||||||||||||||||||||||||||
66 | ||||||||||||||||||||||||||
67 | ||||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 | ||||||||||||||||||||||||||