1 | Bill Ref. | Description | Quantity | Unit | Rate | Total | |||||||||||||||||||||
2 | GFA | ||||||||||||||||||||||||||
3 | FECA | 2,750.00 | m2 | 0.00 | |||||||||||||||||||||||
4 | UCA | 216.00 | m2 | 0.00 | |||||||||||||||||||||||
5 | External Areas | 696.00 | m2 | 0.00 | |||||||||||||||||||||||
6 | WATERPROOFING | ||||||||||||||||||||||||||
7 | GENERALLY | ||||||||||||||||||||||||||
8 | 10/1A | Tenderers are referred to the Specification for the full particulars of workmanship and materials, and the quantities herein provided shall be read in conjunction with the drawings | Note | 0.00 | |||||||||||||||||||||||
9 | 10/1B | This Builders Bill of Quantities has not been measured in accordance with the Australian Standard Method of Measurement of Building Works, 5th Edition | Note | 0.00 | |||||||||||||||||||||||
10 | REFERENCE | ||||||||||||||||||||||||||
11 | Refer to following sections of "Project" for "Architectural Specification" Revision P1 dated 06 June 2025 by Edmiston Jones: 0621 - Waterproofing - wet areas. | Note | 0.00 | ||||||||||||||||||||||||
12 | Refer to following architectural drawing series: A200 for "Floor Plans" | Note | 0.00 | ||||||||||||||||||||||||
13 | Refer to "Project" for "Materials & Finishes Schedule" Revision E dated 13 June 2025 by I&D Studio | Note | 0.00 | ||||||||||||||||||||||||
14 | PRICES | ||||||||||||||||||||||||||
15 | Prices shall include for: | ||||||||||||||||||||||||||
16 | 10/1C | Fair edges, dressing over angle fillets, turning into grooves and all other labours | Note | 0.00 | |||||||||||||||||||||||
17 | 10/1D | Internal and external angles, fillets, circular edges | Note | 0.00 | |||||||||||||||||||||||
18 | 10/1E | Separation strips other than those specifically detailed | Note | 0.00 | |||||||||||||||||||||||
19 | 10/1F | Nails, screws, clips, rivets, straps, fixings and the like | Note | 0.00 | |||||||||||||||||||||||
20 | 10/1G | Provision for thermal movement | Note | 0.00 | |||||||||||||||||||||||
21 | 10/1H | Isolation of dissimilar materials | Note | 0.00 | |||||||||||||||||||||||
22 | 10/1J | Temporary screeds, rules and grounds | Note | 0.00 | |||||||||||||||||||||||
23 | 10/1K | Laps, square cutting and waste | Note | 0.00 | |||||||||||||||||||||||
24 | 10/1L | Environmental and sustainable requirements detailed in the specification | Note | 0.00 | |||||||||||||||||||||||
25 | GENERAL ITEMS | ||||||||||||||||||||||||||
26 | 10/1M | Allow for giving notice of and providing facilities for inspection, of tanking components | Item | 0.00 | |||||||||||||||||||||||
27 | 10/2A | Allow for protecting the waterproofing from damage throughout the work and cleaning off on completion, including cleaning out of rainwater systems | Item | 0.00 | |||||||||||||||||||||||
28 | 10/2B | Allow for ensuring that the roof slab structure is satisfactory before fixing membranes, and providing certification of same prior to commencing installation | Item | 0.00 | |||||||||||||||||||||||
29 | 10/2C | Allow for testing | Item | 0.00 | |||||||||||||||||||||||
30 | 10/2D | Allow for data submissions | Item | 0.00 | |||||||||||||||||||||||
31 | 10/2E | Allow for warranties | Item | 0.00 | |||||||||||||||||||||||
32 | 10/2F | Allow for maintenance manual | Item | 0.00 | |||||||||||||||||||||||
33 | 10/2G | Allow for workshop drawings and details | Item | 0.00 | |||||||||||||||||||||||
34 | WATERPROOFING | ||||||||||||||||||||||||||
35 | Waterproofing to Wet Areas | ||||||||||||||||||||||||||
36 | Horizontal membrane; applied on wet area floor to falls and/or cross falls | ||||||||||||||||||||||||||
37 | Ground Level (A200_P7) | 276.00 | m2 | 0.00 | |||||||||||||||||||||||
38 | Vertical membrane; applied on shower wall | ||||||||||||||||||||||||||
39 | Ground Level (A200_P7) | 1,203.00 | m2 | 0.00 | |||||||||||||||||||||||
40 | Turn-ups less than or equal to 250mm high; including any angle fillet and dressing over fillets at bottom | ||||||||||||||||||||||||||
41 | Ground Level (A200_P7) | 495.00 | m | 0.00 | |||||||||||||||||||||||
42 | PLASTERING & RENDERING | ||||||||||||||||||||||||||
43 | GENERALLY | ||||||||||||||||||||||||||
44 | 23/1A | Tenderers are referred to the Specification for the full particulars of workmanship and materials and the quantities herein provided shall be read in conjunction with the drawings | Note | 0.00 | |||||||||||||||||||||||
45 | 23/1B | This Builders Bill of Quantities has not been measured in accordance with the Australian Standard Method of Measurement of Building Works, 5th Edition | Note | 0.00 | |||||||||||||||||||||||
46 | REFERENCES | ||||||||||||||||||||||||||
47 | Refer to following sections of IRT Marco Polo "Architectural Specification" Revision P1 dated 06 June 2025 by Edmiston Jones: 0331 - Brick construction, 0671 - Painting | Note | 0.00 | ||||||||||||||||||||||||
48 | Refer to following architectural drawing series: A200 for "Floor Plans", A600 for "Elevations & Sections", A805 for "Wall Types Details" | Note | 0.00 | ||||||||||||||||||||||||
49 | Refer to IRT Marco Polo "Materials & Finishes Schedule" Revision E dated 13 June 2025 by I&D Studio | Note | 0.00 | ||||||||||||||||||||||||
50 | PRICES | ||||||||||||||||||||||||||
51 | Prices shall include for: | ||||||||||||||||||||||||||
52 | 26/1C | Cutting including raking and circular cutting and waste | Note | 0.00 | |||||||||||||||||||||||
53 | 26/1D | Making good around pipes and the like | Note | 0.00 | |||||||||||||||||||||||
54 | 26/1E | Environmental and sustainable requirements detailed in the Tender documents (if any) | Note | 0.00 | |||||||||||||||||||||||
55 | GENERAL ITEMS | ||||||||||||||||||||||||||
56 | 23/1G | Allow for giving notice of and providing facilities for inspection | 1.00 | Item | 0.00 | ||||||||||||||||||||||
57 | 23/1H | Allow for co-operating with, attending on and making good after all other trades as necessary | 1.00 | Item | 0.00 | ||||||||||||||||||||||
58 | 23/1J | Allow for covering and protecting surfaces from weather and building operations | 1.00 | Item | 0.00 | ||||||||||||||||||||||
59 | 23/1K | Allow for cleaning on completion | 1.00 | Item | 0.00 | ||||||||||||||||||||||
60 | 23/1L | Allow for compliance with quality assurance requirements | 1.00 | Item | 0.00 | ||||||||||||||||||||||
61 | 23/1M | Allow for data submissions | 1.00 | Item | 0.00 | ||||||||||||||||||||||
62 | 23/1N | Allow for warranties | 1.00 | Item | 0.00 | ||||||||||||||||||||||
63 | 23/1P | Allow for contractor's submissions | 1.00 | Item | 0.00 | ||||||||||||||||||||||
64 | RENDER TO EXTERNAL WALLS | ||||||||||||||||||||||||||
65 | Rendered to brickworks | ||||||||||||||||||||||||||
66 | Ground Level (A200-P7) | 911.00 | m2 | 0.00 | |||||||||||||||||||||||
67 | Roof Level (A203-P6) | 13.00 | m2 | 0.00 | |||||||||||||||||||||||
68 | RENDER TO INTERNAL WALLS | ||||||||||||||||||||||||||
69 | 10mm render to existing brick walls of W03, W03a, W03b and new brick walls of W03c (NB: Refer detail to A805-P5) | ||||||||||||||||||||||||||
70 | Ground Floor (A201-P6 to A202-P6) | 170.00 | m2 | 0.00 | |||||||||||||||||||||||
71 | TILING | ||||||||||||||||||||||||||
72 | GENERALLY | ||||||||||||||||||||||||||
73 | 19/1A | Tenderers are referred to the Specification for the full particulars of workmanship and materials, and the quantities herein provided shall be read in conjunction with the drawings | Note | 0.00 | |||||||||||||||||||||||
74 | 19/1B | This Builders Bill of Quantities has not been measured in accordance with the Australian Standard Method of Measurement of Building Works, 5th Edition | Note | 0.00 | |||||||||||||||||||||||
75 | REFERENCE | ||||||||||||||||||||||||||
76 | Refer to following architectural drawing series: A200 for "Floor Plans" | Note | 0.00 | ||||||||||||||||||||||||
77 | Refer to IRT Marco Polo "Floor Finishes - Ground Floor Plan 01" ID110 Revision 3 dated 15 June 2025 by I&D Studio | Note | 0.00 | ||||||||||||||||||||||||
78 | Refer to IRT Marco Polo "Floor Finishes - Ground Floor Plan 02" ID111 Revision 3 dated 15 June 2025 by I&D Studio | Note | 0.00 | ||||||||||||||||||||||||
79 | Refer to IRT Marco Polo "Materials & Finishes Schedule" Revision E dated 13 June 2025 by I&D Studio | Note | 0.00 | ||||||||||||||||||||||||
80 | PRICES | ||||||||||||||||||||||||||
81 | Prices shall include for: | ||||||||||||||||||||||||||
82 | 19/1C | Temporary rules, temporary grounds, temporary screeds and the like | Note | 0.00 | |||||||||||||||||||||||
83 | 19/1D | Cutting and making good around pipes, sanitary fittings, floor wastes and the like | Note | 0.00 | |||||||||||||||||||||||
84 | 19/1E | All normal bedding and pointing materials, adhesives and the like | Note | 0.00 | |||||||||||||||||||||||
85 | 19/1F | Standard glazed edge tiles | Note | 0.00 | |||||||||||||||||||||||
86 | 19/1G | Salient and re-entrant corners including trims if required by the documents | Note | 0.00 | |||||||||||||||||||||||
87 | 19/1H | Environmental and sustainable requirements detailed in the Tender documents (if any) | Note | 0.00 | |||||||||||||||||||||||
88 | GENERAL ITEMS | ||||||||||||||||||||||||||
89 | 19/1J | Allow for attending on and making good after all other trades, cutting out and making good defective work | Item | 0.00 | |||||||||||||||||||||||
90 | 19/1K | Allow for covering and protecting surfaces from weather and building operations | Item | 0.00 | |||||||||||||||||||||||
91 | 19/1L | Allow for contractor's submissions | Item | 0.00 | |||||||||||||||||||||||
92 | 19/1M | Allow for laying sample panel | Item | 0.00 | |||||||||||||||||||||||
93 | 19/2A | Allow for submitting samples | Item | 0.00 | |||||||||||||||||||||||
94 | 19/2B | Allow for cleaning and polishing on completion | Item | 0.00 | |||||||||||||||||||||||
95 | 19/2C | Allow for grouted and caulked joints | Item | 0.00 | |||||||||||||||||||||||
96 | 19/2D | Allow for spare tiles | Item | 0.00 | |||||||||||||||||||||||
97 | 19/2E | Allow for preparation of substrate | Item | 0.00 | |||||||||||||||||||||||
98 | 19/2F | Allow for warranties | Item | 0.00 | |||||||||||||||||||||||
99 | NOTES AND ASSUMPTIONS | ||||||||||||||||||||||||||
100 | Note: Unknown FE Demarcation for Scullery, Kitchen, Temp Room 1-3, Ironing, TBC, Chef Ma., Pantry, PG Holding Bay, Laundry Area, Area Beyond Door Link To Cordeaux Louge, and ELEC DB. Assumption: Floor Tiles Finishes on the above Areas. | Note | 0.00 |