| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Checklist for Contribution of a SPECIFICATION (Rev A, Dec 2016) | Date | Notes | Who added the notes | |||||||||||||||||||
2 | CONTRIBUTION NAME | Facebook - Yosemite V2 Spec (next gen Single Socket platform) and Twin Lakes spec (next gen Single Socket card) | PROJECT: | SERVERS | 20-Jan-17 | Created Checklist. | akgraner | ||||||||||||||||
3 | CONTRIBUTING MEMBER/COMPANY | TYPE: | SPECIFICATION | 20-Jan-17 | Sent to John, Siamak, Bob Ogrey and Facebook Team | akgraner | |||||||||||||||||
4 | ADDRESS | 1 Hacker Way | CATEGORY: | OPENRACK SERVER | 2-Feb-2017 | Verified Membership | MS | ||||||||||||||||
5 | CITY, STATE ZIP | Menlo Park, CA 94025 | License: | OCPHL-P | 3/1/17 | added links, verified checklist | bc | ||||||||||||||||
6 | COMPANY CONTACT: | Yan Zhao | |||||||||||||||||||||
7 | Contact Email: | zhaoyan@fb.com | CURRENT STATUS: | ACCEPTED | |||||||||||||||||||
8 | |||||||||||||||||||||||
9 | LICENSE & MEMBERSHIP REQUIREMENT (Foundation to fill out this section) | LINK TO FILES | Foundation Approval | IC/PL Approval | |||||||||||||||||||
10 | REQUIRED | The Submitter must be a Member of OCP in good standing and has executed the Contributor License Agreement and the Copyright License Agreement | Member in good standing. http://files.opencompute.org/oc/public.php?service=files&t=3d39cf1f7243f14c31c075b03e49bcc8 http://files.opencompute.org/oc/public.php?service=files&t=d9e6a68cfddcaff22e312a065d27d631 | Confirmed: MS | |||||||||||||||||||
11 | PROJECT REVIEW- Submitted has demonstrated ALL of the following: | Action Required (contributor can add comment and description here) | Foundation Approval | IC/PL Approval | |||||||||||||||||||
12 | REQUIRED | The project lead has reviewed the specification and sufficient review(s) with the project | We are in process to submit the Yosemite V2 spec and Twin Lakes spec. | Approved:BC | |||||||||||||||||||
13 | REQUIRED | a) There must be contributor(s) that will submit a Product and ORDERABLE SKU that will meet all criteria in the specification. | As of submittal, SKU number is not available. Quanta and Wiwynn are the manufacturers. The MP date for the design at the moment is scheduled to be Q3 2018. Will provide more details later. | Approved:BC | |||||||||||||||||||
14 | REQUIRED | b) That product in (a) above, which adheres to the Specification, shall be capable of meeting at least THREE tenets on the OCP Principles list. | Yosemite V2 is next generation single socket server platform that can host 4 1S servers or 2x 1S Server/Device pairs. Twin Lakes is the newest 1S server based on Intel Xeon Process D SoC. This new platform is flexible to handle different configurations by the BMC and BIOS without any external interaction. It is a power efficient and cost efficient design that meets Facebook's strict data center requirment on PUE. We designed Yosemite V2 platform and Twin Lakes server with scale in mind. We will contribute design related files when they are ready. | Approved:BC | |||||||||||||||||||
15 | REQUIRED | c) That Product and it's ORDERABLE SKU(s) in (a) must be contributed as either OCP Inspired™ or OCP Accepted™ , 2) will be available within a reasonable timeframe after release of the specification, and 3) will be available for purchase by any member company. | a) At this point we contribute specifications as a start. Will provide more documents like schematics and design information on a later date. b) MP product will be available Q3 of 2018 c) Available to purchase from Quanta and Wiwynn as an Orderable SKU number | Approved:BC | |||||||||||||||||||
16 | REQUIRED | d) The Foundation’s Incubation committee has voted to accept the Specification and all submission checklists, licenses, and membership requirements have been met. | Approved:BC | ||||||||||||||||||||
17 | CONFORMS TO OCP PRINCIPALS (MUST MEET MINIMUM of THREE CRITERIA). The contributor shall provide engineering evidence that the product meets the tenets and the specification criteria. | Action Required (contributor can add comment and description here) | Foundation Approval | IC/PL Approval | |||||||||||||||||||
18 | COMPLETED | 1. Efficiency – A key OCP tenant is efficient design. Aspects that can be considered include (but aren’t limited to) power delivery and conversion, thermal efficiency, platform performance (per-W for example), reducing overall infrastructure costs, reducing code weight, reducing latencies and more. | Yosemite V2 and Twin Lakes designs are very power efficient and cost efficient. It will provide even better performance comparing with Yosemite and Mono Lake designs. It will reduce overall infrastructure costs with the higher performance. | Approved:BC | |||||||||||||||||||
19 | COMPLETED | 2. Scale – OCP contributions must be scale-out ready. This means that the technology is designed with the right supporting features to allow for its maintenance in large scale deployments. This includes physical maintenance, remote management, upgradability, error reporting and appropriate documentation. Management tools should strive to adhere to the guideline provided by the OCP Hardware Management Project. Documentation should enable adopters towards a successful deployment, providing guidance on equipment installation, turn on and configuration, as well as physical and remote service. | Yosemite as first Gen 1S server platform is already deployed in Facebook at scale. As the new generation, Yosemite V2 follows the same design pricipals and we kept scale in mind when we started the design. Yosemite V2 provided even better servicebility with hot-service which reduced failire domain dramatically. This platform requires low maintanance and has rich server management features build-in. | Approved:BC | |||||||||||||||||||
20 | COMPLETED | 3. Openness – OCP encourages as much open source contribution as possible, but understands that in certain cases 100% open source contriution may not be possible. Whether fully open source or not, a contribution should strive to comply with a set of already existing open interfaces, at the very least provide one. Providing a solution compatible with already existing OCP contributions is one way to implement existing (open) interfaces. | We are contributing Yosemite V2 spec and Twin Lakes spec at this moment. And will provide full set of design files when we move to MP stage. | Approved:BC | |||||||||||||||||||
21 | COMPLETED | 4. Impact – New OCP contributions must create meaningful positive impact within the OCP ecosystem. This can be attained by introducing efficiency gains, introducing new technologies and products that are valuable for scale out computing, creating a multiplier effect by building on top of already existing OCP solutions, and enabling a more robust supply chain by contributing alternative compatible solutions. | Yosemite V2 and Twin Lakes design shows our continuous support on Single Socket server design which is cost efficient and power efficient with great performance gain. | Approved:BC | |||||||||||||||||||
22 | COMPATIBILITY & INTEROPERABILITY INFORMATION | LINK TO FILES | Foundation Approval | IC/PL Approval | |||||||||||||||||||
23 | OPTIONAL | File name of uploaded file | Link to additional Supporting Files | ||||||||||||||||||||
24 | OPTIONAL | File name of uploaded file | Link to additional Supporting Files | ||||||||||||||||||||
25 | OPTIONAL | File name of uploaded file | Link to additional Supporting Files | ||||||||||||||||||||
26 | OPTIONAL | File name of uploaded file | Link to additional Supporting Files | ||||||||||||||||||||
27 | |||||||||||||||||||||||
28 | Link to Supporting Documentation and files (Presentation, designs, etc) | LINK TO FILES | Foundation Approval | IC/PL Approval | |||||||||||||||||||
29 | OPTIONAL | Twin Peaks spec | http://files.opencompute.org/oc/public.php?service=files&t=07a8f32bda9e2090cf37186beead80a6 | Approved:BC | |||||||||||||||||||
30 | OPTIONAL | Yosemite v2 spec | http://files.opencompute.org/oc/public.php?service=files&t=837133ef9167e70d79ba57450eccb826 | Approved:BC | |||||||||||||||||||
31 | OPTIONAL | File name of uploaded file | Link to additional Supporting Files | ||||||||||||||||||||
32 | OPTIONAL | File name of uploaded file | Link to additional Supporting Files | ||||||||||||||||||||
33 | |||||||||||||||||||||||
34 | |||||||||||||||||||||||
35 | |||||||||||||||||||||||
36 | |||||||||||||||||||||||
37 | |||||||||||||||||||||||
38 | |||||||||||||||||||||||
39 | |||||||||||||||||||||||
40 | |||||||||||||||||||||||
41 | |||||||||||||||||||||||
42 | |||||||||||||||||||||||
43 | |||||||||||||||||||||||
44 | |||||||||||||||||||||||
45 | |||||||||||||||||||||||
46 | |||||||||||||||||||||||
47 | |||||||||||||||||||||||
48 | |||||||||||||||||||||||
49 | |||||||||||||||||||||||
50 | |||||||||||||||||||||||
51 | |||||||||||||||||||||||
52 | |||||||||||||||||||||||
53 | |||||||||||||||||||||||
54 | |||||||||||||||||||||||
55 | |||||||||||||||||||||||
56 | |||||||||||||||||||||||
57 | |||||||||||||||||||||||
58 | |||||||||||||||||||||||
59 | |||||||||||||||||||||||
60 | |||||||||||||||||||||||
61 | |||||||||||||||||||||||
62 | |||||||||||||||||||||||
63 | |||||||||||||||||||||||
64 | |||||||||||||||||||||||
65 | |||||||||||||||||||||||
66 | |||||||||||||||||||||||
67 | |||||||||||||||||||||||
68 | |||||||||||||||||||||||
69 | |||||||||||||||||||||||
70 | |||||||||||||||||||||||
71 | |||||||||||||||||||||||
72 | |||||||||||||||||||||||
73 | |||||||||||||||||||||||
74 | |||||||||||||||||||||||
75 | |||||||||||||||||||||||
76 | |||||||||||||||||||||||
77 | |||||||||||||||||||||||
78 | |||||||||||||||||||||||
79 | |||||||||||||||||||||||
80 | |||||||||||||||||||||||
81 | |||||||||||||||||||||||
82 | |||||||||||||||||||||||
83 | |||||||||||||||||||||||
84 | |||||||||||||||||||||||
85 | |||||||||||||||||||||||
86 | |||||||||||||||||||||||
87 | |||||||||||||||||||||||
88 | |||||||||||||||||||||||
89 | |||||||||||||||||||||||
90 | |||||||||||||||||||||||
91 | |||||||||||||||||||||||
92 | |||||||||||||||||||||||
93 | |||||||||||||||||||||||
94 | |||||||||||||||||||||||
95 | |||||||||||||||||||||||
96 | |||||||||||||||||||||||
97 | |||||||||||||||||||||||
98 | |||||||||||||||||||||||
99 | |||||||||||||||||||||||
100 | |||||||||||||||||||||||