ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
Conversion of Double Shift into single shift (Distt. South)
2
S.No.Name of First Shift schoolSchool IDName of Second Shift SchoolSchool IDFeasibility of conversion of Double shift into single shiftWhether the file has been submitted to competent Authority (Y/N)If not please specify the reason.
3
1Dr. Ambedkar Nagar, Sector IV, No.1- SBV (Yogi Arvind)1923005Dr. Ambedkar Nagar, Sector IV, No.2- SBV1923393NONA
4
2Dr. Ambedkar Nagar, Sector IV, No.1-GGSSS1923044Dr. Ambedkar Nagar, Sector IV, No.1-GBSSS1923008Yes w.e.f. 2020-21YES
5
3Dr. Ambedkar Nagar, Sector IV, No.2-GGSSS1923045Dr. Ambedkar Nagar, Sector IV, No.2-GBSSS1923009Yes w.e.f. 2020-21YES
6
4Dr. Ambedkar Nagar, Sector V-GGSSS1923047Dr. Ambedkar Nagar, Sector V-GBSSS (Shaheed Anushuya Prasad)1923011NONA
7
5Chirag Delhi-SKV1923037Chirag Delhi-GBSSS1923012Yes w.e.f. 2020-21YES
8
6Begumpur, MMTC/STC Colony-SKV1923057Begumpur-GBSSS1923013Yes w.e.f. 2021-22YES
9
7Dr. Ambedkar Nagar, Sector V, No.1-GGSS1923078Dr. Ambedkar Nagar, Sector V, No.1-GBSS1923016NONA
10
8Dr. Ambedkar Nagar, Tigri- GGSSS1923080Dr. Ambedkar Nagar,Sector-1, Tigri- GBSSS1923017Yes w.e.f. 2021-22YES
11
9Hauz Rani-Sr.Sec.SKV (Raja RamMohan Roy)1923041Hauz Rani-GBSSS1923021NONA
12
10Ishani Govt. Sarvodaya Kanya Vidyalaya G-BLOCK SAKET1923036Saket, Block G-GBSSS1923068NONA
13
11Dr. Ambedkar Nagar, Sector V, No.2-GGSSS1923050Dr. Ambedkar Nagar, Sector V, No.3-GBSSS1923066NONA
14
12Pushp Vihar, M.B.Road-GGSSS1923055Pushp Vihar, M.B.Road-GBSSS1923058NONA
15
13Dr. Ambedkar Nagar, Sector IV, No.3-GGSSS1923060Dr. Ambedkar Nagar, Sector IV, No.3-GBSSS1923065Yes w.e.f. 2020-21YES
16
14VASANT KUNJ- GGSSS1720026VASANT KUNJ- GBSSS1720173Not feasable because three schools running in the same building two in morning shift and one in evening shift. Acute shortage of rooms in GGSSS B-1 Vasant Kunj No Not Feasable
17
15Jonapur- Baba Neem Karoli, SKV1923003Jonapur - SBV1923359NONOTwo separate buildings are under construction for both the schools.
18
16Mehrauli, No.2- SKV1923079Mehrauli, No.2-GBSSS1923015NoYesShortage of class rooms, old building and enrollemnet of muslim students.
19
17Deoli-SKV (Bachhan Prasad)1923042Deoli-GBSSS1923018Not FeasibleNoThe Building has not sufficient rooms and space to accomadate more than 3200 students of afternoon shift and more than 3800 students of morning shift.
20
18Sangam Vihar-GGSSS1923052Sangam Vihar-GBSSS1923027NONODUE TO SHORTAGE OF ROOMS AND HUGE NUMBER OF STRENGTH. STRENGTH (GIRLS:- 5284 BOYS:- 2940)
21
19Sultanpur-SKV1923061Sultanpur-GBSSS1923355NoNospace is not available
22
20Khanpur-SKV (Hakikat Rai)1923062Khanpur, No.2-GBSS1923069Not Possible NoBuilding under Priority II work not started
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100