A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | ||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | City | Intersection | State | Status | Year completed (or, to be built) | On Street or Sidewalk level | Intersection treatments (other than a striped bike lane, pedestrian crosswalk, stop sign or ordinary signalization) | Photo | This info last updated… | References | Street view | photo Link | Notes | |||||||||
2 | Berkeley | The Alameda/Hopkins | CA | built | 2016 | Street | #REF! | Dec 2016 | https://bikeeastbay.org/news/clever-design-brings-protected-intersection-berkeley | |||||||||||||
3 | Davis | Covell Boulevard and J Street | CA | built | 2015 | Street | Oct 2015 | http://www.peopleforbikes.org/blog/entry/four-u.s.-cities-are-racing-to-open-the-countrys-first-protected-intersecti | ||||||||||||||
4 | Fremont | Walnut Ave and Paseo Padre Parkway | CA | Construction | 2020? | Nov 2020 | http://www.fremont.gov/WalnutBikeway | |||||||||||||||
5 | Fremont | Walnut Ave and Civic Center Dr | CA | Construction | 2020? | Nov 2020 | http://www.fremont.gov/WalnutBikeway | |||||||||||||||
6 | Fremont | Walnut Ave and Guardino Dr | CA | built | 2019 | Nov 2020 | http://www.fremont.gov/WalnutBikeway | |||||||||||||||
7 | Fremont | Walnut Ave and Gallaudet Dr | CA | built | 2019 | Nov 2020 | http://www.fremont.gov/WalnutBikeway | |||||||||||||||
8 | Fremont | Cushing Pkwy and Northport Loop W | CA | built | 2019 | Flexposts & paint only | Nov 2020 | |||||||||||||||
9 | Fremont | Cushing Pkwy and Northport Loop E | CA | built | 2019 | Flexposts & paint only | Nov 2020 | |||||||||||||||
10 | Oakland | Lakeside Dr at Harrison St | CA | built | 2019 | Nov 2020 | ||||||||||||||||
11 | Pleasanton | Valley Av and Stanley Boulevard | CA | built | 2017 | Street | #REF! | Aug 2017 | https://twitter.com/PlacesForBikes/status/894967882118909952 | https://pbs.twimg.com/media/DGuP6RbUwAEOonh.jpg | ||||||||||||
12 | Richmond | Central Ave at Rydin Rd | CA | built? | 2019? | |||||||||||||||||
13 | Richmond | Tewksbury at Castro | CA | built | 2019 | |||||||||||||||||
14 | San Francisco | 9th St at Division St | CA | built | 2016 | Street | #REF! | Dec 2016 | http://www.sfbike.org/news/san-franciscos-first-protected-intersection-elevates-street-design-for-biking-and-walking/ | |||||||||||||
15 | Palo Alto | Embarcadero Rd & Middlefield Rd | CA | built | ||||||||||||||||||
16 | San José | St. John St & North 10th St | CA | built | Flexposts & paint | |||||||||||||||||
17 | San José | W San Fernando St & S Almaden Blvd | CA | built | 2018 | |||||||||||||||||
18 | San José | E San Fernando St & S Third St | CA | built | 2019 | |||||||||||||||||
19 | Atlanta | Peachtree Center Av & John Portman Bl | GA | built | 2016 | Street | First intersection of two bidirectionals. Both are on one-way streets. Design uses a corner safety island with a relatively sharp "bend out" for people biking. | #REF! | Dec 2016 | http://www.peopleforbikes.org/blog/entry/a-milestone-in-atlanta-two-bidirectional-protected-bike-lanes-intersect | ||||||||||||
20 | Chicago | Washington and Franklin | IL | built | 2016 | Street | they’re installing special concrete curbs and islands in an effort to shield cyclists from turning vehicles. | Oct 2016 | http://chi.streetsblog.org/2015/12/01/cdot-pilots-bike-lane-treatment-inspired-by-dutch-protected-intersections/ | |||||||||||||
21 | Chicago | Washington/Dearborn | IL | built | 2016 | Street | Nov 2016 | http://chi.streetsblog.org/2016/10/18/take-a-virtual-ride-on-the-new-randolph-protected-bike-lane/ | ||||||||||||||
22 | Chicago | Randolph/Dearborn | IL | built | 2016 | Street | Nov 2016 | http://chi.streetsblog.org/2016/10/18/take-a-virtual-ride-on-the-new-randolph-protected-bike-lane/ | ||||||||||||||
23 | Chicago | Randolph/Canal | IL | built | 2016 | Street | Nov 2016 | http://chi.streetsblog.org/2016/10/18/take-a-virtual-ride-on-the-new-randolph-protected-bike-lane/ | ||||||||||||||
24 | ||||||||||||||||||||||
25 | ||||||||||||||||||||||
26 | ||||||||||||||||||||||
27 | ||||||||||||||||||||||
28 | Boston | Arborway & Washington St | MA | built | ||||||||||||||||||
29 | Boston | Commercial St & Battery St | MA | built | ||||||||||||||||||
30 | Boston | Commercial St & Hanover St | MA | built | ||||||||||||||||||
31 | Silver Spring | Second Ave at Spring St | MD | built | 2019 | |||||||||||||||||
32 | Jersey City | Grove and Grand St | NJ | built | 2020 | Street | Feb 2020 | https://www.streetfilms.org/jersey-citys-quick-build-bike-network/ | ||||||||||||||
33 | New York | 4th Av & 13th St | NY | built | ? | Flexposts & paint | ||||||||||||||||
34 | Pottstown | Beech, Roland and Jackson Streets | PA | built | 2019 | Street | The protected network is done with “flex posts,” in both bike lanes on Jackson and Roland and the intersection has a concrete curb | #REF! | Apr 2021 | https://bicyclecoalition.org/behold-the-protected-bike-infrastructure-of-pottstown/ | https://www.google.com/maps/@40.2464619,-75.6201755,3a,60y,277.78h,79.36t/data=!3m6!1e1!3m4!1sDmEiAD-2iSE-1ACnFeTn5A!2e0!7i13312!8i6656 | |||||||||||
35 | Memphis | MLK Av & Walnut St | TN | built | 2019 | Flexposts & paint | ||||||||||||||||
36 | Austin | Manor Road and Tilley Street | TX | built | 2014 | Street | Chevrons as Intersection markings through intersections | #REF! | Oct 2015 | http://www.peopleforbikes.org/blog/entry/four-u.s.-cities-are-racing-to-open-the-countrys-first-protected-intersecti | https://drive.google.com/open?id=0B1-hAIvr5hs8eWRoOURVS2o0VzQ | |||||||||||
37 | Austin | Tilley Street and Zach Scott Street | TX | built | 2015 | Street | Chevrons as Intersection markings through intersections | Oct 2015 | http://www.peopleforbikes.org/blog/entry/four-u.s.-cities-are-racing-to-open-the-countrys-first-protected-intersecti | |||||||||||||
38 | College Station | Bizzell and Ross | TX | built | 2016 | Street | Dutch-Style Unsignalized Intersection with Solar Luminescent Green ‘Paint’ Bicycle Pathways | #REF! | Oct 2016 | https://tti.tamu.edu/2016/10/04/solar-bicycle-pathways/ | ||||||||||||
39 | Salt Lake City | 300 South and 200 West | UT | built | 2015 | Street | Elephant tracks | #REF! | Oct 2015 | http://www.good4utah.com/news/local-news/biketober-fest-what-is-a-protected-intersection | https://drive.google.com/open?id=0B1-hAIvr5hs8dXNSdG5ON014MHM | |||||||||||
40 | Salt Lake City | 300 East & 700 South | UT | built | 2019 | Street | Apr 2021 | https://youtu.be/9Z7ouWAR-R8 | ||||||||||||||
41 | ||||||||||||||||||||||
42 | ||||||||||||||||||||||
43 | ||||||||||||||||||||||
44 | ||||||||||||||||||||||
45 | ||||||||||||||||||||||
46 | ||||||||||||||||||||||
47 | ||||||||||||||||||||||
48 | ||||||||||||||||||||||
49 | ||||||||||||||||||||||
50 | ||||||||||||||||||||||
51 | ||||||||||||||||||||||
52 | ||||||||||||||||||||||
53 | ||||||||||||||||||||||
54 | ||||||||||||||||||||||
55 | ||||||||||||||||||||||
56 | ||||||||||||||||||||||
57 | ||||||||||||||||||||||
58 | ||||||||||||||||||||||
59 | ||||||||||||||||||||||
60 | ||||||||||||||||||||||
61 | ||||||||||||||||||||||
62 | ||||||||||||||||||||||
63 | ||||||||||||||||||||||
64 | ||||||||||||||||||||||
65 | ||||||||||||||||||||||
66 | ||||||||||||||||||||||
67 | ||||||||||||||||||||||
68 | ||||||||||||||||||||||
69 | ||||||||||||||||||||||
70 | ||||||||||||||||||||||
71 | ||||||||||||||||||||||
72 | ||||||||||||||||||||||
73 | ||||||||||||||||||||||
74 | ||||||||||||||||||||||
75 | ||||||||||||||||||||||
76 | ||||||||||||||||||||||
77 | ||||||||||||||||||||||
78 | ||||||||||||||||||||||
79 | ||||||||||||||||||||||
80 | ||||||||||||||||||||||
81 | ||||||||||||||||||||||
82 | ||||||||||||||||||||||
83 | ||||||||||||||||||||||
84 | ||||||||||||||||||||||
85 | ||||||||||||||||||||||
86 | ||||||||||||||||||||||
87 | ||||||||||||||||||||||
88 | ||||||||||||||||||||||
89 | ||||||||||||||||||||||
90 | ||||||||||||||||||||||
91 | ||||||||||||||||||||||
92 | ||||||||||||||||||||||
93 | ||||||||||||||||||||||
94 | ||||||||||||||||||||||
95 | ||||||||||||||||||||||
96 | ||||||||||||||||||||||
97 | ||||||||||||||||||||||
98 | ||||||||||||||||||||||
99 | ||||||||||||||||||||||
100 |