1 | FDP Form 10a - Bid Results on Civil Works | 3 Forms to Use: | ||||||||||||||||||||||||
2 | 1. Bid Results on Civil Works | |||||||||||||||||||||||||
3 | 2. Bid Results on Goods and Services | |||||||||||||||||||||||||
4 | 3. Bid Results on Consulting Services | |||||||||||||||||||||||||
5 | INDIVIDUAL BID-OUTS ARE NOT ALLOWED | |||||||||||||||||||||||||
6 | Republic of the Philippines | |||||||||||||||||||||||||
7 | CIVIL WORKS BID-OUT | |||||||||||||||||||||||||
8 | Province, City or Municipality: Antipolo City | |||||||||||||||||||||||||
9 | 3rd Quarter, CY 2021 | |||||||||||||||||||||||||
10 | ||||||||||||||||||||||||||
11 | No. | Reference No. | Name of Project | Approved Budget for Contract | Location | Winning Bidder | Name and Address | Bid Amount | Bidding Date | Contract Duration | ||||||||||||||||
12 | ||||||||||||||||||||||||||
13 | 1 | ANTIPOLO-21JULY2021-01 | Construction of Wash Facilities Structure at Various Schools, Brgy. Bagong Nayon, and Brgy. San Isidro, Antipolo City ( 2021 - Package 71 ) a. Construction of Wash Facilities Structure at Bagong Nayon I Elementary School, Brgy. Bagong Nayon I, Antipolo City b. Construction of Wash Facilities Structure at Bagong Nayon II Elementary School, Brgy. San Isidro, Antipolo City c. Construction of Wash Facilities Structure at Bagong Nayon II National High School - Main, Brgy. San Isidro, Antipolo City | a. P 358,593.88 b. P 400,000.00 c. P 331,614.28 --------------- P 1,090,208.16 | Brgy. Bagong Nayon, and Brgy. San Isidro, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangonan, Rizal | a. 353,593.88 b. 395,000.00 c. 326,614.28 ---------------- 1,075,208.16 | July 21, 2021 | 150 | ||||||||||||||||
14 | 2 | ANTIPOLO-21JULY2021-02 | Construction of Three (3) Storey, Nine (9) Classrooms Ynares School Building at Old Boso-Boso Elementary School, Sitio Boso-Boso, Brgy. San Jose, Antipolo City | P 17,000,000.00 | Sitio Boso-Boso, Brgy. San Jose, Antipolo City | FLAG CONSTRUCTION CORPORATION | Fernando L. Arada Binangonan, Rizal | 16,970,000.00 | July 21, 2021 | 360 | ||||||||||||||||
15 | 3 | ANTIPOLO-21JULY2021-03 | Construction of Four (4) Storey Eight (8) Classrooms Ynares School Building at Bagong Nayon I Elementary School, Brgy. Bagong Nayon, Antipolo City | P 20,610,000.00 | Brgy. Bagong Nayon, Antipolo City | JRD-D2 ENTERPRISES | Porfirio P. Mina Tanay, Rizal | 20,570,000.00 | July 21, 2021 | 360 | ||||||||||||||||
16 | 4 | ANTIPOLO-21JULY2021-04 | Construction Four (4) Storey, Twelve (12) Classrooms Ynares School Building at Dela Paz Elementary School, Brgy. Dela Paz, Antipolo City | P 32,976,000.00 | Brgy. Dela Paz, Antipolo City | SAN RAFAEL BUILDERS | Ma. Loida C. Nocon Rodriguez, Rizal | 32,930,000.00 | July 21, 2021 | 540 | ||||||||||||||||
17 | 5 | ANTIPOLO-21JULY2021-05 | Asphalt Overlaying of Various Roads at Brgy. Mayamot, Antipolo City ( 2021 - Package 72 ) a. Asphalt Overlaying (Portion) of Eisenhower Dr., Broadway Pines Exec. Village Brgy. Mayamot, Antipolo City b. Asphalt Overlaying (Portion) of Johnson Dr., Broadway Pines Exec. Village, Brgy. Mayamot, Antipolo City c. Asphalt Overlaying of Jackson Dr., Broadway Pines Exec. Village, Brgy. Mayamot, Antipolo City d. Asphalt Overlaying (Portion) of Jefferson Dr., Broadway Pines Exec. Village, Brgy. Mayamot, Antipolo City | a. P 625,128.18 b. P 427,345.18 c. P 535,826.61 d. P 1,091,131.25 ------------------ P 2,679,431.22 | Brgy. Mayamot, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | a. 621,455.53 b. 424,763.43 c. 532,746.46 d. 1,085,434.58 ----------------- 2,664,400.00 | July 21, 2021 | 60 | ||||||||||||||||
18 | 6 | ANTIPOLO-21JULY2021-06 | Asphalt Overlaying (Portion) of M.L. Quezon Street (From J. Sumulong St. To Circumferential Road), Brgy. San Roque, Antipolo City | P 4,703,661.08 | Brgy. San Roque, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | 4,688,600.00 | July 21, 2021 | 60 | ||||||||||||||||
19 | 7 | ANTIPOLO-21JULY2021-07 | Improvement of Covered Court and Construction of Wash Facilities at Brgy. San Jose and Brgy. San Juan, Antipolo City ( 2021 - Package 73 ) a. Improvement of 15x24m Covered Court at Old Boso-Boso Elementary School, Brgy. San Jose, Antipolo City b. Construction of Wash Facilities Structure at Old Boso-Boso Elementary School, Brgy. San Jose, Antipolo City c. Construction of Wash Facilities Structure at San Juan National High School, Brgy. San Juan, Antipolo City d. Improvement of 15 X 24m Covered Court at San Juan National High School, Brgy. San Juan, Antipolo City | a. P 769,179.78 b. P 202,307.66 c. P 306,805.18 d. P 287,577.41 ------------------ P 1,565,870.03 | Brgy. San Jose and Brgy. San Juan, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangona, Rizal | a. 763,530.67 b. 200,955.94 c. 304,921.24 d. 282,526.23 ------------------ 1,551,934.08 | July 21, 2021 | 150 | ||||||||||||||||
20 | 8 | ANTIPOLO-21JULY2021-08 | Improvement of 17.0m X 44.0m Covered Court at Bagong Nayon IV Elementary School, Brgy. San Isidro, Antipolo City | P 782,558.35 | Brgy. San Isidro, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangona, Rizal | 768,297.71 | July 21, 2021 | 120 | ||||||||||||||||
21 | 9 | ANTIPOLO-21JULY2021-09 | Construction of Wash Facilities Structure and Welcome Arch at Various Schools, Brgy. San Isidro, Brgy. Dalig and Brgy. Cupang, Antipolo City ( 2021 - Package 74 ) a. Construction of Wash Facilities Structure at Bagong Nayon IV Elementary School, Brgy. San Isidro, Antipolo City b. Construction of Wash Facilities Structure at San Antonio Village Elementary School, Brgy. Dalig, Antipolo City c. Construction of Welcome Arch at Cupang National High School, Brgy. Cupang, Antipolo City | a. P 354,616.20 b. P 303,680.48 c. P 209,770.16 ----------------- P 868,066.84 | Brgy. San Isidro, Brgy. Dalig and Brgy. Cupang, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangona, Rizal | a. 351,268.38 b. 300,202.11 c. 206,469.51 ---------------- 857,940.00 | July 21, 2021 | 120 | ||||||||||||||||
22 | 10 | ANTIPOLO-21JULY2021-10 | Improvement of Comfort Rooms and Construction of Wash Facilities at Various Schools, Brgy. San Jose, Antipolo City ( 2021 - Package 75 ) a. Improvement of Male Comfort Rooms at Maximo Gatlabayan Memorial National Highschool, Sitio Paenaan, Brgy. San Jose, Antipolo City b. Construction of Wash Facilities Structure at Rizza Elementary School, Brgy. San Jose, Antipolo City c. Construction of Wash Facilities Structure at Rizza National High School, Brgy. San Jose, Antipolo City d. Construction of Wash Facilities Structure at San Joseph Elementary School, Brgy. San Jose, Antipolo City e. Construction of Wash Facilities Structure at Canumay National High School, Brgy. San Jose, Antipolo City | a. P 200,000.00 b. P 199,728.28 c. P 168,182.48 d. P 310,314.30 e. P 319,964.26 ------------------ P 1,198,189.32 | Brgy. San Jose, Antipolo City | FAILURE OF BIDS | ||||||||||||||||||||
23 | 11 | ANTIPOLO-21JULY2021-11 | Construction of Drainage Canal at Sitio Kaysakat – 1 (Sta. 3+550 – 3+800), Brgy. San Jose, Antipolo City | P 2,012,315.88 | Brgy. San Jose, Antipolo City | 1C4M BUILDERS INC. | Meynard C. Kho Antipolo City | 1,998,791.34 | July 21, 2021 | 120 | ||||||||||||||||
24 | 12 | ANTIPOLO-21JULY2021-12 | Repair/ Repainting of School Buildings and Construction of Wash Facilities at Various Schools, Brgy. San Jose, Antipolo City ( 2021 - Package 76) a. Repair/ Repainting of Pathwalk at Marcelino M. Santos National High School at Sitio Tagbac, Brgy. San Jose, Antipolo City b. Repair / Repainting of Two Storey, Two Rooms Deped School Building At Maximo L. Gatlabayan Memorial National High School, Sitio Paenaan, Brgy. San Jose, Antipolo City c. Construction of Wash Facilities at Sumilang Elementary School, Brgy. San Jose, Anipolo City d. Construction of Wash Facilities Structure at Pantay Elementary School, Brgy. San Jose, Anipolo City e. Construction of Pavement Along Four Storey, Twenty Classroom Deped Bldg. at Marcelino M. Santos National High School at Sitio Tagbak, Brgy. San Jose, Antipolo City f. Repair/ Repainting of Agriculture Office at Sitio Manggahan, San Ysiro Barangay San Jose, Antipolo City | a. P 129,928.80 b. P 292,258.98 c. P 296,658.78 d. P 300,751.87 e. P 219,799.02 f. P 575,494.28 ------------------ P 1,814,891.73 | Brgy. San Jose, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangona, Rizal | a. 129,410.35 b. 291,121.85 c. 293,352.73 d. 297,024.58 e. 217,302.68 f. 573,587.58 ---------------- 1,801,799.77 | July 21, 2021 | 180 | ||||||||||||||||
25 | 13 | ANTIPOLO-21JULY2021-13 | Construction of Wash Facilities Structure at Various Schools, Brgy. Calawis and Improvement of Health Station, Brgy. San Roque, Antipolo City ( 2021 - Package 77 ) a. Construction of Wash Facilities Structure at Calawis National High School, Brgy. Calawis, Antipolo City b. Construction of Wash Facilities Structure at Calawis National High School Apia Extension, Brgy. Calawis, Antipolo City c. Construction of Wash Facilities Structure at Apia Elementary School, Brgy. Calawis, Antipolo City d. Improvement of Health Station at Cristimar Village, Brgy. San Roque, Antipolo City | a. P 313,127.50 b. P 169,429.16 c. P 171,894.88 d. P 506,792.56 ------------------ P 1,161,244.10 | Brgy. Calawis and Roque, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangona, Rizal | a. 309,627.50 b. 165,926.16 c. 168,394.88 d. 503,292.56 --------------- 1,147,241.10 | July 21, 2021 | 120 | ||||||||||||||||
26 | 14 | ANTIPOLO-21JULY2021-14 | Additional Improvement of Water System and Construction of Water Supply Line at Various Schools, Brgy. San Jose, Antipolo City ( 2021 - Package 78 ) a. Additional Improvement of Water System At Kaysakat National High School, Brgy. San Jose, Antipolo City b. Construction of Water Supply Line From Existing Water Line to School Building at Cabading Elementary School, Sitio Cabading, Brgy. San Jose, Antipolo City | a. P 1,246,907.45 b. P 92,667.01 ----------------- P 1,339,574.46 | Brgy. San Jose, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | a. 1,235,979.98 b. 90,644.24 ----------------- 1,326,624.22 | July 21, 2021 | 150 | ||||||||||||||||
27 | 15 | ANTIPOLO-21JULY2021-15 | Improvement of Water Distribution System at Mayamot Elementary School, Brgy. Mayamot, Antipolo City | P 2,595,946.74 | Brgy. Mayamot, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 2,582,900.00 | July 21, 2021 | 120 | ||||||||||||||||
28 | 16 | ANTIPOLO-21JULY2021-16 | Construction of Four (4) Storey, Twenty (20) Rooms Ynares School Building I at Cupang Elementary School, Brgy. Cupang, Antipolo City | P 49,464,000.00 | Brgy. Cupang, Antipolo City | PST CONSTRUCTION | Procopio S. Torres Jr. Antipolo City | 49,414,000.00 | July 21, 2021 | 600 | ||||||||||||||||
29 | 17 | ANTIPOLO-26AUGUST2021-01 | Construction of Drainage System at Our Lady of Lourdes Subdivision, Brgy. Cupang, Antipolo City | P 3,500,000.00 | Brgy. Cupang, Antipolo City | T. REYES CONSTRUCTION | Troadio L. Reyes Antipolo City | 3,487,991.84 | August 26, 2021 | 180 | ||||||||||||||||
30 | 18 | ANTIPOLO-26AUGUST2021-02 | Road Improvement (Portion) of Maya Ave., at Marville Subdivision, Brgy. San Roque, Antipolo City | P 3,600,000.00 | Brgy. San Roque, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 3,585,000.00 | August 26, 2021 | 180 | ||||||||||||||||
31 | 19 | ANTIPOLO-26AUGUST2021-03 | Construction of Drainage System and Wash Facilities Structure at Brgy. Cupang and Brgy. San Juan, Antipolo City ( 2021 - Package 79 ) a. Construction of Drainage System (Phase II)at Our Lady of Lourdes Subdivision, Brgy. Cupang, Antipolo City b. Construction of Wash Facilities Structure at Sapinit Elementary School, Brgy. San Juan, Antipolo City | a. P 2,500,000.00 b. P 317,588.63 ---------------------- P 2,817,588.63 | Brgy. Cupang and Brgy. San Juan, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangona, Rizal | a. 2,487,159.36 b. 316,145.28 ------------------ 2,803,304.64 | August 26, 2021 | 150 | ||||||||||||||||
32 | 20 | ANTIPOLO-26AUGUST2021-04 | Improvement/ Construction at Various Schools, Brgy. San Jose, Antipolo City ( 2021 - Package 80 ) a. Improvement of Perimeter Fence at Teofila Z. Rovero Memorial Elementary School, SitioHinapao, Brgy. San Jose, Antipolo City b. Construction of Shed Beside the Stage at Teofila Z. Rovero Memorial Elementary School, SitioHinapao, Brgy. San Jose, Antipolo City c. Construction of Wash Facilities Structure at Maximo L. Gatlabayan Memorial National High School, Brgy. San Jose, Antipolo City | a. P 598,886.19 b. P 297,482.43 c. P 274,813.95 --------------------- P 1,171,182.57 | Brgy. San Jose, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | a. 593,187.75 b. 293,004.06 c. 271,123.55 ----------------- 1,157,315.36 | August 26, 2021 | 150 | ||||||||||||||||
33 | 21 | ANTIPOLO-26AUGUST2021-05 | Road Improvement at Road Lot 1, Grand Tipolo Subdivision, Brgy. San Roque, Antipolo City | P 2,600,000.00 | Brgy. San Roque, Antipolo City | R.S.F CONSTRUCTION | Reynaldo F. Santiago Manila | 2,585,471.72 | August 26, 2021 | 120 | ||||||||||||||||
34 | 22 | ANTIPOLO-26AUGUST2021-06 | Construction of Wash Facilities Structure at Dalig National High School, Brgy. Dalig, Antipolo City | P 318,083.07 | Brgy. Dalig, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangona, Rizal | 313,000.00 | August 26, 2021 | 120 | ||||||||||||||||
35 | 23 | ANTIPOLO-26AUGUST2021-07 | Rewiring/ Improvement/ Construction at Various Schools, Brgy. Mayamot, Brgy. San Jose and Brgy. Cupang, Antipolo City ( 2021 - Package 81 ) a. Rewiring of Three (3) Storey Nine (9) Classroom Deped Building F at Mayamot Elementary School, Brgy. Mayamot, Antipolo City b. Improvement of Ynares Multipurpose Building at SitioKaysakat 1, Brgy. San Jose, Antipolo City c.Construction of Welcome Arch at Cupang Elementary School, Brgy. Cupang, Antipolo City | a. P 300,000.00 b. P 997,634.21 c. P 374,923.14 -------------------- P 1,672,557.35 | Brgy. Mayamot, Brgy. San Jose and Brgy. Cupang, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | a. 297,668.18 b. 989,879.86 c. 372,008.96 ---------------- 1,659,557.00 | August 26, 2021 | 150 | ||||||||||||||||
36 | 24 | ANTIPOLO-26AUGUST2021-08 | Construction of 1 - StoreyYnares Multi-Purpose Building at SitioTanza II, Brgy. San Jose, Antipolo City | P 2,726,108.69 | Brgy. San Jose, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 2,712,000.00 | August 26, 2021 | 210 | ||||||||||||||||
37 | 25 | ANTIPOLO-26AUGUST2021-09 | Road Improvement at Road Lot 9, Grand Tipolo Subdivision, Brgy. San Roque, Antipolo City | P 1,600,000.00 | Brgy. San Roque, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangona, Rizal | 1,587,000.00 | August 26, 2021 | 120 | ||||||||||||||||
38 | 26 | ANTIPOLO-26AUGUST2021-10 | Repair / Repainting of Two Storey, Four Rooms Deped School Building #3 at Maximo L. Gatlabayan Memorial National High School, SitioPaenaan, Brgy. San Jose, Antipolo City | P1,038,476.43 | Brgy. San Jose, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | 1,027,101.26 | August 26, 2021 | 120 | ||||||||||||||||
39 | 27 | ANTIPOLO-26AUGUST2021-11 | Road Improvement at Road Lot 2, Grand Tipolo Subdivision, Brgy. San Roque, Antipolo City | P 4,100,000.00 | Brgy. San Roque, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | 4,086,000.00 | August 26, 2021 | 180 | ||||||||||||||||
40 | 28 | ANTIPOLO-26AUGUST2021-12 | Improvement of Male Comfort Rooms and Construction of Wash Facilities at Various Schools, Brgy. San Jose, Antipolo City ( 2021 - Package 82 ) a. Improvement of Male Comfort Rooms at Maximo Gatlabayan Memorial National Highschool, SitioPaenaan, Brgy. San Jose, Antipolo City b. Construction of Wash Facilities Structure at Rizza National High School, Brgy. San Jose, Antipolo City c. Construction of Wash Facilities Structure at San Joseph Elementary School, Brgy. San Jose, Antipolo City d. Construction of Wash Facilities Structure at Canumay National High School, Brgy. San Jose, Antipolo City | a. P 200,000.00 b. P 168,182.48 c. P 310,314.30 d. P 319,964.26 ------------------------ P998,461.04 | Brgy. San Jose, Antipolo Cit | JG NORA BUILDERS | James G. Nora Morong, Rizal | a. 197,964.82 b. 166,505.09 c. 307,179.38 d. 316,821.60 ---------------- 988,470.89 | August 26, 2021 | 150 | ||||||||||||||||
41 | 29 | ANTIPOLO-26AUGUST2021-13 | Rehabilitation of Riprap and Construction of Wash Facilities at Brgy. San Jose, Antipolo City( 2021 - Package 83 ) a. Rehabilitation of Collapsed Riprap Due to Typhoon Ulysses at Carigma Street (Tanag Creek), Barangay San Jose, Antipolo City b. Construction of Wash Facilities Structure At Tanza Elementary School, Brgy. San Jose, Antipolo City c. Construction of Wash Facilities Structure at Upper Kilingan Elementary School, Brgy. San Jose, Antipolo City | a. P 72,053.27 b. P 154,290.61 c. P 158,921.11 -------------------- P 385,264.99 | Brgy. San Jose, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | a. 70,557.09 b. 151,086.78 c. 155,621.19 ---------------- 377,265.06 | August 26, 2021 | 150 | ||||||||||||||||
42 | 30 | ANTIPOLO-26AUGUST2021-14 | Construction of Playground, Covered Court Posts and Wash Facilities Structures, Brgy. San Isidro, Brgy. Cupang and Brgy. San Jose, Antipolo City ( 2021 - Package 84 ) a. Construction of Playground at Block 55, Lot 5 and 6, BagongNayon II Phase 2, Barangay San Isidro, Antipolo City b. Repair of Covered Court Posts at Taguete Elementary School, Brgy. Cupang, Antipolo City c. Construction of Wash Facilities Structure at Antipolo City National Science And Technology High School, Brgy. San Jose, Antipolo City d. Construction of Hand Wash Facility at SitioManseta Evacuation Center, Brgy. Cupang, Antipolo City | a. P 856,930.52 b. P 225,634.54 c. P 306,805.18 d. P 172,281.11 --------------------- P1,561,651.35 | Brgy. Cupang and Brgy. San Jose, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangona, Rizal | a. 850,100.30 b. 224,149.89 c. 303,280.78 d. 170,920.81 ----------------- 1,548,451.78 | August 26, 2021 | 150 | ||||||||||||||||
43 | 31 | ANTIPOLO-26AUGUST2021-15 | Rehabilitation of Damaged Riprap and Construction of Wash Facilities Structures, Brgy. San Jose and Brgy. Inarawan, Antipolo City ( 2021 - Package 85 ) a. Rehabilitation of Damaged Riprap Due to Typhoon Ulysses at BagongBuhay Homeowners Association, Brgy. San Jose, Antipolo City b. Construction of Wash Facilities Structure at Inuman Elementary School, Brgy. Inarawan, Antipolo City c. Construction of Wash Facilities Structure at Marcelino M. Santos National High School, Brgy. San Jose, Antipolo City d. Construction of Wash Facilities Structure at Teofila Z. Rovero Memorial Elementary School, Brgy. San Jose, Antipolo City | a. P 170,927.52 b. P 288,009.36 c. P 307,396.46 d. P 279,890.51 ---------------------- P1,046,223.85 | Brgy. San Jose and Brgy. Inarawan, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangona, Rizal | a. 167,426.67 b. 284,509.36 c. 303,896.46 d. 276,390.51 ----------------- 1,032,223.00 | August 26, 2021 | 150 | ||||||||||||||||
44 | 32 | ANTIPOLO-26AUGUST2021-16 | Various Improvements/ Construction at DelaPaz National High School, Brgy. Dela Paz, Antipolo City ( 2021 - Package 86 ) a. Improvement of 15 X 30m Covered Court at Dela Paz National High School, Brgy. Dela Paz, Antipolo City b. Construction of Storage at Dela Paz National High School, Brgy. Dela Paz, Antipolo City c. Improvement of Perimeter Fence at Dela Paz National High School, Brgy. Dela Paz, Antipolo City | a. P 376,091.18 b. P 584,605.60 c. P 1,050,313.16 --------------------- P 2,011,009.94 | Brgy. Dela Paz, Antipolo City | N. FRANCISCO CONSTRUCTION | Novencio S. Francisco Morong, Rizal | a. 371,453.23 b. 578,928.84 c. 1,045,651.10 ------------------ 1,996,033.17 | August 26, 2021 | 150 | ||||||||||||||||
45 | 33 | ANTIPOLO-26AUGUST2021-17 | Repair / Repainting of Two Storey, Four Rooms Deped School Building #1 at Maximo L. Gatlabayan Memorial National High School, SitioPaenaan, Brgy. San Jose, Antipolo City | P 1,036,028.11 | Brgy. San Jose, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangona, Rizal | 1,026,000.00 | August 26, 2021 | 120 | ||||||||||||||||
46 | 34 | ANTIPOLO-26AUGUST2021-18 | Construction of Health Center at SitioCasunugan, San Ysiro, Barangay San Jose, Antipolo City | P 2,300,000.00 | Barangay San Jose, Antipolo City | CAMORI BUILDERS & SUPPLY | Jommel G. Santiago Morong, Rizal | 2,286,766.45 | August 26, 2021 | 210 | ||||||||||||||||
47 | 35 | ANTIPOLO-26AUGUST2021-19 | Construction of Playground at Various Location at Brgy. San Isidro, Antipolo City | P 1,557,325.76 | Brgy. San Isidro, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangona, Rizal | 1,545,300.00 | August 26, 2021 | 180 | ||||||||||||||||
48 | 36 | ANTIPOLO-26AUGUST2021-20 | Construction of Playground at Various Location at Brgy. Dela Paz, Antipolo City | P3,525,422.37 | Brgy. Dela Paz, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangona, Rizal | 3,510,410.00 | August 26, 2021 | 180 | ||||||||||||||||
49 | 37 | ANTIPOLO-26AUGUST2021-21 | Various Repair / Repainting/ Improvement at Brgy. Cupang, Antipolo City ( 2021 - Package 87 ) a. Repair / Repainting of Basic Emergency Obstetric and New Born Care at Spring Valley, Peñafrancia, Brgy. Cupang, Antipolo City b. Improvement of Two (2) Storey Health Station at Area Dela Paz, Brgy. Cupang, Antipolo City | a. P 484,067.25 b. P 535,227.40 ------------------- P 1,019,294.65 | Brgy. Cupang, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | a. 479,178.00 b. 529,822.00 ---------------- 1,009,000.00 | August 26, 2021 | 180 | ||||||||||||||||
50 | 38 | ANTIPOLO-26AUGUST2021-22 | Construction of Wash Facilities Structure at Various Schools, Brgy. Calawis, Antipolo City ( 2021 - Package 88 ) a. Construction of Wash Facilities Structure at Binayoyo Elementary School, Brgy. Calawis, Antipolo City b. Construction of Wash Facilities Structure at Calawis Elementary School, Brgy. Calawis, Antipolo City | a. P 329,388.52 b. P 322,493.64 -------------------- P 651,882.16 | Brgy. Calawis, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | a. 325,086.54 b. 319,800.99 --------------- 644,887.53 | August 26, 2021 | 120 | ||||||||||||||||
51 | 39 | ANTIPOLO-01SEPTEMBER2021-01 | Road Improvement at Knights of Columbus Community at Brgy. San Roque, Antipolo City | P 2,000,000.00 | Brgy. San Roque, Antipolo City | MARIANO M. MACLANG CONSTRUCTION AND DEVELOPMENT | Mariano M. Maclang Taytay, Rizal | 1,985,023.69 | September 1, 2021 | 180 | ||||||||||||||||
52 | 40 | ANTIPOLO-01SEPTEMBER2021-02 | Improvement of Calawis - Apia Road Damaged by Typhoon Ulysses, Brgy. Calawis, Antipolo City | P 1,999,092.55 | Brgy. Calawis, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangona, Rizal | 1,984,000.00 | September 1, 2021 | 210 | ||||||||||||||||
53 | 41 | ANTIPOLO-01SEPTEMBER2021-03 | Rehabilitation of Sapinit Road, Brgy. San Juan, Antipolo City | P 7,700,000.00 | Brgy. San Juan, Antipolo City | PST CONSTRUCTION | Procopio S. Torres Jr. Antipolo City | 7,676,671.77 | September 1, 2021 | 250 | ||||||||||||||||
54 | 42 | ANTIPOLO-01SEPTEMBER2021-04 | Construction of Drainage System at SitioManseta, Brgy. Cupang, Antipolo City | P 5,000,000.00 | Brgy. Cupang, Antipolo City | LARD BUILDERS | Renato C. Villaroman Baras, Rizal | 4,979,410.63 | September 1, 2021 | 250 | ||||||||||||||||
55 | 43 | ANTIPOLO-01SEPTEMBER2021-05 | Imprvt./ Concreting (Portion) of Everest St.,at La Montana Estates, Brgy. Sta. Cruz, Antipolo City | P 10,297,705.98 | Brgy. Sta. Cruz, Antipolo City | FLAG CONSTRUCTION CORPORATION | Fernando L. Arada Binangonan, Rizal | 10,272,700.00 | September 1, 2021 | 250 | ||||||||||||||||
56 | 44 | ANTIPOLO-01SEPTEMBER2021-06 | Road Improvement from Roman Roxas Street to Boundary between Antipolo and Teresa Going to Abuyod National High School at SitioAbuyod, Brgy. San Jose, Antipolo City | P 1,277,798.40 | SitioAbuyod, Brgy. San Jose, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangona, Rizal | 1,264,800.00 | September 1, 2021 | 180 | ||||||||||||||||
57 | 45 | ANTIPOLO-01SEPTEMBER2021-07 | Construction of Wash Facilities Structure at Jesus S. Cabarrus Elementary School, Brgy. San Jose,Antipolo City | P 323,666.14 | Brgy. San Jose,Antipolo City | JG NORA BUILDERS | James G. Nora Morong, Rizal | 318,458.95 | September 1, 2021 | 180 | ||||||||||||||||
58 | 46 | ANTIPOLO-01SEPTEMBER2021-08 | Improvement of Drainage System at Various Schools, Brgy. San Isidro, Antipolo City ( 2021 - Package 89 ) a. Improvement of Drainage System of BagongNayon II National Highschool - Annex, Brgy. San Isidro, Antipolo City b. Improvement of Drainage System at BagongNayon II Elementary School, Brgy. San Isidro, Antipolo City | a. P 604,049.95 b. P 289,608.13 -------------------- P893,658.08 | Brgy. San Isidro, Antipolo City | CJBJ CONSTRUCTION & SUPPLIES | Charles Jeison Javier Taytay, Rizal | a. 598,610.02 b. 287,066.26 ---------------- 885,676.28 | September 1, 2021 | 180 | ||||||||||||||||
59 | 47 | ANTIPOLO-01SEPTEMBER2021-09 | Construction of Road from School Gate to Roadside at Libis Elementary School, SitioLibis, Brgy. San Jose, Antipolo City | P 2,134,920.42 | Brgy. San Jose, Antipolo City | 1C4M BUILDERS INC. | Meynard C. Kho Antipolo City | 2,121,920.00 | September 1, 2021 | 250 | ||||||||||||||||
60 | 48 | ANTIPOLO-01SEPTEMBER2021-10 | Construction of Drainage System and Stone Masonry Riverwall, Brgy. Mambugan, Antipolo City ( 2021 - Package 90 ) a. Construction of Drainage System at Don Lucas St., Villa Cecilia Subdivision, Brgy. Mambugan, Antipolo City ( Phase II ) b. Construction of Stone Masonry Riverwall Damaged by Typhoon Ulysses along the Creek at Alley 2, Phase 1, Virginia Summerville Subd., Brgy. Mambugan, Antipolo City | a. P 1,800,000.00 b. P 430,395.75 -------------------- P2,230,395.75 | Brgy. Mambugan, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | a. 1,791,053.15 b. 426,837.51 ----------------- 2,217,890.66 | September 1, 2021 | 250 | ||||||||||||||||
61 | 49 | ANTIPOLO-01SEPTEMBER2021-11 | Repair of Leakage at Interior and Exterior Wall of School Stage and Construction of Hand Wash Facility, Brgy. San Jose, Antipolo City ( 2021 - Package 91 ) a. Repair of Leakage at Interior and Exterior Wall of School Stage at Old Boso - Boso Elementary School, Brgy. San Jose, Antipolo City b. Construction of Hand Wash Facility at SitioBuhanginan Evacuation Center, Brgy. San Jose, Antipolo City c. Construction of Hand Wash Facility at Old BosoBoso Evacuation Center, Brgy. San Jose, Antipolo City | a. P 301,172.19 b. P 199,305.29 b. P 198,149.52 --------------------- P698,627.00 | Brgy. San Jose, Antipolo City | GKB BUILDERS | Gerarld Kenn Sj. Bilog Morong, Rizal | a. 297,170.00 b. 196,300.00 c. 195,140.00 ---------------- 688,610.00 | September 1, 2021 | 180 | ||||||||||||||||
62 | 50 | ANTIPOLO-01SEPTEMBER2021-12 | Improvement of Two (2) StoreyYnares Multi-Purpose Building at SitioKamatisan, Brgy. Dalig, Antipolo City | P 410,804.00 | Brgy. Dalig, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangona, Rizal | 404,787.99 | September 1, 2021 | 180 | ||||||||||||||||
63 | 51 | ANTIPOLO-01SEPTEMBER2021-13 | Construction of Stone Masonry Slope Protection Wall and Repair / Improvement of Stone MasonryRiverwall, Brgy. San Jose and Brgy. Dalig, Antipolo City ( 2021 - Package 92 ) a. Construction of Stone Masonry Slope Protection Wall at Maximo L. Gatlabayan Memorial National High School, Brgy. San Jose, Antipolo City b. Repair / Improvement of Stone MasonryRiverwall (Portion) along SapangBuho Creek, Lualhati Compound. Barangay Dalig,Antipolo City | a. P 530,362.45 b. P 399,012.69 ------------------- P 929,375.14 | Brgy. San Jose and Brgy. Dalig, Antipolo City | JEMACON BUILDERS | Ricardo V. Sardea Antipolo City | a. 525,608.22 b. 393,039.73 --------------- 918,647.95 | September 1, 2021 | 180 | ||||||||||||||||
64 | 52 | ANTIPOLO-01SEPTEMBER2021-14 | Repair of Roofing and Water System Upgrade at Various Schools, Brgy. Cupang and Brgy. San Jose, Antipolo City ( 2021 - Package 93 ) a. Repair of Roofing at Cupang National High School Damaged by Typhoon Ulysses, Brgy. Cupang,Antipolo City b. Water System Upgrade at Marcelino M. Santos National High School at SitioTagbac, Brgy. San Jose, Antipolo City | a. P 200,000.00 b. P 642,009.72 --------------------- P 842,009.72 | Brgy. Cupang and Brgy. San Jose, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | a. 198,021.38 b. 633,978.62 ------------------- 832,000.00 | September 1, 2021 | 180 | ||||||||||||||||
65 | 53 | ANTIPOLO-01SEPTEMBER2021-15 | Installation of 400 ft 4 Inches DiameterDeepwell at Upper Kilingan Elementary School, Brgy. San Jose. Antipolo City | P 2,067,994.83 | Brgy. San Jose. Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 2,055,000.00 | September 1, 2021 | 210 | ||||||||||||||||
66 | 54 | ANTIPOLO-01SEPTEMBER2021-16 | Rehabilitation of Stone Masonry Riverwall Damaged by Typhoon Ulysses along the Creek between M. Santos Extension and Robinsons Homes Subdivision, Brgy. San Jose, Antipolo City | P 2,876,086.50 | Brgy. San Jose, Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 2,863,165.42 | September 1, 2021 | 210 | ||||||||||||||||
67 | 55 | ANTIPOLO-01SEPTEMBER2021-17 | Construction of Wash Facilities Structure atIsaias S. Tapales Elementary School, Brgy. Dalig. Antipolo City | P 296,575.36 | Brgy. Dalig. Antipolo City | KIT UBIADAS CONSTRUCTION CORPORATION | Lauro M. Ubiadas Binangonan, Rizal | 291,550.00 | September 1, 2021 | 120 | ||||||||||||||||
68 | 56 | ANTIPOLO-15SEPTEMBER2021-01 | Improvement of Old City Hall Building at Brgy. San Roque, Antipolo City | P30,718,207.43 | Brgy. San Roque, Antipolo City | SAN RAFAEL BUILDERS | Ma. Loida C. Nocon Rodriguez, Rizal | 30,666,577.44 | September 15, 2021 | 210 | ||||||||||||||||
69 | 57 | ANTIPOLO-15SEPTEMBER2021-02 | Improvement of Gender Advocacy Development Center ( GAD ) at Brgy. San Roque, Antipolo City | P9,954,952.42 | Brgy. San Roque, Antipolo City | A.M MAURICIO CONSTRUCTION & BUILDERS INC. | Aimee Mauricio Antipolo City | 9,934,832.65 | September 15, 2021 | 210 | ||||||||||||||||
70 | 58 | ANTIPOLO-15SEPTEMBER2021-03 | Construction of Command Center at GAD Building, Antipolo City | P 5,996,953.81 | Brgy. San Roque, Antipolo City | OLIVER AQUINO CONSTRUCTION | Oliver O. Aquino Binangona, Rizal | 5,981,969.56 | September 15, 2021 | 210 | ||||||||||||||||
71 | 59 | ANTIPOLO-15SEPTEMBER2021-04 | Improvement of Antipolo City Hospital System( ACHS ) - Annex – IV,Brgy. Mambugan, Antipolo City | P1,700,000.00 | Brgy. Mambugan, Antipolo City | DC SANDIL CONSTRUCTION & REALTY DEVELOPMENT CORP. | Dennis C. Sandil Antipolo City | 1,538,000.00 | September 15, 2021 | 120 | ||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | We hereby certify that we have reviewed the contents and hereby attest to the veracity and correctness of the data or information contained in this document. | |||||||||||||||||||||||||
74 | GLENN C. ALTARES (SGD.) | ENGR. JESUS S. GONZAGA (SGD.) | ATTY. CEDRICK JUSTICE U. CAPIRAL (SGD.) | MS. PRISCILLA R. PADUA (SGD.) | ENGR. VIOLETA S. FAIYAZ (SGD.) | |||||||||||||||||||||
75 | Business Permit & Licensing Officer | City Engineer | City Legal Officer | Officer In Charge | City Environment and Waste Management Officer | |||||||||||||||||||||
76 | Business Permit & Licensing Office | Office of the City Engineer | City Legal Office | City Budget Office | City Environment and Waste Management Office | |||||||||||||||||||||
77 | Chairman-BAC | Vice Chairman – BAC | Member-BAC | Member-BAC | Member-BAC | |||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | SALEM T. CERVANTES (SGD.) | |||||||||||||||||||||||||
82 | Head, BAC - Secretariat for Civil Works | |||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 | ||||||||||||||||||||||||||