ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
2
BOQ for Super Structure Water Proofing / Roof Water proofing
3
BILL OF QUANTITY FOR SUBSTRUCTURE WATER PROOFING WORK / ROOF WATER PROOFING WORK
4
Si.NoDescriptionUnitQuantityUnit RateAmountRemark
5
Bill of Quantity for Roof Water Proofing Work- Torch applied
6
Roof Area Water Proofing Work-Horizontal
7
1Surface Preparation on horizontal area before application of water proofing workm2
8
2Concrete Screed laid to slope :- Supply and cast Light Weight Screed 50-100 mm thick as per project Specificationm2
9
3Supply and apply one (or) two coat approved bituminous primer over the light weight screed , as per project specificationm2
10
4Supply and apply one (or) Two Layer Approved Torch applied bituminous water proofing membrane over the primer surface, as per project specificationm2
11
5Supply and apply one layer Polystyrene Heat Insulation over the membrane surface, as per project specificationm2
12
6Supply and apply one layer Geotextile (or) Terram Sheet as a separation layer over the membrane surface, as per project specificationm2
13
7Supply and cast 50 to 100 mm thick average screed 3 x 3 bay slope lines with flexal board , and filling the joints with sealantm2
14
8Dressing of Rain Water outletsNos
15
Roof Area Water Proofing Work-Upstands Vertical
16
1Groove cutting :- To Prepare groove cutting on upstands vertical surfacelm
17
2Upstands :- Supply and Apply one coat primer + One (or) Two Layer mineral finished bituminous water proofing membrane to be terminated in the groove as per project specificationlm
18
3Supply and fix approved aluminum flashing including sealantlm
19
20
Total Work Done Amount for Water Proofing Work
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100