Construction Project Timeline
 Share
The version of the browser you are using is no longer supported. Please upgrade to a supported browser.Dismiss

View only
 
 
ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
2
Create professional Gantt charts in GanttPRO in a few clicks
3
4
Construction Project Timeline6/12/2020
5
Color
WBS Number
Task name / Title
Assigned to
Planned start date
Planned end date
Deadline
Progress (%)
Duration (hours)
Estimated hours
Time log (minutes)
StatusPriority
Task description
Cost
Actual cost
6
1ZONING9/12/202011/14/202003680000
7
1.1Land Use9/12/202011/13/2020036000OpenMedium00
8
1.2Easements, Set Backs9/15/202011/14/2020036000OpenMedium00
9
1.3
Access, Street Improvements
9/15/202011/14/2020036000OpenMedium00
10
1.4Utilities Available9/15/202011/14/2020036000OpenMedium00
11
2HOUSE PLANS9/17/202011/21/202003840000
12
2.1Purchase Standard Plans9/17/202011/18/2020036000OpenMedium00
13
2.2Architect Original Drawings9/18/202011/19/2020036000OpenMedium00
14
2.3Specifications9/19/202011/20/2020036000OpenMedium00
15
2.4Architect Manage Job9/22/202011/21/2020036000OpenMedium00
16
2.5Engineer-Loads & Spans9/22/202011/21/2020036000OpenMedium00
17
2.6Draftsman9/22/202011/21/2020036000OpenMedium00
18
3LOT SURVEY9/24/202011/28/202003840000
19
3.1House & Driveway9/24/202011/25/2020036000OpenMedium00
20
3.2Well Locaton9/25/202011/26/2020036000OpenMedium00
21
3.3Septic Location9/26/202011/27/2020036000OpenMedium00
22
3.4Fire Hydrant & Truck Access9/29/202011/28/2020036000OpenMedium00
23
3.5Plot Plan9/29/202011/28/2020036000OpenMedium00
24
4FINANCIAL - LOAN9/30/202012/4/202003840000
25
4.1Land Cost9/30/202012/1/2020036000OpenMedium00
26
4.2Interest on Land10/1/202012/2/2020036000OpenMedium00
27
4.3Interest on Const. Loan10/2/202012/3/2020036000OpenMedium00
28
4.4Points, Etc.10/3/202012/4/2020036000OpenMedium00
29
5SEWER & WATER HOOKUP10/6/202012/5/2020036000OpenMedium00
30
6HEALTH PERMIT10/6/202012/9/202003760000
31
6.1Fees10/6/202012/5/2020036000OpenMedium00
32
6.2Percolation Test10/7/202012/8/2020036000OpenMedium00
33
6.3Soils Engineer10/8/202012/9/2020036000OpenMedium00
34
7INSURANCE10/9/202012/10/2020036000OpenMedium00
35
8LOT CLOSING COSTS10/10/202012/11/2020036000OpenMedium00
36
9BUILDING PERMITS10/13/202012/12/202003600000
37
9.1Fees10/13/202012/12/2020036000OpenMedium00
38
9.2Inspection Schedule10/13/202012/12/2020036000OpenMedium00
39
10PRELIMINARY LIST ONLY10/14/202012/15/2020036000OpenMedium00
40
11BUILD PHASE10/15/202012/16/2020036000OpenMedium00
41
12SPECIAL & DRY IN MATERIALS10/17/202012/19/202003680000
42
12.1Rough Hardware, Misc.10/17/202012/18/2020036000OpenMedium00
43
12.2Lolly Columns10/20/202012/19/2020036000OpenMedium00
44
12.3Steel Beams10/20/202012/19/2020036000OpenMedium00
45
12.4Rough Lumber, Trusses10/20/202012/19/2020036000OpenMedium00
46
13WINDOWS/OPENINGS10/22/202012/25/202003760000
47
13.1Windows, Grills, Screens10/22/202012/23/2020036000OpenMedium00
48
13.2Exterior Doors,Screens10/23/202012/24/2020036000OpenMedium00
49
13.3Skylights and Light Tubes10/24/202012/25/2020036000OpenMedium00
50
14DEMOLITION10/27/202012/26/2020036000OpenMedium00
51
15LOT CLEARING10/27/202012/30/202003760000
52
15.1Debris Removal & Clearing10/27/202012/26/2020036000OpenMedium00
53
15.2Dump Fee10/28/202012/29/2020036000OpenMedium00
54
15.3Bury Stumps, etc.10/29/202012/30/2020036000OpenMedium00
55
16DRIVEWAY, rough10/31/20201/2/202103680000
56
16.1Grade10/31/20201/1/2021036000OpenMedium00
57
16.2Base Rock, Culverts11/3/20201/2/2021036000OpenMedium00
58
17UTILITIES11/3/20201/5/202103680000
59
17.1Temporary at startup11/3/20201/2/2021036000OpenMedium00
60
17.2Transfer to permanent11/4/20201/5/2021036000OpenMedium00
61
18WELL or PUBLIC WATER11/5/20201/6/2021036000OpenMedium00
62
19SEPTIC or PUBLIC SEWER11/6/20201/7/2021036000OpenMedium00
63
20LAYOUT HOUSE FOOTPRINT11/10/20201/9/202103600000
64
20.1Establish Finish Floor Height11/10/20201/9/2021036000OpenMedium00
65
20.2Set Back Distances11/10/20201/9/2021036000OpenMedium00
66
21DIG FOUNDATION11/10/20201/9/2021036000OpenMedium00
67
22ROCK PROBLEM11/11/20201/12/2021036000OpenMedium00
68
23PREPARE FOR FOOTINGS11/13/20201/15/202103680000
69
23.1Lay out and excavate11/13/20201/14/2021036000OpenMedium00
70
23.2Form, Rebar, Grade Pegs11/14/20201/15/2021036000OpenMedium00
71
24POUR FOOTINGS & PADS11/17/20201/16/202103600000
72
24.1Yds. of Concrete11/17/20201/16/2021036000OpenMedium00
73
25SET BRICK POINTS11/17/20201/16/2021036000OpenMedium00
74
26TERMITE TREATMENT11/18/20201/19/2021036000OpenMedium00
75
27RADON CONTROL11/19/20201/20/2021036000OpenMedium00
76
28FOUNDATION WALLS11/21/20201/27/202103840000
77
28.1Block/Course11/21/20201/22/2021036000OpenMedium00
78
28.2Piers11/24/20201/23/2021036000OpenMedium00
79
28.3Pour Wall, Yds. Of Concrete11/24/20201/23/2021036000OpenMedium00
80
28.4Lintels, Rebar11/24/20201/23/2021036000OpenMedium00
81
28.5Parging11/25/20201/26/2021036000OpenMedium00
82
28.6Cement, Sand, etc.11/26/20201/27/2021036000OpenMedium00
83
29WATERPROOF FOUNDATION.11/27/20201/28/2021036000OpenMedium00
84
30COLUMNS/BEAMS SET11/28/20201/29/2021036000OpenMedium00
85
31UNDERGROUND PLUMBING12/1/20201/30/2021036000OpenMedium00
86
32BRICK/STONE, to finish grade12/1/20201/30/2021036000OpenMedium00
87
33GARAGE DOORS12/2/20202/3/202103680000
88
33.1Openers12/2/20202/2/2021036000OpenMedium00
89
33.2Trim, Backing, Weatherstrip12/3/20202/3/2021036000OpenMedium00
90
34DRAIN TILE12/4/20202/4/2021036000OpenMedium00
91
35FIRE PLACE - INTERIOR12/8/20202/6/202103600000
92
35.1Pour Hearth12/8/20202/6/2021036000OpenMedium00
93
35.2Firebox, or Set Prefab12/8/20202/6/2021036000OpenMedium00
94
35.3Brick or Stone Facing12/8/20202/6/2021036000OpenMedium00
95
36PREPARE CONC. SLABS ETC.12/10/20202/13/202103840000
96
36.1
Gravel, Wire, Poly, Grade Stakes
12/10/20202/10/2021036000OpenMedium00
97
36.2Labor to Prepare for Slab12/11/20202/11/2021036000OpenMedium00
98
36.3Rebar, Wire, form boards12/12/20202/12/2021036000OpenMedium00
99
36.4
Labor-Prepare, Form other Conc.
12/15/20202/13/2021036000OpenMedium00
100
36.5
Deck & Post Hole footings, etc.
12/15/20202/13/2021036000OpenMedium00
Loading...