JURUTERA PERUNDING ZAABA SDN BHD
Doc. Ref. :
2
Page 1 of 1
3
4
Earthworks Checklist
5
6
Project Ref :
Date :
7
8
Location :
Block No. :
9
10
Gridline / Zone :
Level :
11
12
Drawing Ref. No. :
13
14
15
16
Acceptability
17
ItemDescriptionContractor'sR.E / C.O.WRemarks
18
Rep
19
OKNot OKOKNot OK
20
1
Setting out
21
2
Clearing, grabbing and removal of top soil
22
3
Source of fill material
23
4Removal and replacement of unsuitable material
24
5Excavation
25
6Backfilling
26
7
Compaction
27
8
Field Density Test
28
9
Slope surface protection
29
10
Excavation support
30
11
Final formation level
31
12
32
13
33
14
34
35
36
37
38
39
40
41
42
43
44
45
46
1) Non-Conformances
3) Re-Inspection
47
48
49
50
2) Disposition
4) Comments
51
52
53
54
55
Checked by (Subcon's Rep)
Verified by (Contractor's Rep)
Approved : (RE/COW)
56
57
58
59
60
Signature
Signature
Signature
61
Name :Name :Name :
62
Date :Date :Date :
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100