RankProject LocationTotal Project LengthLimitsMajor RouteBegin Mile PointEnd Mile PointProject PhaseWork TypeFed non-participating workCMAQ FundingAgencyAgency Contact PersonYear Proposed Let DateProject DescriptionProposed Federal CostProposed Total Project CostProposed State CostProposed Local CostProposed Total Phase CostLocal Plan?Local Plan ScoreComplete StreetsException being requested?Describe non-motoNumber of crashes per MVMT/MEVSafety ScorePASER RatingPASER ScoreTraffic VolumeADT Score100% preserve?Fix Safety?Safety Fix ScoreDescribe safety fixesEJ AreaEJ ScorePreventative MaintenancePM ScoreNFCNFC ScoreOperational ImprovementsOI ScoreCapacity Change?Freight ScoreFed Funding ScoreLine Haul Transit ScoreRegional Safety PlanProject Score
2
1Michigan Avenue1.927Michigan Ave from Douglass Ave to Pitcher StMichigan8.57210.499
Construction (CON)
Restore & Rehabilitate
NoYesCity of KalamazooOrrin Dorr2022Resurface, restore, and rehabilitate 1.927 miles of pavement on Michigan Ave, including new signage, new pavement markings. Install new traffic signal at intersection of Douglass Ave, install conduit and fiber optic cable, install video detection, and optimization of the Michigan Ave corridor. The traffic signal work will be utilizing CMAQ funds and could be separated into a different project.2,000,0002,500,000N/A500,000N/AYes5YesNo
Traffic signal work could be separated into a different project for CMAQ.
3 or more crashes per MVMT/MEV
54202301215NoNo0Yes10Yes5
2-Other Principal Arterial
8Yes5No455592
3
2Oakland Drive1.13Oakland Drive from Parkview to HowardOakland Drive6.0277.156
Construction (CON)
Resurface
NoYesCity of KalamazooOrrin Dorr202123-Mar1.13 miles of road resurfacing, replace pavement markings, replace signage, fill in sidewalk gaps, lane width changes to widen bike lanes, pavement markings and additional signage to improve pedestrian crossings at: Maple Street, Woods Lake and shopping plaza. Traffic signal conduit, fiber optic cable installation, and traffic signal upgrades would also be added. The traffic signal portion could be removed and applied as a CMAQ funded project separately. $500,000 CMAQ1,104,0001,380,000N/A276,000N/AYes5YesNo
There are gaps in the sidewalk network currently on Oakland Drive in these limits. Adding new sidewalk in locations will complete sidewalk networks. Traffic signal work can be separated into CMAQ project at $500,000. Road work only estimate is at $880,000.
3 or more crashes per MVMT/MEV
54201646515NoYes5
Adding new signage and markings for mentioned crosswalks.
Yes10Yes5
2-Other Principal Arterial
8Yes5No25590
4
3Westnedge Avenue1.004Howard Street to CorkWestnedge Ave3.7754.779
Construction (CON)
Resurface
NoYesCity of KalamazooOrrin Dorr202323-MarResurface 1.004 miles of pavement, including new signage, pavement markings. Install conduit and fiber optic cable, add video detection for traffic signals, upgrade traffic signal equipment. Traffic signal work would be CMAQ funded and could be separated into a different project. Resurface project would be $570,000 as a stand-alone project. $500,000 CMAQ856,0001,070,000N/A214,000N/AYes5YesNo
Traffic signal work would be CMAQ funded and could be taken out as a separate project.
3 or more crashes per MVMT/MEV
551531,33215NoNo0Yes10Yes5
2-Other Principal Arterial
8Yes5No055583
5
4Sprinkle Road1.234Milham Ave to N AveSprinkle Road3.7815.015
Construction (CON)
Resurface
NoNo
Road Commission of Kalamazoo County
Ryan Minkus20211/8/2021HMA mill and resurface, culvert replacement, ADA ramps and traffic signal upgrades.1000000175000005000001500000Yes5YesNo
The RCKC is working with Metro Transit to identify bus stop locations within the project for potential upgrades. RCKC would fund connections from existing sidewalk locations to the curb, and Metro would be asked to fund any improvements above that. The roadway currently has 4-foot paved shoulders for the entire project limits. This section of roadway falls within the City of Portage, and RCKC reviewed the City's non-motorized plan and found no facilities identified for this corridor. RCKC has had conversations with City staff about the addition of a non-motorized path in the ROW. Preliminarily Portage is looking at a facility outside of the ROW.
3 or more crashes per MVMT/MEV
54201937715YesNo0Yes10Yes5
2-Other Principal Arterial
8Yes5No4582
6
5Sprinkle Road1.099E Main St to G AveSprinkle Road9.09810.197
Construction (CON)
Resurface
NoNo
Road Commission of Kalamazoo County
Ryan Minkus20221/7/2022HMA mill and resurface, ADA ramps and traffic signal upgrades.
Freight - 5.3%; In Regional Safety Plan - N; Transit Line Haul - Y
316000500000080000396000Yes5YesNo
This stretch of roadway is limited access, and non-motorized traffic is restricted from use.
Less than 3 crashes per MVMT/MEV
36152240215YesYes5
center and shoulder rumble strips for lane departures
Yes10Yes5
2-Other Principal Arterial
8Yes5No4580
7
6West KL Ave
1,693 feet
Drake Road to Concord Place DriveWest KL Ave
Construction (CON)
Roadside Facility
NoNoOshtemo TownshipJamie Baker20231/1/2023Construct 10-foot shared use path along West KL Ave (north side) from Drake Road to Concord Place Drive04695000469500469500Yes5YesNo
10-foot shared use path will be extended west to Copper Beach Blvd after the US-131 bridge over KL Ave is replaced.
3 or more crashes per MVMT/MEV
5320
16,775 (2014)
15NoYes5
Provides a safe path for pedestrians and bicyclists that is outside the roadway.
Yes10Yes53-Minor Arterial6No0No45585
8
7Whites Road1.245Whites Road from Parkview to WestnedgeWhites Road01.245
Construction (CON)
Resurface
NoNoCity of KalamazooOrrin Dorr202323-MarResurfacing the roadway, converting 4 through lanes to 2 through lanes with center left turn lane, adding bike lanes, add new signage, construct ADA compliant ramps. Add traffic signal to intersection of Whites and Duke and upgrade traffic signal at Bronson Blvd. and add conduit and fiber optic cable to the existing infrastructure.920,0001,150,000N/A230,000N/AYes5YesNo
Upgrade all sidewalk ramps to be ADA compliant, no bike lanes on Whites road currently, will add new bike lanes. Will need to add new traffic signal to Duke intersection that does not currently have one.
3 or more crashes per MVMT/MEV
542012,40812NoYes5
Adding a traffic signal at Duke will decrease angle crashes significantly.
Yes10Yes53-Minor Arterial6Yes5Yes1579
9
8East Milham Avenue
7,950 feet
South Westnedge Avenue to Portage RoadEast Milham Avenue3.0254.531
Construction (CON)
Resurface
YesNoCity of PortageJamie Harmon20212/1/2021Roadway rehabilitation consisting of HMA cold milling, HMA surfacing, concrete sidewalk and ramps, miscellaneous concrete curb and gutter, permanent pavement markings and signage, and slope restoration. Project also includes water main replacement from South Westnedge Avenue to Salem Lane and CMAQ project to include traffic signal replacement at Newport Street and Oregon Aveneue intersections with extension of fiber network.1400000282000003700001770000Yes5YesNo
There is sidewalk on both the north and south side of East Milham Avenue between South Westnedge Avenue and Lovers Lane. On the south side of East Milham Avenue between Lovers Lane and Portage Road, there is a 10 feet wide paved non-motorized trail which connects with non-motorized trails running north-south on Lovers Lane and Portage Road. This project meets the City of Portage's Natural Place to Move initiative.
3 or more crashes per MVMT/MEV
5320
13,597 ADT
14YesNo0Yes10Yes5
2-Other Principal Arterial
8Yes5No25584
10
9Milham Avenue
2.013 Miles
Oregon Avenue to Portage RoadMilham Avenue2.5084.521
Construction (CON)
Traffic Operations
NoYesCity of PortageMuhammad Arif20212/1/2021Traffic signals need to be coordinated on this segment of Milham Avenue. Traffic signals at the intersections of Milham/Newport and Milham/Oregon need to be upgraded to achieve coordination and be tied to the traffic operation center. In addition, traffic signal timings will be revised to facilitate traffic flow. Fiber optic will be added from South Westnedge Avenue to Portage Road.5052998000000294701800000Yes5YesNo320
13,597 ADT
14YesNo0Yes10No0
2-Other Principal Arterial
8Yes5No25574
11
10Stadium Drive2.153Stadium Drive from Rambling Road to Michigan AveStadium Drive7.6099.762
Construction (CON)
Restore & Rehabilitate
NoNoCity of KalamazooOrrin Dorr2021Resurface, restore, and rehabilitate 2.153 miles of pavement, including new signage and pavement markings.1,600,0002,000,000N/A400,000N/AYes5YesNo
3 or more crashes per MVMT/MEV
54202662715NoNo0Yes10Yes5
2-Other Principal Arterial
8No0No0573
12
11Parkview Avenue1.757Parkview Ave from Drake Road to Oakland DriveParkview Ave1.4253.182
Construction (CON)
Resurface
NoNoCity of KalamazooOrrin Dorr202123-MarResurface 1.757 miles of pavement, including new signage, pavement markings, replacement of guardrail.720,000900,000N/A180,000N/AYes5YesNo
3 or more crashes per MVMT/MEV
54201328813NoNo0Yes10Yes53-Minor Arterial6No0No3572
13
12South Westnedge Avenue
2,200 feet
Trade Center Way to Kilgore Road
South Westnedge Avenue
2.3432.76
Construction (CON)
Resurface
NoNoCity of PortageJamie Harmon20212/1/2021Roadway rehabilitation consisting of HMA cold milling, HMA surfacing, concrete sidewalk and ramps, miscellaneous concrete curb and gutter, permanent pavement markings and signage, and slope restoration. 5000007250000225000725000Yes5YesNo
There is sidewalk on both the west and east side of South Westnedge Avenue between Trade Center Way and Kilgore Road. The project would include extending sidewalk through the strip mall located at 5220 South Westnedge Avenue to fill this gap. This project meets the City of Portage's Natural Place to Move initiative.
3 or more crashes per MVMT/MEV
5420
34,760 ADT
15YesYes5
Install signal backplates, optimize signals, include all-red interval and use wet pavement markings.
No0Yes5
2-Other Principal Arterial
8Yes5No2575
14
13South Westnedge Avenue
5,490 feet
Mall Drive to Trade Center Way
South Westnedge Avenue
1.3132.343
Construction (CON)
Restore & Rehabilitate
NoNoCity of PortageJamie Harmon20233/1/2023Microsurface South Westnedge Avenue from south of Mall Drive to north of Trade Center Way to include traffic control and permanent pavement markings. This project will also include updating this section of corridor with Integrated Control Systems.200000250000050000250000Yes5YesNo
There is sidewalk on both the west and east side of South Westnedge Avenue Mall Drive and Trade Center Way. This project meets the City of Portage's Natural Place to Move initiative.
3 or more crashes per MVMT/MEV
570
32,300 ADT
15YesYes5
Install signal backplates, optimize signals, include all-red interval and use wet pavement markings.
Yes10Yes5
2-Other Principal Arterial
8Yes5No25570
15
14Solon Ave0.48City of Kalamazoo limit to W Main St (M-43)Solon Avenue00.48
Construction (CON)
Resurface
NoNo
Road Commission of Kalamazoo County
Ryan Minkus20211/8/2021HMA mill and resurface, ADA ramps and traffic signal upgrades.144000220000036000180000Yes5YesNo
The RCKC is working with Metro Transit to identify bus stop locations within the project for potential upgrades. RCKC would fund connections from existing sidewalk locations to the curb, and Metro would be asked to fund any improvements above that. The existing roadway currently has 4-foot paved shoulder. The RCKC currently has no non-motorized facility application for this stretch of road.
Less than 3 crashes per MVMT/MEV
361566837YesNo0Yes10Yes5
2-Other Principal Arterial
8Yes5No15569
16
15Sprinkle Rd0.8N Ave to I-94Sprinkle Road5.0155.815
Construction (CON)
Resurface
NoNo
Road Commission of Kalamazoo County
Ryan Minkus20231/6/2023HMA mill and resurface, ADA ramps and traffic signal upgrades.129000217000033000162000Yes5YesNo
Currently the only non-motorized facilities in this corridor are at the signalized intersections. Turn lanes and deceleration tapers for driveways occupy the existing ROW. The RCKC is working with Metro Transit to identify bus stop locations within the project for potential upgrades.
3 or more crashes per MVMT/MEV
56152110315YesYes5
access management / driveway reductions
No0Yes5
2-Other Principal Arterial
8Yes5No568
17
16Barney Rd1.32Nichols Rd to Douglas AveBarney Road01.32
Construction (CON)
Resurface
NoYes
Road Commission of Kalamazoo County
Ryan Minkus20231/6/2023HMA mill and resurface, ADA ramps, shoulder widening and traffic signal upgrades.
200000310000052000252000Yes5YesNo
he RCKC is working with Metro Transit to identify bus stop locations within the project for potential upgrades. RCKC would fund connections from existing sidewalk locations to the curb, and Metro would be asked to fund any improvements above that. The existing roadway currently has narrow paved shoulders that would be improved which aligns with the Townships plans. The RCKC currently has no non-motorized facility application for this stretch of road.
Less than 3 crashes per MVMT/MEV
342056626YesYes5
shoulder widening
Yes10Yes53-Minor Arterial6Yes5No267
18
17Main St. at Payne Creek crossing
200 LFT
On Main Street - 100 LFT North and 100 LFT South of the Payne Creek crossing.Main Street5.035.07
Preliminary Engineering (PE)
Reconstruct
NoNoVillage of Mattawan
Terri McLean, Village Administrator
20205/4/2020Resurface 200 LFT of existing road surface on Main Street, remove existing box culvert and replace with CSP pipe arch in Payne Creek, and remove pedestrian bridge and replace with a shared use path over Payne Creek. Reconstruction of road includes addition of necessary gravel to the road base, asphalt paving, and road striping. Also, a traffic control plan will be included with the project.166400208000041600208000Yes5YesNo
This project will include the addition of a shared use path over Payne Creek to provide access for pedestrians and bicyclists to the downtown area of the Village.
Less than 3 crashes per MVMT/MEV
342012,42112YesYes5
The replacement of the culvert will alleviate future flooding of Main Street.
Yes10No03-Minor Arterial6Yes5No066
19
18Nichols Rd1.206W Main St (M-43) to Ravine RdNichols Road01.206
Construction (CON)
Resurface
NoYes
Road Commission of Kalamazoo County
Ryan Minkus20211/8/2021HMA mill and resurface, ADA ramps and traffic signal upgrades.288000435000072000360000Yes5YesNo
The RCKC is working with Metro Transit to identify bus stop locations within the project for potential upgrades. RCKC would fund connections from existing sidewalk locations to the curb, and Metro would be asked to fund any improvements above that. The existing roadway currently has 4-foot paved shoulders. The RCKC currently has no non-motorized facility application for this stretch of road.
Less than 3 crashes per MVMT/MEV
342090919YesYes5
Intersection alignment and finish left turn lane @ Grand Prairie
No0Yes53-Minor Arterial6Yes5No1564
20
19Miller Road1.003Miller Road from Portage Street to Sprinkle RoadMiller Road02.013
Construction (CON)
Restore & Rehabilitate
NoNoCity of KalamazooOrrin Dorr202223-MarResurface, restore, and rehabilitate Miller Road, upgrade sidewalk ramps to ADA compliant, drainage improvements, add new signage as needed. $500,000 CMAQ600,000750,000N/A150,000N/AYes5YesNo
High volume of heavy commercial traffic has impacted the pavement adversely.
3 or more crashes per MVMT/MEV
532077468NoNo0Yes10Yes53-Minor Arterial6No0No362
21
20Douglas Ave1.577City of Kalamazoo limits to G AveDouglas Avenue1.3242.901
Construction (CON)
Resurface
NoNo
Road Commission of Kalamazoo County
Ryan Minkus20231/6/2023HMA mill and resurface, ADA ramps, shoulder widening and traffic signal upgrades.
230000345000058000288000Yes5YesNo
he RCKC is working with Metro Transit to identify bus stop locations within the project for potential upgrades. RCKC would fund connections from existing sidewalk locations to the curb, and Metro would be asked to fund any improvements above that. The existing roadway currently has 4-foot paved shoulders that would be improved that aligns with Township plan. The RCKC currently has no non-motorized facility application for this stretch of road.
Less than 3 crashes per MVMT/MEV
351548275YesNo0Yes10Yes5
2-Other Principal Arterial
8Yes5No0561
22
21Portage Road5,775East Centre Avenue to Romence RoadPortage Road8.459.544
Construction (CON)
Resurface
NoNoCity of PortageJamie Harmon20233/1/2023Roadway rehabilitation consisting of HMA cold milling, HMA surfacing, concrete sidewalk and ramps, miscellaneous concrete curb and gutter, permanent pavement markings and signage, and slope restoration. 750000108500003350001085000Yes5YesNo
There is sidewalk on the west side of Portage Road from East Centre Avenue to approximately 600 feet north. The City of Portage is currently looking to install at non-motorized trail adjacent to this section of Portage Road. This project meets the City of Portage's Natural Place to Move initiative.
3 or more crashes per MVMT/MEV
5420
19,890 ADT
15YesNo0No0Yes5
2-Other Principal Arterial
8Yes5No366
23
22Lovers Lane
5,400 feet
East Milham Avenue to Kilgore RoadLovers Lane2.6013.624
Construction (CON)
Resurface
NoNoCity of PortageJamie Harmon20222/1/2022Roadway rehabilitation consisting of HMA cold milling, HMA surfacing, concrete sidewalk and ramps, miscellaneous concrete curb and gutter, permanent pavement markings and signage, and slope restoration. 750000107500003250001075000Yes5YesNo
There is sidewalk on the west side of Lovers Lane between East Milham Avenue and Kilgore Road and on the east side of Lovers Lane from East Milham Avenue to I-94. There are bike lanes on both the east and west sides of Lovers Lane between East Milham Avenue and Kilgore Road. This project meets the City of Portage's Natural Place to Move initiative.
Less than 3 crashes per MVMT/MEV
3420
13,696 ADT
14YesNo0No0Yes53-Minor Arterial6Yes5No2565
24
23West Milham
1.507 Miles
Angling Road to Oregon AvenueWest Milham Avenue1.0012.508
Construction (CON)
Traffic Operations
NoYesCity of PortageMuhammad Arif20234/15/2023Traffic signals need to be coordinated on this segment of Milham Avenue. Traffic signals at the intersections of Milham/Monticello and Milham/Angling need to be upgraded to achieve coordination and be tied to the traffic operation center. In addition, traffic signal timings will be revised to facilitate traffic flow. Fiber optic will be added from Angling Road to Oakland Drive.505299110000005947011100000Yes5YesNo320
20,294 ADT
15YesOff0No0No0
2-Other Principal Arterial
8Yes5No2560
25
24Shaver Road
10,555 feet
South City Limits to Vanderbilt AvenueShaver Road1.1513.15
Construction (CON)
Resurface
YesNoCity of PortageJamie Harmon20223/1/2022Roadway rehabilitation consisting of HMA cold milling, HMA surfacing, concrete sidewalk and ramps, miscellaneous concrete curb and gutter, permanent pavement markings and signage, and slope restoration. Project also includes replacement of water main from West Osterhout Avenue to Vanderbilt Avenue.1200000253000003300001530000Yes5YesNo
There are bike lanes on both the north and south side of Shaver Road between the south City limits and Vanderbilt Avenue. This project meets the City of Portage's Natural Place to Move initiative.
Less than 3 crashes per MVMT/MEV
3420
10,754 ADT
11YesNo0No0Yes5
2-Other Principal Arterial
8Yes5No3565
26
25Countywide Urban Chip Seal0VariousVarious
Construction (CON)
OtherNoNo
Road Commission of Kalamazoo County
Ryan Minkus20231/6/2023Primary road chip seal at various locations throughout Kalamazoo County80000100000020000100000Yes5NoYes
Capital preventive maintenance project where the roadwork is not substantial enough to recognize costs savings by including the non-motorized element.
Less than 3 crashes per MVMT/MEV
351593059YesNo0Yes10Yes5
2-Other Principal Arterial
8No0No358
27
26G Ave1.747Riverview Dr to 24th StG Avenue0.4922.239
Construction (CON)
Resurface
NoNo
Road Commission of Kalamazoo County
Ryan Minkus20231/6/2023HMA mill and overlay, ADA ramps, left-turn lane, shoulder improvements and traffic signal upgrades.259000390000065000324000Yes5YesNo
This segment of the corridor currently has a 3.5-4 foot paved should and sidewalk on the south side of the road. The RCKC is working with Metro Transit to identify bus stop locations within the project for potential upgrades. The RCKC currently does not have any Non-Motorized Facilities application for this segment of road.
3 or more crashes per MVMT/MEV
561557236YesYes5
addition of left-turn lane for the school
No0Yes53-Minor Arterial6Yes5No1558
28
27Countywide Urban Chip Seal0VariousVarious
Construction (CON)
OtherNoNo
Road Commission of Kalamazoo County
Ryan Minkus20211/8/2021Primary road chip seal at various locations throughout Kalamazoo County80000100000020000100000Yes5NoYes
Capital preventive maintenance project where the roadwork is not substantial enough to recognize costs savings by including the non-motorized element.
Less than 3 crashes per MVMT/MEV
351593059YesNo0Yes10Yes5
2-Other Principal Arterial
8No0No257
29
28Countywide Urban Chip Seal0VariousVarious
Construction (CON)
OtherNoNo
Road Commission of Kalamazoo County
Ryan Minkus20221/7/2022Primary road chip seal at various locations throughout Kalamazoo County80000100000020000100000Yes5NoYes
Capital preventive maintenance project where the roadwork is not substantial enough to recognize costs savings by including the non-motorized element.
Less than 3 crashes per MVMT/MEV
351593059YesNo0Yes10Yes5
2-Other Principal Arterial
8No0No257
30
29Countywide Urban Chip Seal0VariousVarious
Construction (CON)
OtherNoNo
Road Commission of Kalamazoo County
Ryan Minkus20231/5/2024Primary road chip seal at various locations throughout Kalamazoo County80000100000020000100000Yes5NoYes
Capital preventive maintenance project where the roadwork is not substantial enough to recognize costs savings by including the non-motorized element.
Less than 3 crashes per MVMT/MEV
351593059YesNo0Yes10Yes5
2-Other Principal Arterial
8No0No257
31
30M 40 Village of Lawton
3.402 Miles
72nd Ave to South of Lagrave StreetM 406.5459.949
Construction (CON)
Reconstruct
YesNoMDOTPete Pfiffer202310/1/2022Reconstruction of M 40 through downtown Lawton. Replacement of sidewalks. Install handicap curbs and construct pedestrian crosswalks. Install pedestrian bump outs. Replace existing light poles with decorative poles. Project cost $11 Million total.4000005000000100000500000Yes5YesNo
Sidewalks will be replaced and reconstructed with ADA ramps and pedestrian bumpouts and crosswalks. Street lighting will be more conducive to non motorized traffic by installing decorative poles that are lower and more strategically placed.
3 or more crashes per MVMT/MEV
5320
8,500 per day
8OffYes5
Pedestrian bump outs and cross walks will identify where pedestrians should cross M 40. Street lights will make the after dark visibility much safer. ADA pedestrian ramps will facility handicap pedestrians navigate the sidewalks.
Yes10No04-Major Collector4No0No057
32
31Lake Street0.928Lake Street from Portage Street to City limitsLake Street0.6141.542
Construction (CON)
Restore & Rehabilitate
NoNoCity of KalamazooOrrin Dorr2023Resurface, restore, and rehabilitate 0.928 miles of pavement, including new signage, new pavement markings, and drainage improvements.424,000530,000N/A106,000N/AYes5YesNo
Less than 3 crashes per MVMT/MEV
342044654NoNo0Yes10Yes54-Major Collector4No0No0556
33
32South Westnedge Avenue
2,750 feet
Melody Avenue to East Centre Avenue
South Westnedge Avenue
2.4182.94
Construction (CON)
Resurface
NoNoCity of PortageJamie Harmon20222/1/2022Roadway rehabilitation consisting of HMA cold milling, HMA surfacing, concrete sidewalk and ramps, miscellaneous concrete curb and gutter, permanent pavement markings and signage, and slope restoration. 3650005200000155000520000Yes5YesNo
There is sidewalk on the east side of South Westnedge Avenue and a non-motorized paved trail on the west side between Melody Avenue and East Centre Avenue. This project meets the City of Portage's Natural Place to Move initiative.
3 or more crashes per MVMT/MEV
5515
10,754 ADT
11YesNo0No0Yes53-Minor Arterial6Yes5No4561
34
33Red Arrow Highway
2.01 miles
CR 653 to 28th Street
Resurface
NoNo
Van Buren County Road Commission
2021Roadway widening and resurfacing including cold miling, trenching, HMA surfacing, gravel shoulders, driveway improvements, slope restoration, signing and pavement markings.1592000199000003980Yes5YesNo
Project includes 5 foot paved shoulder
3 or more crashes per MVMT/MEV
5420976010NoYes5
Constructing a center turn lane
No0Yes53-Minor Arterial6No0No0056
35
3435th St0Battle Creek St intersection35th Street2.0952.095
Construction (CON)
Traffic Operations
NoNo
Road Commission of Kalamazoo County
Ryan Minkus / Jim Hoekstra
20231/6/2023Replacement of traffic signal, signal timing improvements, ADA ramps.200000300000050000250000Yes5YesNo
This project would improve any sidewalk ramps at the intersection to ADA standards per the township non-motorized plan.
3 or more crashes per MVMT/MEV
56151382114NoNo0No0No03-Minor Arterial6Yes5No555
36
35E Main St4.366Sprinkle Rd to 33rd StE Main St2.0546.42
Construction (CON)
Resurface
NoNo
Road Commission of Kalamazoo County
Ryan Minkus20221/7/2022HMA mill and resurface, ADA ramps, and shoulder widening.6480009800000162000810000Yes5YesNo
The existing roadway currently has 3 foot paved shoulders that would be improved to align with the current MDOT LAP guidelines. The RCKC currently has no non-motorized facility application for this stretch of road.
Less than 3 crashes per MVMT/MEV
361539284YesYes5
Extend left-turn lane @ Sprinkle to address queues
Yes10Yes53-Minor Arterial6No0No053
37
36Riverview Dr1.306Mt Olivet Rd to E AveRiverview Drive3.5574.863
Construction (CON)
Resurface
NoNo
Road Commission of Kalamazoo County
Ryan Minkus20231/6/2023HMA mill and overlay, and shoulder improvements.190000290000047500237500Yes5YesNo
This segment of the corridor currently has a 3.5-4 foot paved should and sidewalk on the south side of the road. The RCKC currently does not have any Non-Motorized Facilities application for this segment of road.
Less than 3 crashes per MVMT/MEV
342055155OffYes5
superelevation correction, curve signage, shoulders
No0Yes53-Minor Arterial6No0No352
38
37Mosel Ave1.673Douglas Ave to Riverview DrMosel Avenue1.322.993
Construction (CON)
Traffic Operations
NoYes
Road Commission of Kalamazoo County
Ryan Minkus / Jim Hoekstra
20221/7/2022Traffic signal replacement, upgrades, interconnection and timing improvements. Reconstruction of Traffic Signals at Mosel/Douglas and Mosel/Westnedge with updated corridor signal timings at four locations along Mosel Avenue. Updated detection at reconstructed signals for improved efficiency of performance. Signal interconnect with signals at Mosel/Burdick and Mosel/Riverview to be included in the project.50529910200000344701850000Yes5YesNo
The KVRT currently runs along a short section of Mosel Avenue and ADA ramps and crossings exist at 2 of the intersections along the corridor. The signals proposed for reconstruction do not currently have ramps and ADA ramps would be installed with the project in accordance with the township non-motorized plan.
3 or more crashes per MVMT/MEV
5701065411NoYes5
Backplates, optimized timing, possible left-turn phase (red and yellow clearances to address angle and rear end crash patterns on the corridor.)
Yes10No03-Minor Arterial6Yes5No451
39
38
Countywide Urban Overhead Flashers
0Up to 20 Intersections throughout Kalamazoo CountyVarious
Construction (CON)
Traffic Operations
NoNo
Road Commission of Kalamazoo County
Ryan Minkus / Jim Hoekstra
20211/8/2021Replacement of Traffic Signal Flashers at up to 20 intersections throughout Kalamazoo County80000100000020000100000Yes5YesNo
No Impacts to existing or proposed facilities as all work is above ground.
Less than 3 crashes per MVMT/MEV
351593059NoNo0Yes10No03-Minor Arterial6No0No250
40
39Riverview Drive
3430 feet
Mosel to ParchmountRiverview Drive00.65
Construction (CON)
Resurface
NoNoCity of ParchmentNancy Stoddard20229/1/20210.65 miles of street improvements including HMA mill and placement of HMA pavement, structure adjustments, pavement markings, ADA sidewalk ramps and restoration on Riverview Drive in the City of Parchment.373600467000093400467000Yes5NoYes
Existing road is 4 lanes and sidewalk on both sides. Future consideration is a road diet that would allow bike lanes on both sides of the road. Signal modifications will be required along with re-striping at that time.
Less than 3 crashes per MVMT/MEV
342053875YesNo0NANo0Yes53-Minor Arterial6No0No0549
41
40Romance Road
5,950 feet
Angling Road to Oakland DriveRomence Road0.271.397
Construction (CON)
Reconstruct
NoNoCity of PortageJamie Harmon20232/1/2023Roadway rehabilitation consisting of HMA cold milling, HMA surfacing, concrete sidewalk and ramps, miscellaneous concrete curb and gutter, permanent pavement markings and signage, and slope restoration. Will include mid-block pedestrian/school crossings with RRFB treatment at multiple locations.5600007900000230000790000Yes5YesNo
There is sidewalk on the south side of Romence Road between Angling Road and Oakland Drive and on the north side between Bellflower Drive and Rothbury Street. There are existing bike lanes on both the north and south side of Romence Road from Angling Road to Oakland Drive. The project will include the addition of sidewalk on the north side of Romence Road, east of Rothbury Street. This project meets the City of Portage's Natural Place to Move initiative.
Less than 3 crashes per MVMT/MEV
3420
9,974 ADT
10YesNo0No0Yes54-Major Collector4Yes5No153
42
41River St1.479ML Avenue to King Highway (M-96)River Street01.479
Construction (CON)
Traffic Operations
NoYes
Road Commission of Kalamazoo County
Ryan Minkus / Jim Hoekstra
20201/5/2024Project proposed for 2024. Traffic signal replacement, upgrades, interconnection and timing improvements. Reconstruction of Traffic Signals at River/ML and River/Comstock with updated corridor signal timings at four locations along River Street corridor. Updated detection at reconstructed signals for improved efficiency of performance. Signal interconnect to be included in the project.5052997680000134701640000Yes5YesNo
This project would improve any sidewalk ramps at the intersection to ADA standards per the township non-motorized plan.
3 or more crashes per MVMT/MEV
59066777NoYes5
Backplates, optimized timing, possible left-turn phase (red and yellow clearances to address angle and rear end crash patterns on the corridor.)
Yes10No03-Minor Arterial6Yes5No447
43
42Comstock Ave0.844Sprinkle Rd to River StComstock Avenue0.5361.38
Construction (CON)
Resurface
NoOff
Road Commission of Kalamazoo County
Ryan Minkus20231/5/2024HMA mill and resurface, ADA ramps, shoulder improvements and traffic signal upgrades.144000220000036000180000Yes5YesNo
The corridor currently has 10 foot wide shoulders. Addition of a center turn lane can be accomplished allowing 4 foot shoulders to remain. The RCKC is working with Metro Transit to identify bus stop locations within the project for potential upgrades. RCKC would fund connections from existing sidewalk locations to the curb. The RCKC currently does not have any Non-Motorized Facilities application for this segment of road.
3 or more crashes per MVMT/MEV
57035153YesYes5
Add center left turn lane for multiple residential drives
Yes10Yes53-Minor Arterial6Yes5No347
44
43Ravine Rd2.36Drake Rd to City of Kalamazoo limitRavine Road0.3322.696
Construction (CON)
Resurface
NoNo
Road Commission of Kalamazoo County
Ryan Minkus20231/6/2024HMA mill and resurface, ADA ramps, and shoulder improvements.
345000525000087000432000No0YesNo
The existing road has 3-4 foot paved shoulders and contains both on-street and off-street segments of the KRVT. Shoulders would be improved to meet current MDOT LAP guidelines. The RCKC currently has no non-motorized facility application for this stretch of road.
Less than 3 crashes per MVMT/MEV
361544934YesNo0Yes10Yes53-Minor Arterial6No0No447
45
44Commerce Lane
1,880 feet
Mosel to Riverview DriveCommerce Lane00.356
Construction (CON)
Resurface
NoNoCity of ParchmentNancy Stoddard202110/1/20210.356 miles of street improvements including HMA mill and placement of HMA pavement, structure adjustments, pavement markings, ADA sidewalk ramps and restoration on Commercial Lave in the City of Parchment127200159000031800159000Yes5YesNo
Existing road is adjacent to the Kalamazoo River Valley Trail and the south end. The road has sidewalk on one side of the road. The project has no modifications to the non-motorized with the exception of ADA ramp improvements.
Less than 3 crashes per MVMT/MEV
342033653YesNo0NANo0Yes55-Minor Collector2No0No3546
46
45CR 652
0.52 miles
Fench Road to Red Arrow Highway
Reconstruct
NoNo
Van Buren County Road Commission
2022Crush and shape, pave shoulders, signing and pavement markings65600082000001640000Yes5YesNo
Project includes 5 foot paved shoulder
3 or more crashes per MVMT/MEV
53201032010NoNo0NANo0Yes53-Minor Arterial6No0No0051
47
46Nichols Rd0Grand Prarie Rd intersectionNichols Road1.0061.006
Construction (CON)
Traffic Operations
NoNo
Road Commission of Kalamazoo County
Ryan Minkus / Jim Hoekstra
20211/8/2021Replacement of traffic signal, signal timing improvements, ADA ramps.160000240000040000200000Yes5YesNo
This project would improve any sidewalk ramps at the intersection to ADA standards per the township non-motorized plan.
Less than 3 crashes per MVMT/MEV
3515975010NoNo0No0No03-Minor Arterial6Yes5No145
48
47South Westnedge Avenue
8,385 feet
Osterhout Avenue to Crocket Avenue
South Westnedge Avenue
0.4532.041
Construction (CON)
Reconstruct
YesNoCity of PortageJamie Harmon20213/1/2021Roadway rehabilitation from Osterhout Avenue to South Shore Drive consisting of HMA cold milling, HMA surfacing, concrete sidewalk and ramps, miscellaneous concrete curb and gutter, permanent pavement markings and signage, and slope restoration. Project also includes renovation of South Westnedge Avenue lift station and forcemain replacement via trenchless methods from the lift station south of South Shore Drive to Crocket Avenue.62500015400000215000840000Yes5YesNo
There is sidewalk on the west side of South Westnedge Avenue between Osterhout Avenue and South Shore Drive and on the east side of South Westnedge Avenue from Cliffwood Drive to Bacon Avenue. The feasibility of adding sidewalk to other areas on the east side to connect neighborhoods will be reviewed during design. There are existing shoulders wide enough for bike lanes but the project will add dedicated and signed bike lanes from Osterhout Avenue to South Shore Drive. This project meets the City of Portage's Natural Place to Move initiative.
Less than 3 crashes per MVMT/MEV
3420
4,738 ADT
5YesNo0No0Yes53-Minor Arterial6No0No246
49
48CR 652
3.15 miles
72nd Ave to Robison Road (60th Ave)
Resurface
NoNo
Van Buren County Road Commission
2020Trench and widen, cold milling, HMA paving and pavement markings1160000145000002900000Yes5YesNo
Project includes 5 foot paved shoulder
3 or more crashes per MVMT/MEV
532017822NoNo0NANo0Yes54-Major Collector4No0No0041
50
49
City of Galesburg and Village of Augusta
4.37M-96 and 37th St. in Galesburg to west edge of Fort Custer Recreation Area in AugustaM-96
Construction (CON)
Roadside Facility
NoNo
Road Commission of Kalamazoo County
Ryan Minkus20217/9/2021Approximately 4.37 miles of 10 foot wide HMA non-motorized path, including several sections of boardwalk. Kalamazoo River Valley Trail Segment 7a begins at Galesburg-Augusta High School and continues to Fort Custer Recreation Area.1510000359380030000017838003593800Yes5YesNo
Proposed facility is a separated from roadway, providing connections to other non-motorized facilities within the County.
Less than 3 crashes per MVMT/MEV
351576008NoNo0No0Yes5
2-Other Principal Arterial
8No0No044
51
50Stadium Drive
10,300 feet
East Boundary of Oshtemo DDA to 8th StStadium Drive
Construction (CON)
Roadside Facility
NoNoOshtemo DDAJamie Baker20201/1/2020.4,423 lineal feet of 6-foot shared use path, north side of Stadium Drive, from 8th Street to the west boundary line of the Consumer’s Energy parcel 05-25-305-010 (the dividing line for the Oshtemo DDA).
.5,884 lineal feet of 6-foot shared use path south side of Stadium Drive, from 8th Street to the west boundary line of the Consumer’s Energy parcel 05-25-305-010 (the dividing line for the Oshtemo DDA).
10040006024004016001004000Yes5YesNo
Joint project with Oshtemo Township to build 6 foot shared use paths on both sides of Stadium Drive from 11th St to 8th St.
Less than 3 crashes per MVMT/MEV
3901472615NoYes5
Provides safe path for pedestrians and bicyclists through a very heavy traffic corridor.
No0No0
2-Other Principal Arterial
8No0No339
52
51
City of Galesburg and Village of Augusta
4.37M-96 and 37th St. in Galesburg to west edge of Fort Custer Recreation Area in AugustaM-96
Construction (CON)
Roadside Facility
NoNo
Road Commission of Kalamazoo County
Ryan Minkus20217/9/2021Approximately 4.37 miles of 10 foot wide HMA non-motorized path, including several sections of boardwalk. Kalamazoo River Valley Trail Segment 7a begins at Galesburg-Augusta High School and continues to Fort Custer Recreation Area.1510000359380030000017838003593800Yes5YesNo
Proposed facility is a separated from roadway, providing connections to other non-motorized facilities within the County.
Less than 3 crashes per MVMT/MEV
351576008NoNo0No0Yes5
2-Other Principal Arterial
8No0No044
53
52CR 6651 mile64th Avenue to 60th Aveneu
Resurface
NoNo
Van Buren County Road Commission
2021Trench and widen, crush and shape, HMA paving, restoration, and pavement markings976000122000002440000NO0NoNo
3 or more crashes per MVMT/MEV
532015782NoNo0NANo0Yes54-Major Collector4No0No0036
54
53Shaver Rd1.591US-131 to Portage City limitShaver Road0.1281.719
Construction (CON)
Resurface
NoNo
Road Commission of Kalamazoo County
Ryan Minkus20221/7/2022HMA mill and resurface.4320006480000108000540000Yes5YesNo
The existing corridor has 4 foot paved shoulders. The RCKC currently does not have any Non-Motorized Facilities application for this segment of road.
Less than 3 crashes per MVMT/MEV
38083928YesNo0No0Yes5
2-Other Principal Arterial
8No0No0534
55
54CR 364
0.99 miles
CR 657 to Western Avenue
Reconstruct
NoNo
Van Buren County Road Commission
2022Trench and widen, cold milling, HMA paving and pavement markings1104000138000002760000Yes5YesNo
Project includes 5 foot paved shoulder
3 or more crashes per MVMT/MEV
561515942NoNo0NANo0Yes53-Minor Arterial6No0No0038
56
55Green Meadow Drive
2,750 feet
Drake Road to Dragonfly Road (south side) and Drake Road to Round Hill Road (north side)Green Meadow Drive
Construction (CON)
Roadside Facility
NoNoOshtemo TownshipJamie Baker20211/1/2021Construct 5-foot sidewalk on the south side of Green Meadow Drive from Drake Road to the first entrance to the Canterbury Apartment (Dragonfly Road) and on the north side of Green Meadow Drive from Drake Road to Round Hill Road.04277000427700427700Yes5YesNo
Two-foot shoulders exist on Green Meadow Drive
Less than 3 crashes per MVMT/MEV
37018292NoNo0
Provides safe path for pedestrians to bus stop on Drake Road and to Linden Grove Middle School.
Yes10No00No0No0525
57
56Croyden Ave/Maple Hill Drive
3,915 feet
Croyden Ave from Drake Road to Maple Hill Drive and Maple Hill Drive from Croyden Ave to Vintage Lane
Croyden Ave and Maple Hill Drive
Construction (CON)
Roadside Facility
NoNoOshtemo TownshipJamie Baker20221/1/2022Construct 5-foot sidewalk on both sides of Croyden Ave from Drake Road to Maple Hill Drive.
Construct 5-foot sidewalk on the east side of Maple Hill Drive from Croyden Ave to Vintage Lane.
05050000505000505000Yes5YesNoNone.
Less than 3 crashes per MVMT/MEV
370N/ANoNo0
Provide safe path for pedestrians to bus stops on Drake Road.
Yes10No00No0No018
58
57CR 657
0.82 miles
CR 364 to I-94
Reconstruct
NoNo
Van Buren County Road Commission
2023Trench and widen, cold milling, HMA paving, drainage, guardrail, signage, and pavement markings78000097500001950000NO0NoNo
3 or more crashes per MVMT/MEV
57029373NoNo0NANo0Yes54-Major Collector4No0No0017
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Loading...
Main menu