ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
CONTROLS SIMPLIFICATION CHECK-LIST
2
3
SECTION 1 - RELEVANCE & NECESSITY
Response Y/N
4
5
1Does the control address a real, material risk?Y
6
2Does it prevent or detect a failure that actually happens in your process?N
7
3Is there another existing control covering exactly the same risk?N
8
4Does this control exist only because “we always had it”?Y
9
5Would removing this control increase residual risk? N
10
Borderline relevance – review with process owner
11
SECTION 2 - DESIGN QUALITY
12
13
6Is the control wording clear, specific, and free of jargon?Y
14
7Does it contain: activity, frequency, owner, evidence, population, and IPE?N
15
8Is the frequency appropriate (monthly vs weekly vs daily)?N
16
9Is the owner the right person (authority, access, competence)?N
17
10Can the control be tested by an auditor without interpretation?Y
18
Major design issues – redesign required
19
SECTION 3 - DUPLICATION & OVERLAP
20
11Are there multiple controls doing the same check at different points?N
21
12Can two similar controls be merged into one stronger control?Y
22
13Are there unnecessary approvals added “just in case”?N
23
14Is the MRC (management review control) duplicating transactional checks?Y
24
High duplication – merge or eliminate
25
SECTION 4 - EVIDENCE & EXECUTION
26
15Can the evidence be produced without screenshots or manual assembly?Y
27
16Is the evidence stored consistently and retrievably?N
28
17Does the control require excessive manual effort to execute?Y
29
18Is the IPE extracted systematically, with parameters documented?N
30
19Does the testing process take longer than the control itself?Y
31
Heavy manual effort – simplify or automate
32
SECTION 5 - AUTOMATION POTENTIAL
33
20Can this control be automated in ERP / workflow system?Y
34
21Is the information already available in a report or system log?Y
35
22Can segregation of duties (SoD) replace a manual check?N
36
23Can exception-based monitoring replace routine checking?N
37
Medium automation potential
38
SECTION 6 - PROCESS ALIGNMENT
39
24Is the control aligned with the actual process, not outdated flowcharts?N
40
25Does the process owner understand and accept the control?N
41
26Is the control positioned at the right point in the workflow?Y
42
27Does the control fit global policy and local variations?N
43
28Is there a clear accountable and responsible person appointed to the processesY
44
Weak alignment – misaligned with real process
45
SECTION 7 - MATRIX & GOVERNANCE
46
29Is the control mapped correctly to risk, assertion, and financial impact?N
47
30Is the RCM logical, consistent, and not overloaded with tiny controls?N
48
31Is the testing plan right-sized for the risk level?Y
49
32Do we have any “gold-plated” controls (built beyond what’s needed)?N
50
33Are there conditional controls that can be turned into standard ones?Y
51
Governance weaknesses – re-map risk & assertions
52
Necessity Score2
53
Design Quality Score8
54
Duplication Score3
55
Automation Score2
56
Effort Score4
57
Final ScoreMerge
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100