1 | Department | Project_Name | Scope_Of_Work | PM_Department | Project_Status | Neighborhood | Authorization_Existing | Authorization_FY | Authorization_Future | Grant_Existing | Grant_FY | Grant_Future | GO_Expended | Capital_Year_0 | CapitalYear_1 | Capital_Year_25 | Grant_Expended | Grant_Year_0 | Grant_Year_1 | GrantYear_25 | External_Funds | Total_Project_Budget | ||||
172 | Transportation Department | Bike Share Network Expansion | Expand city's bike share network to connect neighborhoods that are further from frequent, reliable rail transit and support strong demand in employment centers and commercial hubs. | Transportation Department | Implementation Underway | Citywide | 750000 | 0 | 0 | 6650000 | 0 | 0 | 748264 | 0 | 0 | 1736 | 2357937 | 3500000 | 792063 | 0 | 0 | 7400000 | ||||
173 | Transportation Department | Blossom Street | Upgrades to Blossom Street including upgraded lighting, geometric changes for pedestrian safety, roadway resurfacing, and pavement markings including bicyclist accommodations. | Public Works Department | In Design | West End | 0 | 0 | 0 | 2000000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1000000 | 1000000 | 4750000 | 6750000 | ||||
174 | Transportation Department | Boylston Street | Redesign and reconstruct Boylston Street from Ipswich Street south to Park Drive and the Muddy River Crossing. Build protected bike lanes, a mid-block crossing, upgraded signals, replacement lighting and new sidewalks in certain locations. | Transportation Department | In Design | Fenway / Kenmore | 0 | 0 | 0 | 1376299 | 0 | 0 | 0 | 0 | 0 | 0 | 793701 | 0 | 0 | 582598 | 8665052 | 10041351 | ||||
175 | Transportation Department | Centre Street / South Street | Redesign portions of Centre Street and South Street in Jamaica Plain using a Complete Streets approach. | Transportation Department | In Design | Jamaica Plain | 1000000 | 0 | 0 | 0 | 0 | 0 | 341690 | 50000 | 450000 | 158310 | 0 | 0 | 0 | 0 | 0 | 1000000 | ||||
176 | Transportation Department | Dedicated Bus Lanes | Transform several corridors citywide for rapid bus transit, including the construction of dedicated bus lanes on Summer Street, Boylston Street and St. James Street, and Clarendon Street. | Transportation Department | Annual Program | Citywide | 7656300 | 0 | 0 | 5793700 | 0 | 0 | 2593487 | 1300000 | 1300000 | 2462813 | 1500576 | 1000000 | 1200000 | 2093124 | 0 | 13450000 | ||||
177 | Transportation Department | Nubian Square Improvements | Roadway improvements from Shawmut Avenue to Harrison Avenue including six key Nubian Square intersections. The scope of work includes geometric changes, new traffic signal equipment and timing, bike lanes, and streetscape improvements. | Transportation Department | In Design | Roxbury | 922183 | 0 | 0 | 14977817 | 0 | 2000000 | 922070 | 0 | 0 | 113 | 5734288 | 100000 | 0 | 11143529 | 0 | 17900000 | ||||
178 | Transportation Department | Eagle Square | Design for traffic flow and safety improvements in Eagle Square. | Transportation Department | To Be Scheduled | East Boston | 150000 | 0 | 0 | 2000000 | 0 | 0 | 0 | 0 | 0 | 150000 | 0 | 0 | 175000 | 1825000 | 0 | 2150000 | ||||
179 | Transportation Department | Egleston Square | Redesign of Egleston Square featuring widened sidewalks, median realignment, new crosswalks, raised crosswalks and neckdowns, traffic signal improvements, and rehabilitation of the sculpture garden. | Transportation Department | In Design | Roxbury | 6910000 | 0 | 0 | 1000000 | 0 | 0 | 0 | 50000 | 500000 | 6360000 | 944631 | 55369 | 0 | 0 | 0 | 7910000 | ||||
180 | Transportation Department | Electric Charging Stations | Installation of electric vehicle charging stations at various municipal lots. | Transportation Department | Implementation Underway | Citywide | 0 | 0 | 0 | 1400000 | 150000 | 0 | 0 | 0 | 0 | 0 | 203312 | 250000 | 1000000 | 96688 | 0 | 1550000 | ||||
181 | Transportation Department | Green Links | Annual program to create a connected network of pedestrian and bicycle paths that will allow more access to green open spaces. | Transportation Department | Annual Program | Citywide | 356937 | 500000 | 0 | 150116 | 0 | 0 | 268118 | 100000 | 0 | 488819 | 138916 | 0 | 11200 | 0 | 0 | 1007053 | ||||
182 | Transportation Department | JFK / UMASS Station | Study improvements and create a transportation action plan for the MBTA's JFK/UMass Station area. | Transportation Department | Study Underway | Dorchester | 300000 | 0 | 0 | 250000 | 0 | 0 | 0 | 0 | 0 | 300000 | 159143 | 0 | 90857 | 0 | 0 | 550000 | ||||
183 | Transportation Department | Municipal Parking Lots | Lighting, paving, re-striping, and other upgrades to municipal parking lots Citywide. | Transportation Department | To Be Scheduled | Citywide | 1000000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1000000 | 0 | 0 | 0 | 0 | 0 | 1000000 | ||||
184 | Transportation Department | Rapid Bus Transportation Seaport | Develop an action plan and implementation program for rapid bus transit between North Station and the Seaport. | Transportation Department | To Be Scheduled | Multiple Neighborhoods | 0 | 0 | 0 | 260000 | 0 | 0 | 0 | 0 | 0 | 0 | 198509 | 0 | 50000 | 11491 | 0 | 260000 | ||||
185 | Transportation Department | Safe and Reliable Streets | Support anti-congestion efforts Citywide through data collection, safety and public realm improvements. Includes staff support to augment operational needs. Funded by state TNC revenue. | Transportation Department | Annual Program | Citywide | 0 | 0 | 0 | 7477672 | 2850000 | 0 | 0 | 0 | 0 | 0 | 3552816 | 1500000 | 2000000 | 3274856 | 0 | 10327672 | ||||
186 | Transportation Department | Connect Downtown: Public Garden Crossings | Advance planning and design for a Go Boston 2030 priority project that would extend the Southwest Corridor, via on-street bike facilities, to connect with major destinations in Downtown and Beacon Hill. | Transportation Department | In Construction | Multiple Neighborhoods | 0 | 4000000 | 0 | 3250000 | 0 | 0 | 0 | 0 | 1500000 | 2500000 | 250000 | 0 | 1000000 | 2000000 | 0 | 7250000 | ||||
187 | Transportation Department | Traffic Signal Construction at 5 locations | Design and construct safety improvements to various traffic signals throughout the City. | Transportation Department | In Construction | Multiple Neighborhoods | 900000 | 3100000 | 0 | 4000000 | 0 | 0 | 598020 | 0 | 3000000 | 401980 | 0 | 0 | 1500000 | 2500000 | 0 | 8000000 | ||||
188 | Transportation Department | Vision Zero: Neighborhood Slow Streets | Design and construct Neighborhood Slow Street zones throughout the City. | Transportation Department | In Construction | Multiple Neighborhoods | 0 | 0 | 0 | 13095000 | 0 | 0 | 0 | 0 | 0 | 0 | 7487806 | 4842194 | 765000 | 0 | 0 | 13095000 | ||||
189 | Transportation Department | Bikeshare Dock Replacement | Replace portions of City's bikeshare system, including docks, kiosks and bikes. | Transportation Department | Implementation Underway | Citywide | 0 | 0 | 0 | 1771100 | 500000 | 0 | 0 | 0 | 0 | 0 | 1192789 | 578311 | 500000 | 0 | 0 | 2271100 | ||||
190 | Transportation Department | Mission Hill Transportation Planning | Planning for pedestrian improvements. | Transportation Department | Study Underway | Mission Hill | 300000 | 0 | 0 | 0 | 0 | 0 | 114115 | 175000 | 10885 | 0 | 0 | 0 | 0 | 0 | 0 | 300000 | ||||
191 | Transportation Department | Lost Village Streets | Design and construct improvements to roads, sidewalks and signals in the Lost Village section of Charlestown. | Transportation Department | In Construction | Charlestown | 0 | 0 | 0 | 1600000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 600000 | 1000000 | 0 | 1600000 | ||||
192 | Transportation Department | Blue Hill Avenue Multimodal Corridor | On Blue Hill Avenue, the creation of center-running dedicated bus lanes, redesigned Mattapan Square for improved bus connection to the MBTA station, protected bike lanes, signal changes, and sidewalks. | Transportation Department | In Design | Multiple Neighborhoods | 18224000 | 0 | 0 | 0 | 0 | 0 | 0 | 1000 | 5000000 | 13223000 | 0 | 0 | 0 | 0 | 26232000 | 44456000 | ||||
193 | Transportation Department | Southwest Neighborhood Transit Action Plan | Study and develop a Transportation Action Plan for the southwest neighborhoods of Boston. | Transportation Department | Study Underway | Multiple Neighborhoods | 1600000 | 0 | 0 | 0 | 0 | 0 | 10592 | 1000000 | 589408 | 0 | 0 | 0 | 0 | 0 | 0 | 1600000 | ||||
194 | Transportation Department | Fairmount Line Urban Rail Study | Commission a technical analysis on transforming the Fairmount Commuter Rail Line to a subway-like service level. | Transportation Department | Study Underway | Multiple Neighborhoods | 0 | 0 | 0 | 790000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 500000 | 290000 | 0 | 0 | 790000 | ||||
195 | Transportation Department | Safe Routes to Schools | Provide ROW services to support a MassDOT funded SRTS project in the vicinity of the David Ellis School in Roxbury. | Transportation Department | In Design | Multiple Neighborhoods | 100000 | 0 | 0 | 100000 | 0 | 0 | 0 | 0 | 100000 | 0 | 0 | 0 | 0 | 100000 | 2737728 | 2937728 | ||||
196 | Transportation Department | Transportation Planning | Develop and test new mobility strategies that pertain to transportation demand management, electric vehicles, and neighborhood mobility hubs. | Transportation Department | Annual Program | Citywide | 1139813 | 210187 | 0 | 350000 | 0 | 0 | 0 | 250000 | 300000 | 800000 | 0 | 0 | 350000 | 0 | 0 | 1700000 | ||||
197 | Transportation Department | Traffic Signals | Provide traffic signal design services, install or upgrade existing traffic signals and controls, install new control boxes and battery backup equipment. | Transportation Department | Annual Program | Citywide | 12245000 | 3755000 | 0 | 0 | 0 | 0 | 690911 | 3500000 | 4000000 | 7809089 | 0 | 0 | 0 | 0 | 0 | 16000000 | ||||
198 | Transportation Department | Pavement Marking Improvements | Maintain and upgrade pavement markings citywide, including crosswalks, lane markings, and bus lanes. | Transportation Department | Annual Program | Citywide | 0 | 0 | 0 | 6225000 | 0 | 0 | 0 | 0 | 0 | 0 | 1808906 | 1500000 | 1500000 | 1416094 | 0 | 6225000 | ||||
199 | Transportation Department | Accessible Pedestrian Signals | Purchase and install APS devices for new construction, major reconstructions, and by request as outlined in the City's response to the federal mandate. | Transportation Department | Annual Program | Citywide | 1500000 | 0 | 0 | 0 | 0 | 0 | 0 | 500000 | 500000 | 500000 | 0 | 0 | 0 | 0 | 0 | 1500000 | ||||
200 | Transportation Department | Roxbury Resilient Transportation Corridors | Plan and design a transformation of three of Roxbury's central transportation corridors, Melnea Cass Boulevard, Malcolm X Boulevard, and Warren Street, into multimodal routes that center transit and active transportation. | Transportation Department | In Design | Roxbury | 12500000 | 0 | 0 | 20000000 | 0 | 0 | 0 | 0 | 500000 | 12000000 | 0 | 0 | 0 | 20000000 | 0 | 32500000 | ||||
201 | Transportation Department | Tremont/Columbus Phases I & II | Incorporate green infrastructure components to the State's continuation of the center-running bus lane on Columbus Avenue, and construct traffic calming infrastructure on the streets adjacent to Columbus Avenue. | Transportation Department | To Be Scheduled | Multiple Neighborhoods | 3300000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1500000 | 1800000 | 0 | 0 | 0 | 0 | 0 | 3300000 | ||||
202 | Transportation Department | Thoreau Path / Canal Street | Pedestrianization of Canal Street in the Bulfinch Triangle creating a walkable route from Haymarket and Government Center to North Station, pedestrian improvements for the Thoreau Path, and a bike lane between Causeway Street and Commercial Street. | Transportation Department | In Design | Downtown / Government Center | 0 | 0 | 0 | 4785000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 500000 | 4285000 | 0 | 4785000 | ||||
203 | Transportation Department | Safety Surge | Design, engineering, and construction work for significantly increased roadway safety infrastructure across the city, focused on speed hump construction, traffic signal work at intersections, and raised crosswalks or other ADA ramp work. | Transportation Department | In Construction | Citywide | 0 | 7000000 | 0 | 8015655 | 0 | 0 | 0 | 0 | 2500000 | 4500000 | 1953912 | 3500000 | 2561743 | 0 | 0 | 15015655 | ||||
204 | Transportation Department | Parking Meter Replacement | Purchase new parking meters and upgrade existing multi-space parking meters. | Transportation Department | Implementation Underway | Citywide | 0 | 0 | 0 | 7000000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1000000 | 4000000 | 2000000 | 0 | 7000000 | ||||
205 | Public Works Department | Amory Street Extension and Canterbury Street | Reconstruct road, sidewalks, and lighting from Amory Street to the end and also sidewalk and safety improvements at intersection of Canterbury Street, Neponset Avenue, and Bourne Street. | Public Works Department | In Construction | Multiple Neighborhoods | 1705000 | 0 | 0 | 0 | 0 | 0 | 0 | 1500000 | 205000 | 0 | 0 | 0 | 0 | 0 | 0 | 1705000 | ||||
206 | Public Works Department | Boylston Street Sidewalks | Design and construct sidewalk and/or streetscape improvements on Boylston Street. | Public Works Department | Annual Program | Back Bay | 1239000 | 4000000 | 0 | 3761000 | 0 | 0 | 0 | 0 | 3000000 | 2239000 | 1775751 | 500000 | 500000 | 985249 | 0 | 9000000 | ||||
207 | Public Works Department | Cambridge Street Bridge | Rehabilitate bridge, performing repairs as needed. | Public Works Department | To Be Scheduled | Charlestown | 3000000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 500000 | 2500000 | 0 | 0 | 0 | 0 | 16632000 | 19632000 | ||||
208 | Public Works Department | Commonwealth Avenue Phase 3 and 4 | Design and reconstruct Commonwealth Avenue from Packard’s Corner to Kelton Street, with the addition of a cycle track. State construction funding anticipated. | Public Works Department | To Be Scheduled | Allston / Brighton | 2500000 | 0 | 0 | 0 | 0 | 0 | 1040593 | 0 | 0 | 1459407 | 0 | 0 | 0 | 0 | 0 | 2500000 | ||||
209 | Public Works Department | Commonwealth Avenue Phase 3B | Construction of pedestrian and bicyclist safety measures on Commonwealth Avenue at and near the intersection of Harvard Avenue. | Public Works Department | To Be Scheduled | Allston / Brighton | 0 | 1000000 | 10000000 | 0 | 0 | 0 | 0 | 0 | 0 | 11000000 | 0 | 0 | 0 | 0 | 0 | 11000000 | ||||
210 | Public Works Department | Congress Street and Sleeper Street | Reconstruct Congress Street from Fort Point Channel to West Service Road and Sleeper Street to Complete Streets standards where applicable, in order to provide safe multimodal streets, including; new sidewalks, street lights, trees and street furniture. | Public Works Department | In Construction | South Boston | 3000000 | 2000000 | 0 | 5000000 | 0 | 0 | 0 | 0 | 1000000 | 4000000 | 78397 | 150000 | 1000000 | 3771603 | 0 | 10000000 | ||||
211 | Public Works Department | Cummins Highway | Reconstruct road, make traffic improvements, install new pedestrian ramps, enhance bike access, install new tree plantings, and improve lighting from River Street in Mattapan Square to Harvard Street. | Public Works Department | In Construction | Mattapan | 0 | 0 | 0 | 31306311 | 0 | 0 | 0 | 0 | 0 | 0 | 15535 | 10000000 | 12000000 | 9290776 | 0 | 31306311 | ||||
212 | Public Works Department | District Yard Improvements | Facility assessment and improvements to the City's district yards utilized by the Public Works Department. | Public Works Department | To Be Scheduled | Multiple Neighborhoods | 1200000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 150000 | 1050000 | 0 | 0 | 0 | 0 | 0 | 1200000 | ||||
213 | Public Works Department | Downtown Crossing | Design improvements to the Washington Street/Summer Street/Winter Street intersections, including reconstruction of the roadway, implementation of a pedestrian zone or shared street, and security improvements. | Public Works Department | In Design | Downtown / Government Center | 2000000 | 0 | 0 | 0 | 0 | 0 | 500390 | 500000 | 0 | 999610 | 0 | 0 | 0 | 0 | 0 | 2000000 | ||||
214 | Public Works Department | East Eagle Street Shoreline | Shoreline stabilization along Chelsea Creek near East Eagle Street. | Public Works Department | In Design | East Boston | 538000 | 0 | 0 | 0 | 0 | 0 | 0 | 150000 | 300000 | 88000 | 0 | 0 | 0 | 0 | 646000 | 1184000 | ||||
215 | Public Works Department | Columbia Road | Develop a master plan to create an active, green transportation corridor along Columbia Road that connects Franklin Park and the waterfront, via the historic Emerald Necklace. | Public Works Department | In Design | Multiple Neighborhoods | 0 | 0 | 0 | 11000000 | 0 | 0 | 0 | 0 | 0 | 0 | 61341 | 1500000 | 0 | 9438659 | 0 | 11000000 | ||||
216 | Public Works Department | Footpath and Stairways | Conduct assessment of footpaths and stairways throughout the City followed by reconstruction. | Public Works Department | Annual Program | Citywide | 3530000 | 470000 | 0 | 0 | 0 | 0 | 458533 | 250000 | 750000 | 2541467 | 0 | 0 | 0 | 0 | 0 | 4000000 | ||||
217 | Public Works Department | Harrison Avenue Improvements | Road reconstruction improvements to Harrison Avenue between East Berkeley Street and Herald Street. | Public Works Department | In Construction | South End | 0 | 0 | 0 | 6264050 | 0 | 0 | 0 | 0 | 0 | 0 | 100000 | 2000000 | 4000000 | 164050 | 0 | 6264050 | ||||
218 | Public Works Department | McArdle Bridge | Design phase of bridge structure rehabilitation. | Public Works Department | In Design | East Boston | 15000000 | 0 | 0 | 0 | 0 | 0 | 21919 | 1000000 | 7000000 | 6978081 | 0 | 0 | 0 | 0 | 0 | 15000000 | ||||
219 | Public Works Department | New Market One Ways | Redesign Massachusetts Avenue between Melnea Cass Boulevard and Theodore Glynn Way for safety improvements that improve walking, biking, and public transit access. | Public Works Department | To Be Scheduled | Roxbury | 850000 | 0 | 0 | 0 | 0 | 0 | 52990 | 50000 | 350000 | 397010 | 0 | 0 | 0 | 0 | 0 | 850000 | ||||
220 | Public Works Department | North Washington Street Bridge | Design and construction of a new bridge that will replace the existing structure. State and federal construction funds awarded. | Public Works Department | In Construction | Charlestown | 9184468 | 0 | 0 | 35270000 | 0 | 0 | 5673066 | 100000 | 0 | 3411402 | 20959982 | 3000000 | 310018 | 11000000 | 178067519 | 222521987 | ||||
221 | Public Works Department | Northern Avenue Bridge | Re-build the bridge and preserve certain elements of the historic structure while creating a transformative multi-modal bridge that prioritizes pedestrians and shared public space. | Public Works Department | In Design | South Boston | 10000000 | 15000000 | 0 | 21000000 | 0 | 0 | 0 | 80000 | 5000000 | 19920000 | 10027789 | 0 | 7000000 | 3972211 | 0 | 46000000 | ||||
222 | Public Works Department | Retaining Walls | Construction funds to support a multi-year capital improvement program to repair and maintain retaining walls in the public right-of-way. | Public Works Department | Annual Program | Citywide | 2200000 | 0 | 0 | 0 | 0 | 0 | 565504 | 0 | 0 | 1634496 | 0 | 0 | 0 | 0 | 0 | 2200000 | ||||
223 | Public Works Department | State Street | Reconstruct road, sidewalks, and lighting from Congress Street to Rose Kennedy Greenway. | Public Works Department | In Construction | Downtown / Government Center | 5000000 | 1000000 | 0 | 2700000 | 0 | 0 | 0 | 0 | 1000000 | 5000000 | 0 | 0 | 1000000 | 1700000 | 0 | 8700000 | ||||
224 | Public Works Department | Storm Water Pollution Study | Engineering study to identify methods to eliminate storm water pollution. | Public Works Department | To Be Scheduled | Citywide | 150000 | 350000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 500000 | 0 | 0 | 0 | 0 | 0 | 500000 | ||||
225 | Public Works Department | Street Lighting Assessment | Implement a system wide structural assessment on all City street lighting infrastructure. | Public Works Department | Implementation Underway | Citywide | 1000000 | 0 | 0 | 0 | 0 | 0 | 13500 | 0 | 986500 | 0 | 0 | 0 | 0 | 0 | 0 | 1000000 | ||||
226 | Public Works Department | Sullivan Square / Rutherford Avenue | Engineering and design services to provide for corridor-wide transportation improvements. State and federal funding anticipated. | Public Works Department | In Design | Charlestown | 8206000 | 0 | 0 | 4409403 | 0 | 0 | 4083498 | 250000 | 750000 | 3122502 | 3701283 | 100000 | 200000 | 408120 | 197759449 | 210374852 | ||||
227 | Public Works Department | Summer Street Phase 2 | Continuation of Crossroads Initiative at Summer Street to improve roadway, sidewalks, street lighting, and bicyclist safety. Phase 1 scope included area from Fort Point Channel to Boston Wharf Road. Phase 2 will extend from BCEC towards South Boston. | Public Works Department | To Be Scheduled | South Boston | 0 | 0 | 0 | 600000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 600000 | 0 | 600000 | ||||
229 | Public Works Department | Massachusetts Avenue and Melnea Cass Boulevard Intersection | Re-design the intersection of Massachusetts Avenue and Melnea Cass Boulevard to improve pedestrian, bicycle and vehicular safety. | Public Works Department | To Be Scheduled | Multiple Neighborhoods | 1500000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 500000 | 1000000 | 0 | 0 | 0 | 0 | 0 | 1500000 | ||||
231 | Public Works Department | Inventory Management Program | Purchase and implement an inventory management system for street lighting tools and supplies. | Public Works Department | Implementation Underway | Citywide | 500000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 500000 | 0 | 0 | 0 | 0 | 0 | 0 | 500000 | ||||
233 | Public Works Department | Street Lighting Infrastructure Upgrades and Installation | Installation of street lights in various locations. | Public Works Department | Annual Program | Citywide | 10640900 | 8359100 | 6000000 | 0 | 0 | 0 | 2185152 | 3000000 | 6000000 | 13814848 | 0 | 0 | 0 | 0 | 0 | 25000000 | ||||
234 | Public Works Department | Chinatown Sidewalk Improvements | Improve the condition of sidewalks in historic Chinatown neighborhood. | Public Works Department | In Design | Chinatown | 3000000 | 0 | 0 | 0 | 0 | 0 | 24175 | 50000 | 500000 | 2425825 | 0 | 0 | 0 | 0 | 0 | 3000000 | ||||
235 | Public Works Department | Bussey Street Reconstruction Phase I | Phase I of a reconstruction of Bussey Street in the Arboretum, which will improve sidewalk conditions, add lighting to the street, and explore adding active transportation infrastructure. | Public Works Department | To Be Scheduled | Multiple Neighborhoods | 250000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 250000 | 0 | 0 | 0 | 0 | 0 | 250000 | ||||
236 | Public Works Department | Green Infrastructure Pilot Improvements | Design, engineering, and construction work to implement green infrastructure solutions in targetable locations. | Public Works Department | In Construction | Citywide | 1600000 | 0 | 0 | 0 | 0 | 0 | 0 | 700000 | 500000 | 400000 | 0 | 0 | 0 | 0 | 0 | 1600000 | ||||
237 | Public Works Department | Moon Island Causeway | Engineering and construction work to ensure the causeway to Moon Island remains in a state of good repair. | Public Works Department | In Construction | Harbor Islands | 2000000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2000000 | 0 | 0 | 0 | 0 | 0 | 0 | 2000000 | ||||
238 | Public Works Department | Austin Street Bridge | Engineering and construction work to ensure the Austin Street Bridge remains in a state of good repair. | Public Works Department | To Be Scheduled | Charlestown | 5000000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 500000 | 4500000 | 0 | 0 | 0 | 0 | 0 | 5000000 | ||||
239 | Public Works Department | Blakemore Street Bridge | Engineering and construction work to ensure the Blakemore Street Bridge remains in a state of good repair. | Public Works Department | To Be Scheduled | Roslindale | 750000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 500000 | 250000 | 0 | 0 | 0 | 0 | 0 | 750000 | ||||
240 | Public Works Department | Fort Point Channel Bridges | Engineering and construction work to ensure the three bridges over the Fort Point Channel remain in a state of good repair, including the Summer Street, Congress Street, and Moakley Bridges. | Public Works Department | In Design | South Boston | 5000000 | 0 | 15000000 | 0 | 0 | 0 | 0 | 0 | 1000000 | 19000000 | 0 | 0 | 0 | 0 | 0 | 20000000 | ||||
241 | Public Works Department | Massachusetts Ave. / Huntington Ave. Bridge | Engineering and construction work to ensure the overpass bridge at the intersection of Massachusetts Avenue and Huntington Avenue remains in a state of good repair. | Public Works Department | To Be Scheduled | Fenway / Kenmore | 2000000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2000000 | 0 | 0 | 0 | 0 | 0 | 2000000 | ||||
242 | Public Works Department | Shawmut Avenue Bridge | Engineering and construction work to ensure the Shawmut Avenue Bridge remains in a state of good repair. | Public Works Department | To Be Scheduled | Multiple Neighborhoods | 1100000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1100000 | 0 | 0 | 0 | 0 | 0 | 1100000 | ||||
284 | Transportation Department | Safe Streets for All | Design and construct safety improvements at 8 specific intersections across the city, in order to mitigate unsafe travel and improve pedestrian and active transportation safety. | Transportation Department | In Design | Multiple Neighborhoods | 2500000 | 0 | 0 | 9000000 | 0 | 0 | 0 | 0 | 0 | 2500000 | 0 | 0 | 0 | 9000000 | 0 | 11500000 | ||||
289 | Transportation Department | Reconnecting Communities | Conduct a feasibility study and initial design for a new park built on a deck over the I-90 highway and MBTA tracks between Shawmut Avenue and Washington Street. | Transportation Department | Study Underway | Chinatown | 600000 | 0 | 0 | 0 | 0 | 0 | 0 | 200000 | 200000 | 200000 | 0 | 0 | 0 | 0 | 1800000 | 2400000 | ||||
299 | Transportation Department | Dorchester Greenway Study | Plan and design a linear park through Dorchester near the covered portion of the MBTA Red Line, supported with MassTrails grant. | Transportation Department | Study Underway | Dorchester | 368250 | 0 | 0 | 0 | 0 | 0 | 13595 | 300000 | 54655 | 0 | 0 | 0 | 0 | 0 | 300000 | 668250 | ||||
303 | Public Works Department | Long Island Bridge | Construct a new bridge from Moon Island to Long Island. | Public Works Department | In Design | Harbor Islands | 50000000 | 0 | 58758144 | 0 | 0 | 0 | 0 | 50000 | 0 | 108708144 | 0 | 0 | 0 | 0 | 0 | 108758144 | ||||
304 | Transportation Department | Traffic Signal Communications Improvements | Install fiber optic cable and replaces existing traffic controller units at 104 intersections to improve signal management. | Transportation Department | Implementation Underway | Citywide | 1880000 | 0 | 0 | 0 | 0 | 0 | 0 | 1800000 | 80000 | 0 | 0 | 0 | 0 | 0 | 0 | 1880000 | ||||
326 | Public Works Department | Wood Avenue Safety Improvements | Design and construct safety improvements along Wood Avenue and in the surrounding neighborhoods. | Public Works Department | In Design | Hyde Park | 2000000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1000000 | 1000000 | 0 | 0 | 0 | 0 | 0 | 2000000 | ||||
327 | Public Works Department | Jones Avenue Neighborhood Improvements | Reconstruct the existing sidewalks and roadways on parts of Jones Avenue, Jacobs Street, Mascot Street, Mountain Avenue, Ballou Avenue, and Willowwood Street. | Public Works Department | In Design | Dorchester | 5200000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 5200000 | 0 | 0 | 0 | 0 | 0 | 5200000 | ||||
328 | Transportation Department | Safety Surge: Safer Signals | Make systemic safety improvements to traffic signals at 50 locations across the City. The project will focus on upgrading locations in underserved communities and on improving conditions for all roadway users along the City’s High-Crash Network. | Transportation Department | In Design | Citywide | 3600000 | 0 | 0 | 14400000 | 0 | 0 | 0 | 0 | 1200000 | 2400000 | 0 | 0 | 0 | 14400000 | 0 | 18000000 | ||||
333 | Public Works Department | Sidewalk and Ramp Reconstruction FY25-27 | Program for sidewalk reconstruction and repair including responses to 311 requests as well as planned reconstruction of brick and concrete sidewalks for the 2025, 2026, and 2027 construction seasons. | Public Works Department | Annual Program | Citywide | 11650000 | 2100000 | 2250000 | 24500000 | 3200000 | 0 | 0 | 5000000 | 5500000 | 5500000 | 0 | 3200000 | 12250000 | 12250000 | 0 | 43700000 | ||||
334 | Public Works Department | Roadway Reconstruction and Resurfacing FY25-27 | Maintain citywide streets with resurfacing and reconstruction efforts. | Public Works Department | Annual Program | Citywide | 25300000 | 16200000 | 10000000 | 0 | 10000000 | 30500000 | 0 | 13750000 | 13750000 | 24000000 | 0 | 10250000 | 10250000 | 20000000 | 0 | 92000000 | ||||
340 | Public Works Department | Bridge Repairs | Ongoing repairs at various City-owned bridges as needed to bring the portfolio of 40 bridges to a state of good repair. This includes proactive maintenance and annual maintenance. | Public Works Department | Annual Program | Citywide | 48000000 | 2000000 | 0 | 0 | 0 | 0 | 0 | 0 | 12000000 | 38000000 | 0 | 0 | 0 | 0 | 0 | 50000000 | ||||
341 | Public Works Department | Transit Project-Related Infrastructure Improvements | Design and include enhancements to MBTA driven project on city streets, including green infrastructure, bike lanes, and sidewalk enhancements. | Public Works Department | To Be Scheduled | Citywide | 10000000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 10000000 | 0 | 0 | 0 | 0 | 0 | 10000000 | ||||
342 | Public Works Department | Lower Roxbury Neighborhood Safety Improvements | Roadway safety and crossing improvements on Harrison Avenue, Washington Street, Shawmut Avenue, Tremont Street, and Northampton Street. Install bike lanes on Northampton Street and Shawmut Avenue. | Public Works Department | In Construction | Roxbury | 0 | 0 | 0 | 2958000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1458000 | 1500000 | 0 | 0 | 2958000 | ||||
343 | Public Works Department | Pleasant Street Neighborhood Safety Improvements | Roadway safety improvements on Pleasant Street from Sawyer Avenue to the intersection with East Cottage Street. | Public Works Department | In Construction | Dorchester | 0 | 0 | 0 | 2500000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1000000 | 1500000 | 0 | 0 | 2500000 | ||||
345 | Transportation Department | Albany St Bike Accommodations | Construct bike facilities on Albany Street from Melnea Cass Boulevard to Frontage Road. | Transportation Department | In Construction | South End | 0 | 0 | 0 | 550000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 550000 | 0 | 0 | 550000 | ||||
346 | Transportation Department | Charles Street North | Design for a reconstructed Charles Street between Beacon Street and Cambridge Street, including bike lanes and widened sidewalks. | Transportation Department | Study Underway | Beacon Hill | 0 | 650000 | 0 | 100000 | 0 | 0 | 0 | 0 | 150000 | 500000 | 0 | 0 | 100000 | 0 | 0 | 750000 | ||||
350 | Public Works Department | Green Routes to 2 Schools | Design and construct green infrastucture based improvements on the sidewalk and roadway to create safe routes to the Trotter and Higginson-Lewis. | Public Works Department | In Design | Roxbury | 0 | 0 | 0 | 1800000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 250000 | 1000000 | 550000 | 0 | 1800000 | ||||
366 | Transportation Department | East Boston Safe Multimodal Corridors | Improve safety and accessibility along key north-south (Meridian/Border Streets) and east-west (Bennington/Saratoga Streets) corridors through quick-build pilot interventions, utilizing awarded federal funds. | Transportation Department | New Project | East Boston | 0 | 708134 | 0 | 0 | 2832532 | 0 | 0 | 0 | 250000 | 458134 | 0 | 0 | 1000000 | 1832532 | 0 | 3540666 | ||||
367 | Transportation Department | Recharge Boston: Public EV Charging | Install a minimum of 300 EV charging ports, a combination of Level II and Level III EV chargers, across the City of Boston utilizing awarded federal funds. | Transportation Department | New Project | Citywide | 0 | 3750000 | 0 | 0 | 15000000 | 0 | 0 | 0 | 500000 | 3250000 | 0 | 0 | 0 | 15000000 | 0 | 18750000 | ||||
368 | Public Works Department | Connect Downtown: Columbus Ave Phase I | Make safety and state of good repair improvements to Columbus Avenue between Massachusetts Avenue and Clarendon Street, including upgrading curb ramps, adding raised crossings at unsignalized intersections, and upgrading striping. | Public Works Department | New Project | Multiple Neighborhoods | 0 | 1700000 | 0 | 0 | 0 | 0 | 0 | 0 | 150000 | 1550000 | 0 | 0 | 0 | 0 | 0 | 1700000 | ||||
369 | Public Works Department | Connect Downtown: Charles South/Tremont | Transform Charles Street and Tremont Street between Boylston Street and Herald Street into a pedestrian and bicycle-friendly street that aligns with neighborhood goals. | Public Works Department | New Project | Multiple Neighborhoods | 0 | 2250000 | 0 | 0 | 0 | 0 | 0 | 0 | 250000 | 2000000 | 0 | 0 | 0 | 0 | 0 | 2250000 | ||||
370 | Public Works Department | Poplar Street Safety Improvements Phase II | Update ramps on Poplar Street and introduce safe raised crossings at five key locations, including close to a school. | Public Works Department | New Project | Roslindale | 0 | 1500000 | 0 | 0 | 0 | 0 | 0 | 0 | 100000 | 1400000 | 0 | 0 | 0 | 0 | 0 | 1500000 | ||||
371 | Public Works Department | Brighton Streets | Replace the fencing and make sidewalk and roadway improvements along Newton Street, Vineland Street, and Riverview Road, utilizing ARPA funds. | Public Works Department | New Project | Allston / Brighton | 0 | 0 | 0 | 0 | 3842000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 500000 | 3342000 | 0 | 3842000 | ||||
372 | Public Works Department | Belvidere / Dalton Street | Reconstruct the corridor of Belvidere Street, between Huntington Avenue and Dalton Street. | Public Works Department | New Project | Back Bay | 0 | 350000 | 0 | 0 | 0 | 0 | 0 | 0 | 150000 | 200000 | 0 | 0 | 0 | 0 | 260000 | 610000 | ||||
373 | Public Works Department | Commonwealth Avenue Mall Crosswalks | Design and reconstruction seven intersections along the Commonwealth Ave Mall between Hereford Street and Berkeley Street to improve pedestrian walking experience and improve safety. | Public Works Department | New Project | Back Bay | 0 | 600000 | 0 | 0 | 0 | 0 | 0 | 0 | 150000 | 450000 | 0 | 0 | 0 | 0 | 0 | 600000 | ||||
374 | Public Works Department | Citywide Street Safety Design Services | Design and engineering for street safety improvements across the City, including intersection redesign, raised crossings, speedhumps, bikelanes, and other traffic calming strategies to promote Vision Zero. | Public Works Department | New Project | Citywide | 2000000 | 8000000 | 0 | 3000000 | 0 | 0 | 0 | 0 | 3300000 | 6700000 | 0 | 0 | 1250000 | 1750000 | 0 | 13000000 | ||||
375 | Public Works Department | Citywide Street Safety Construction Services | Construction of street safety improvements across the City, including intersection redesign, raised crossings, speedhumps, bikelanes, and other traffic calming strategies to promote Vision Zero. | Public Works Department | New Project | Citywide | 2942178 | 7057822 | 0 | 5000000 | 0 | 0 | 0 | 0 | 3300000 | 6700000 | 0 | 0 | 1750000 | 3250000 | 0 | 15000000 | ||||
385 | Public Works Department | District 7 Maintenance Yard | Improvements and repairs to the roof and garage, including replacement of the door and interior heating systems. | Public Works Department | New Project | Roxbury | 0 | 750000 | 0 | 0 | 0 | 0 | 0 | 0 | 250000 | 500000 | 0 | 0 | 0 | 0 | 0 | 750000 | ||||
386 | Public Works Department | Highland Ave District Boiler Replacement | Replace boiler. | Public Works Department | New Project | Roxbury | 0 | 1000000 | 0 | 0 | 0 | 0 | 0 | 0 | 250000 | 750000 | 0 | 0 | 0 | 0 | 0 | 1000000 | ||||
392 | ||||||||||||||||||||||||||