RAA-ONE CONSTRUCTION & ENGINEERING PTE LTD
3
03-54, 5 Soon Lee Street, Pioneer Point Singapore - 627607
4
www.raaonegroup.com & raaone77@gmail.com Tel No. : 65389517
5
QUOTATION
6
7
To,
KIM HUA CONSTRUCTION PTE. LTD.
12 YISHUN AVENUE 9
#11-06
NINE RESIDENCES
SINGAPORE (768894)
Date 27/01/2025
8
Q Ref No RAA/20245/0002
9
Project24 Peck Seah Street hotel
10
11
Quotation For To supply material, labour and Tools for the below items
12
S.NoItem DescriptionQTY
Unit Price ($)
Total Price ($)
13
1Preliminary & Safety Lot1 SGD 75,000.00 SGD 75,000.00
14
2Installation And connection Of Mitsubishi FCU with Support and PVC drain paipe Ceeling Duct type Nos234 SGD 2,400.00 SGD 561,600.00
15
3Supply and Install, conection, testing & Commossioning Ceeling Duct type FCU crac unitNos3 SGD 2,000.00 SGD 6,000.00
16
4Supply and Install, conection, testing & Commossioning 2 nos Horizontal PHAU & 3 nos Celling Mounted Duct type PFCU Nos5 SGD 15,000.00 SGD 75,000.00
17
5Supply and Install, conection, testing & Commossioning VRV/F ACCUNos28 SGD 14,000.00 SGD 392,000.00
18
6Supply and Install, conection, testing & Commossioning CU Split DX type Nos3 SGD 4,500.00 SGD 13,500.00
19
7Supply Install Piping and Electrical work for VRV/F & Split DX type airconditioning indoor and outdoor unit lot 1 SGD 1,677,000 SGD 1,677,000.00
20
8Supply And install MV Fan Nos79 SGD 3,617.00 SGD 285,743.00
21
9Supply And install Silencer for mv fan Nos86 SGD 1,170.00 SGD 100,620.00
22
10Supply lay and connection Pannel, Isolator, Cable, PVC tray and Trunking for All ACMV Electrical Work,Lot1 SGD 350,000.00 SGD 350,000.00
23
11Supply and Install GI Duct with support and bracket Lot1 SGD 450,000.00 SGD 450,000.00
24
SGD -
25
Total Price SGD 3,986,463.00
26
Terms and Conditions
27
1. Variations works not included in the above, shall be quoted/billed separately.
2. This Quotation validity 30 days only.
28
3.Amount quoted above is excluding of GST. down payment 30%
29
4.Utilities comprising, but not limited to, water and electricity shall be provided free of charge throughout the entire work period.
30
5.Working hours shall be same rates including Sunday, PH and over time
31
6.payments should be every two weeks from the invoice 7 days payments
32
7.Any work at hight avobe 4m, access and platform will provide by maincon.
33
9. Any kind of Hoisting, Mobalization , Transportation is not under this qoutation.
34
35
36
Note: kindly refer our attached price details which is in the email together this quote !
37
Yours faithfully;
38
RAA-ONE CONSTRUCTION & ENGINEERING PTE LTD
39
(This is a computer generated quote, signature not required)
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100