| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | AA | AB | AC | AD | AE | AF | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | NO | USER | PENGADAAN | Gudang | ||||||||||||||||||||||||||||
2 | Bidang | Diskripsi Permintaan | No WO | JUDUL WO | No PR | Deskripsi | Tgl. Buat PR | No Line | Item Number | Nama Barang & Spesifikasi | Jumlah | Satuan | Nama Pemroses | No PO Kontrak | Tangal PO (DD-MM-YYYY) | No. PO System | Nama Vendor/Penyedia | Harga Satuan (Non ppn) | Sub Total PO (Non ppn) | ppn 10%/11% | Sub Total PO | Waktu Pekerjaan | Tanggal Penyerahan Pekerjaan | Bayar /Belum Bayar | Tanggal Masuk Gudang | NO. BAP | TGGL BAP | Jumlah Kedatangan Fisik | Satuan | Keterangan | ||
3 | 1. | ELEKTRIK | USULAN PENGADAAN MATERIAL KABEL PLTU ROPA (WO52448) | WO52448 | PAM : PENGGANTIAN KABEL POMPA SUMUR DEPAN | PR2356 | USULAN PENGADAAN MATERIAL KABEL PLTU ROPA (WO52448) | 2/23/22 15:16 | 1 | 100001768 | CABLE NYY, 3 X 2.5 MM | 100 | M | ARDIAN | 016.BL/PLTU-ROPA/PJBS/II/2022 | 16 Februari 2022 | PO2443 | PT. TRI PILLAR JAYASAKTI | Rp 37.100 | Rp 3.710.000 | Rp 371.000 | Rp 4.081.000 | 21 | 04-Mar-22 | Bayar AKB Maret | 23-Feb-22 | ||||||
4 | 2. | MEKANIK | USULAN PENGADAAN MATERIAL PLAT LUBANG PLTU ROPA | PR2357 | USULAN PENGADAAN MATERIAL PLAT LUBANG PLTU ROPA | 2/23/22 13:44 | 1 | 100001129 | PLAT, LUBANG, SS304, DIA 2-3 MM, P 1200 MM, L 2400 MM, T 0.8 MM | 2 | SHEET | ARDIAN | 017.BL/PLTU-ROPA/PJBS/II/2022 | 17 Februari 2022 | PO2452 | PT. TRI PILLAR JAYASAKTI | Rp 2.875.000 | Rp 5.750.000 | Rp 575.000 | Rp 6.325.000 | 21 | 04-Mar-22 | Bayar AKB Maret | 23-Feb-22 | ||||||||
5 | 3. | MEKANIK | USULAN PENGADAAN MATERIAL POMPA PLTU ROPA | PR2358 | USULAN PENGADAAN MATERIAL POMPA PLTU ROPA | 2/23/22 13:57 | 1 | 100002297 | SUBMERSIBLE PUMP, HS 3.75.5, TSURUMI | 1 | SET | 15-Feb-22 | ||||||||||||||||||||
6 | 4. | MEKANIK | USULAN PENGADAAN MATERIAL MECHANICAL SEAL PLTU ROPA | PR2359 | USULAN PENGADAAN MATERIAL MECHANICAL SEAL PLTU ROPA | 3/15/22 14:06 | 1 | 100002298 | SEAL,MECHANICAL, NS-30-18, FOR WWTP GRUNDFOS | 2 | EA | READY UNIT | ||||||||||||||||||||
7 | 5. | INVENTORY | USULAN PENGADAAN MATERIAL GLOVES, RAG & THINNER PLTU ROPA | PR2360 | USULAN PENGADAAN MATERIAL GLOVES, RAG & THINNER PLTU ROPA | 3/15/22 14:10 | 1 | 100000102 | GLOVES,PURPOSE,GENERAL, DOTING, COTTON | 120 | PAIR | READY UNIT | ||||||||||||||||||||
8 | 2 | 100000084 | RAG, WIPING, COLOUR, COTTON | 50 | KG | |||||||||||||||||||||||||||
9 | 3 | 100000701 | THINNER, A SPESIAL, 1 LITER/CAN | 10 | CAN | |||||||||||||||||||||||||||
10 | 6. | ELEKTRIK | USULAN PENGADAAN MATERIAL STOP KONTAK UNTUK AREA TURBIN FLOOR PLTU ROPA (WO52997) | WO52997 | PAM : PENGGANTIAN STOP KONTAK UNTUK AREA TURBIN FLOOR & BOILER | PR2361 | USULAN PENGADAAN MATERIAL STOP KONTAK UNTUK AREA TURBIN FLOOR PLTU ROPA (WO52997) | 2/21/22 14:20 | 1 | 100000219 | STOP CONTACT, TEMPEL OUTBOW, PANASONIC | 10 | EA | ARDIAN | 020.BL/PLTU-ROPA/PJBS/II/2022 | 25 Februari 2022 | PO2453 | PT. TRI PILLAR JAYASAKTI | Rp 63.000 | Rp 630.000 | Rp 63.000 | Rp 693.000 | 21 | 19-Mar-22 | Bayar aKB April | 15-Mar-22 | ||||||
11 | 7. | MEKANIK | USULAN PENGADAAN MATERIAL SOLVENT UNTUK BELT CONVEYOR PLTU ROPA | PR2362 | USULAN PENGADAAN MATERIAL SOLVENT UNTUK BELT CONVEYOR PLTU ROPA | 15-Feb-22 | 1 | 100002294 | SOLVENT, CF-R4, 800 ML | 25 | CAN | ARDIAN | 021.BL/PLTU-ROPA/PJBS/II/2022 | 25 Februari 2022 | PO2454 | PT. TRI PILLAR JAYASAKTI | Rp 894.000 | Rp 22.350.000 | Rp 2.235.000 | Rp 24.585.000 | 14 | 10-Mar-22 | Bayar aKB April | READY UNIT | ||||||||
12 | 8. | ELEKTRIK | USULAN PENGADAAN MATERIAL PUSH BUTTON UNTUK VACUM PRIMING PUMP #2 PLTU ROPA (WO52996) | WO52996 | PAM : PENGGANTIAN PUSH BUTTON COMPLETED LAMPU LED DI PANEL VACUUM PRIMING PUMP #2 | PR2363 | USULAN PENGADAAN MATERIAL PUSH BUTTON UNTUK VACUM PRIMING PUMP #2 PLTU ROPA (WO52996) | 3/22/22 14:47 | 1 | 100002295 | CONTACT BLOCK, NORMALLY OPEN (NO), LTH 10 A, INCLUDE LED LAMP (GREEN), 230 VAC, 14 MILIAMPERE | 4 | EA | ARDIAN | 022.BL/PLTU-ROPA/PJBS/II/2022 | 25 Februari 2022 | PO2450 | PT. TRI PILLAR JAYASAKTI | Rp 306.250 | Rp 1.225.000 | Rp 122.500 | Rp 2.695.000 | 14 | 10-Mar-22 | Bayar aKB April | 15-Mar-22 | ||||||
13 | 2 | 100002296 | CONTACT BLOCK, NORMALLY CLOSE (NC), LTH 10 A, INCLUDE LED LAMP (RED), 230 VAC, 14 MILIAMPERE | 4 | EA | Rp 306.250 | Rp 1.225.000 | Rp 122.500 | ||||||||||||||||||||||||
14 | 9. | MEKANIK | USULAN PENGADAAN MATERIAL ACCESORIES LINE PVC UNTUK CHLORINE PUMP PLTU ROPA | PR2364 | USULAN PENGADAAN MATERIAL ACCESORIES LINE PVC UNTUK CHLORINE PUMP PLTU ROPA | 15-Mar-22 | 1 | 100000999 | VALVE,BALL, SCH 40, PVC, 2 IN | 2 | EA | ARDIAN | 008.PL/PLTU-ROPA/II/2022 | 23 Februari 2022 | PO2455 | TOKO GLORYA ENDE | Rp 215.000 | Rp 430.000 | Rp 650.000 | 1 | 23-Feb-22 | Cek | 23-Feb-22 | |||||||||
15 | 2 | 100000376 | SOCK, PIPE OR TUBE, PVC 2" | 4 | EA | Rp 25.000 | Rp 100.000 | |||||||||||||||||||||||||
16 | 3 | 100002299 | CAP DOP, PVC AW, 2 INCH | 4 | EA | Rp 30.000 | Rp 120.000 | |||||||||||||||||||||||||
17 | 10. | MEKANIK | USULAN PENGADAAN MATERIAL MAINTANANCE PLTU ROPA | PR2366 | USULAN PENGADAAN MATERIAL MAINTANANCE PLTU ROPA | 9-Mar-22 | 1 | 100002300 | VALVE,BALL, PVC, 4 IN | 2 | EA | ARDIAN | 010.PL/PLTU-ROPA/II/2022 | 24 Februari 2022 | PO2456 | TOKO GLORYA ENDE | Rp 875.000 | Rp 1.750.000 | Rp 26.285.000 | 1 | 24-Feb-22 | Cek | READY UNIT | |||||||||
18 | 2 | 100002302 | FOOT VALVE, 1 IN, KUNINGAN | 2 | EA | Rp 150.000 | Rp 300.000 | |||||||||||||||||||||||||
19 | 3 | 100002301 | FOOT VALVE, ½ IN, KUNINGAN | 2 | EA | Rp 525.000 | Rp 1.050.000 | |||||||||||||||||||||||||
20 | 4 | 100001695 | BOLT LONG DARAT, SS, M10 x 250 MM + NUT | 6 | EA | Rp 77.500 | Rp 465.000 | |||||||||||||||||||||||||
21 | 11. | USULAN JASA PREVENTIVE MAINTANANCE AC BULAN FEB 2022 PLTU ROPA (WO53002) | WO53002 | PAM JASA MAINTANANCE AC PREVENTIVE DAN CORECTIVE BULAN FEBRUARI 2022 | PR2369 | USULAN JASA PREVENTIVE MAINTANANCE AC BULAN FEB 2022 PLTU ROPA (WO53002) | 3/11/22 11:35 | 1 | JASA MAINTANANCE AC PREVENTIVE DAN CORECTIVE BULAN FEBRUARI 2022 | 1 | LOT | ARDIAN | 028.BL/PLTU-ROPA/PJBS/III/2022 | 10 Maret 2022 | PO2459 | CV. AINARO | Rp 22.720.000 | Rp 22.720.000 | Rp 2.272.000 | Rp 24.992.000 | 28 | 28-Feb-22 | Bayar aKB April | 28-Feb-22 | ||||||||
22 | 12. | INVENTORY | USULAN PENGADAAN MATERIAL GLOVES | PR2373 | USULAN PENGADAAN MATERIAL GLOVES | 3/7/22 10:17 | 1 | 100000102 | GLOVES,PURPOSE,GENERAL, DOTING, COTTON | 120 | PAIR | ARDIAN | 009.PL/PLTU-ROPA/II/2022 | 25 Februari 2022 | PO2471 | TOKO GLORYA ENDE | Rp 7.500 | Rp 900.000 | Rp 900.000 | 1 | 25-Feb-22 | Cek | 23-Feb-22 | |||||||||
23 | 13. | I&C | USULAN PENGADAAN MATERIAL LEVEL TRANSMITER HOTWELL (WO52517) | WO52517 | TURBIN #1: LEVEL TRANSMITER HOTWELL ERROR | PR2375 | USULAN PENGADAAN MATERIAL LEVEL TRANSMITER HOTWELL (WO52517) | 4/4/22 14:24 | 1 | 100002293 | SENSOR,LEVEL, XD (XP) EXPLOSIONPROOF HEAD LEVEL SENSOR FLOAT MAGNETIC, 1100 MM, LTS-R05TU-EX-L400 | 1 | EA | ARDIAN | 024.BL/PLTU-ROPA/PJBS/III/202 | 08 Maret 2022 | PO2439 | PT. TRI PILLAR JAYASAKTI | Rp 19.700.000 | Rp 19.700.000 | Rp 1.970.000 | Rp 21.670.000 | 14 | 16-Mar-22 | Bayar aKB April | 15-Mar-22 | ||||||
24 | 14. | INVENTORY | USULAN PENGADAAN MATERIAL OLI SAE 40 PLTU ROPA | PR2376 | USULAN PENGADAAN MATERIAL OLI SAE 40 PLTU ROPA | 3/31/22 14:32 | 1 | 100000018 | LUBRICATING OIL,PURPOSE,GENERAL, SAE 40 | 209 | LITER | ARDIAN | 005.PL/PLTU-ROPA/III/2022 | 01 Maret 2022 | PO2429 | PT. SAMUDRA HARAPAN | Rp 27.033 | Rp 5.650.000 | Rp 5.650.000 | 1 | 01-Mar-22 | Bayar Langsung | 5-Mar-22 | |||||||||
25 | 15. | MEKANIK | USULAN PENGADAAN MATERIAL BEARING PLTU ROPA | PR2377 | USULAN PENGADAAN MATERIAL BEARING PLTU ROPA | 3/31/22 15:47 | 1 | 100002303 | BEARING, ROLLER, TAPERED, 50 X 90 X 21.75 MM, SINGLE ROW, METAL, STEEL MATERIAL, REFF SPEED 6000 | 2 | EA | ARDIAN | 026.BL/PLTU-ROPA/PJBS/III/2022 | 10 Maret 2022 | PO2441 | CV. INTISA GENERAL | Rp 729.800 | Rp 1.459.600 | Rp 145.960 | Rp 2.527.800 | 30 | 08-Apr-22 | bayar AKB Mei | 31-Mar-22 | ||||||||
26 | 2 | 100002304 | BEARING, ROLLER, TAPERED, 30 X 62 X 17.25 MM, SINGLE ROW, METAL, STEEL MATERIAL, REFF SPEED 9000 | 2 | EA | Rp 419.200 | Rp 838.400 | Rp 83.840 | ||||||||||||||||||||||||
27 | 16. | I&C | USULAN PENGADAAN MATERIAL FITTING PUSH & LOCK | PR2379 | USULAN PENGADAAN MATERIAL FITTING PUSH & LOCK | 1 | 100002305 | CONNECTOR,PIPE OR TUBE, SLIP LOCK ELBOW L, PNEUMATIC PUSH FITTING, DRAT 1/2 X 6 MM | 30 | EA | ARDIAN | 025.BL/PLTU-ROPA/PJBS/III/2022 | 08 Maret 2022 | PO2440 | PT. TRI PILLAR JAYASAKTI | Rp 48.000 | Rp 1.440.000 | Rp 144.000 | Rp 1.958.000 | 14 | 16-Mar-22 | Bayar aKB April | 15-Mar-22 | |||||||||
28 | 2 | 100002306 | CONNECTOR,PIPE OR TUBE, SLIP LOCK TEE, T, PNEUMATIC PUSH FITTING, 6 MM | 10 | EA | Rp 34.000 | Rp 340.000 | Rp 34.000 | ||||||||||||||||||||||||
29 | 17. | UMUM | USULAN JASA PREVENTIVE MAINTANANCE AC BULAN JANUARI 2022 PLTU ROPA (WO53049) | WO53049 | PAM JASA MAINTANANCE AC PREVENTIVE DAN CORECTIVE BULAN JANUARI 2022 | PR2381 | USULAN JASA PREVENTIVE MAINTANANCE AC BULAN JANUARI 2022 PLTU ROPA (WO53049) | 3/31/22 14:19 | 1 | JASA PREVENTIVE MAINTANANCE AC BULAN JANUARI 2022 | 1 | LOT | ARDIAN | 027.BL/PLTU-ROPA/PJBS/III/2022 | 10 Maret 2022 | PO2458 | CV. AINARO | Rp 22.720.000 | Rp 22.720.000 | Rp 2.272.000 | Rp 24.992.000 | 31 | 31-Jan-22 | Bayar aKB April | 31-Jan-22 | |||||||
30 | 18. | MEKANIK | USULAN PENGADAAN MATERIAL BALL VALVE COOLING CWP PLTU ROPA | PR2382 | USULAN PENGADAAN MATERIAL BALL VALVE COOLING CWP PLTU ROPA | 3/31/22 9:14 | 1 | 100000515 | VALVE,BALL, KUNINGAN, ½ IN | 4 | EA | ARDIAN | 010.PL/PLTU-ROPA/III/2022 | 08 Maret 2022 | PO2437 | TOKO GLORYA ENDE | Rp 150.000 | Rp 600.000 | Rp 600.000 | 2 | 08-Mar-22 | Cek | 8-Mar-22 | |||||||||
31 | 19. | I&C | USULAN PENGADAAN MATERIAL FAN SERVER KOMPUTER CCR PLTU ROPA | PR2386 | USULAN PENGADAAN MATERIAL FAN SERVER KOMPUTER CCR PLTU ROPA | 3/10/22 13:54 | 1 | 100000979 | FAN, EXHAUST FAN; PAPST TYP 4700 DMT, 220, 50 Hz V, 0,22 A, 38 W | 5 | EA | ARDIAN | 030.BL/PLTU-ROPA/PJBS/III/2022 | 16 Maret 2022 | PO2463 | PT. ELECTRA FAUSINDO PERKASA | Rp 1.800.000 | Rp 9.000.000 | Rp 900.000 | Rp 9.900.000 | 14 | 31-Mar-22 | Belum Bayar | 5-Apr-22 | ||||||||
32 | 20. | MEKANIK | USULAN PENGADAAN MATERIAL BEARING DEBRIS & FD | PR2387 | USULAN PENGADAAN MATERIAL BEARING DEBRIS & FD | 3/10/22 14:16 | 1 | 100001236 | BEARING, BALL, ECCENTRIX N 206 | 6 | EA | ARDIAN | 031.BL/PLTU-ROPA/PJBS/III/2022 | 16 Maret 2022 | PO2461 | PT. ELECTRA FAUSINDO PERKASA | Rp 892.000 | Rp 5.352.000 | Rp 535.200 | Rp 23.487.200 | 35 | 26-Apr-22 | Belum Bayar | 26-Apr-22 | ||||||||
33 | 2 | 100000756 | BEARING, ROLLER, SPHERICAL, 95 X 170 X 43 MM | 4 | EA | Rp 4.000.000 | Rp 16.000.000 | Rp 1.600.000 | ||||||||||||||||||||||||
34 | 21. | MEKANIK | USULAN PENGADAAN MATERIAL BEARING MULTI CYCLONE PLTU ROPA | PR2388 | USULAN PENGADAAN MATERIAL BEARING MULTI CYCLONE PLTU ROPA | 3/10/22 14:27 | 1 | 100000460 | BEARING, ROLLER, TAPERED, 35 X 62 X 18 MM,(BEARING INLET DEBRIS FILTER, 32007 JR SKF) | 8 | EA | ARDIAN | 032.BL/PLTU-ROPA/PJBS/III/2022 | 16 Maret 2022 | PO2460 | PT. ELECTRA FAUSINDO PERKASA | Rp 1.000.000 | Rp 8.000.000 | Rp 800.000 | Rp 23.320.000 | 35 | 26-Apr-22 | Belum Bayar | 26-Apr-22 | ||||||||
35 | 2 | 100001194 | BEARING, ROLLER, DOUBLE ROW ACCENTRIC, 15 X 40.5 X 28 MM (61051 NTN YRX) | 8 | EA | Rp 1.650.000 | Rp 13.200.000 | Rp 1.320.000 | ||||||||||||||||||||||||
36 | 22. | MEKANIK | USULAN PENGADAAN MATERIAL DISPLAY PROTEKSI GENERATOR PLTU ROPA (WO53306) | WO53511 | PAM : PUMP TRANSFER TO BWRO INDIKASI PRESER DROP | PR2389 | USULAN PENGADAAN MATERIAL POMPA TRANSFER PUMP BWRO PLTU ROPA (WO53511) | 3/10/22 15:10 | 1 | 100002307 | PUMP, CM5-5 A-R-A-E-AQQE F-A-A-N, A-96807033-P1-1941, Q NOMINAL 4.7 M3/h, H NOMINAL 38.6 M, H MAX 46.4, HEAD: 87.5 M, 10 BAR/145 PSI/1.0 Mpa, TAMBIET 55°C | 1 | EA | ARDIAN | 033.BL/PLTU-ROPA/PJBS/III/2022 | 16 Maret 2022 | PO2462 | PT. ELECTRA FAUSINDO PERKASA | Rp 17.500.000 | Rp 17.500.000 | Rp 1.750.000 | Rp 19.250.000 | 31 | 21-Apr-22 | Belum Bayar | MATERIAL READY UNIT, 16/06/2022 | ||||||
37 | 23. | I&C | WO53306 | PAM : PENGADAAN DISPLAY MW DI PANEL PROTEKSI GENERATOR #1 | PR2390 | USULAN PENGADAAN MATERIAL DISPLAY PROTEKSI GENERATOR PLTU ROPA (WO53306) | 3/11/22 15:51 | 1 | 100002308 | DISPLAY, PROTEKSI GENERATOR, UMW Z-U-S-Y, SER. NO AA11B002, INPUT 3P4W, PT 6.3 KV/√ᶟ/110V √ᶟ CT 1000/5A 50 Hz, CLASS 0.25% FS + IC, POWER AC/DC 30-250V | 2 | EA | ARDIAN | 033.BL/PLTU-ROPA/PJBS/III/2022 | 24 Maret 2022 | PO2475 | PT. PELANGI LINTAS SEJAHTERA | Rp 11.000.000 | Rp 22.000.000 | Rp 2.420.000 | Rp 24.420.000 | 60 | 22-Mei-22 | Belum Bayar | 17-Mei-22 | |||||||
38 | 24. | I&C | USULAN PENGADAAN MATERIAL SOLENOID VALVE PLTU ROPA (WO53639) | WO53639 | PAM : PENGGANTIAN SELENOID VALVE COMPRESSOR B | PR2391 | USULAN PENGADAAN MATERIAL SOLENOID VALVE PLTU ROPA (WO53639) | 3/14/22 9:20 | 1 | 100000768 | VALVE, SOLENOID PREMIUM COIL JCM 115 VAC, 13 WATT, 100%ED, TYPE: JORC 2-WAY, INLET/OUTLET CONNECTIONS 1/4" - NPT; FOR COMPRESSOR SULLAIR | 5 | EA | ARDIAN | 035.BL/PLTU-ROPA/PJBS/III/2022 | 16 Maret 2022 | PO2464 | PT. TRI PILLAR JAYASAKTI | Rp 950.000 | Rp 4.750.000 | Rp 475.000 | Rp 5.225.000 | 21 | 29-Mar-22 | Belum Bayar | Cek vendor terkait spec, batal PO ke Tri Pullar | ||||||
39 | 25. | MEKANIK | USULAN PENGADAN MATERIAL VALVE AIR RELEASE PLTU ROPA (WO53640) | WO53640 | PAM : PENGGANTIAN VALVE AIR RELEASE ELETRIK PUMP | PR2392 | USULAN PENGADAN MATERIAL VALVE AIR RELEASE PLTU ROPA (WO53640) | 3/14/22 9:34 | 1 | 100002309 | VALVE, AIR RELEASE, SS316 TRIM STANDART, VALVE ½ INCH, MODEL NO. 300 PSI MAX W.P 3450AR-116.3, 300 PSI ORRIFICE 1/16 INCH, INLET SIZE ½ INCH, OUTLET SIZE ½ INCH NPT, WT LBS 8 | 1 | EA | ARDIAN | 036.BL/PLTU-ROPA/PJBS/III/2022 | 23 Maret 2022 | PO2473 | PT. TRI PILLAR JAYASAKTI | Rp 6.500.000 | Rp 6.500.000 | Rp 715.000 | Rp 7.215.000 | 21 | 13-Apr-22 | Belum Bayar | 6-Apr-22 | ||||||
40 | 26. | I&C | USULAN PENGADAAN MATERIAL VALVE DIAPHRAGM PLTU ROPA | PR2393 | USULAN PENGADAAN MATERIAL VALVE DIAPHRAGM PLTU ROPA | 3/14/22 10:47 | 1 | 100002310 | DIAPHRAGM,VALVE, UNION END WITH INSERT (SOCKET), DN 15, PN 10, BODY CONFIGURATION 2/2 WAY BODY, PVC | 2 | EA | ARDIAN | 037.BL/PLTU-ROPA/PJBS/III/2022 | 16 Maret 2022 | PO2465 | PT. TRI PILLAR JAYASAKTI | Rp 5.350.000 | Rp 10.700.000 | Rp 1.070.000 | Rp 11.770.000 | 60 | 14-Mei-22 | Belum Bayar | MATERIAL READY UNIT, 27/04/2022 | ||||||||
41 | 27. | MEKANIK | USULAN PENGADAAN MATERIAL AKSESORIS PIPA PVC UNTUK MIX BED PLTU ROPA | PR2394 | USULAN PENGADAAN MATERIAL AKSESORIS PIPA PVC UNTUK MIX BED PLTU ROPA | 3/14/22 11:22 | 1 | 100001210 | VALVE,BALL, PVC, 1 " | 5 | EA | ARDIAN | 012.PL/PLLTU-ROPA/III/2022 | 14 Maret 2022 | PO2472 | TOKO GLORYA ENDE | Rp 67.500 | Rp 337.500 | Rp 1.222.500 | 3 | 16-Mar-22 | Belum Bayar | 16-Mar-22 | |||||||||
42 | 2 | 100000695 | COUPLING,PIPE OR TUBE, PVC, 1 " | 5 | EA | Rp 10.000 | Rp 50.000 | |||||||||||||||||||||||||
43 | 3 | 100001774 | SOCK, PVC ½ INCH | 5 | EA | Rp 7.000 | Rp 35.000 | |||||||||||||||||||||||||
44 | 4 | 100000999 | VALVE,BALL, SCH 40, PVC, 2 IN | 4 | EA | Rp 200.000 | Rp 800.000 | |||||||||||||||||||||||||
45 | 28. | I&C | USULAN PENGADAAN MATERIAL LEVEL SENSOR UNTUK HOTWELL PLTU (WO52517) | WO52517 | TURBIN #1: LEVEL TRANSMITER HOTWELL ERROR | PR2398 | USULAN PENGADAAN MATERIAL LEVEL SENSOR UNTUK HOTWELL PLTU (WO52517) | 3/16/22 9:31 | 1 | 100002314 | SENSOR,LEVEL, XD (XP) EXPLOSIONPROOF HEAD LEVEL SENSOR FLOAT MAGNETIC, JARAK PUSAT 1500 MM, MODEL LTS, MATERIAL SS304 TUBE, TRANSMITER OUTPUT 4-20 mA TMU POWER 24 VDC | 1 | EA | ARDIAN | 038.BL/PLLTU-ROPA/III/2022 | 18 Maret 2022 | PO2466 | PT. TITAN BAHUREKSA | Rp 16.800.000 | Rp 16.800.000 | Rp 1.680.000 | Rp 18.480.000 | 30 | 16-Apr-22 | Belum Bayar | Sudah masuk gudang | ||||||
46 | 29. | I&C | USULAN PENGADAAN MATERIAL CONNECTOR FITTING ELBOW UNTUK MIX BED PLTU ROPA | PR2399 | USULAN PENGADAAN MATERIAL CONNECTOR FITTING ELBOW UNTUK MIX BED PLTU ROPA | 3/16/22 9:41 | 1 | 100002315 | CONNECTOR,PIPE OR TUBE, SLIP LOCK ELBOW L, PNEUMATIC PUSH FITTING, DRAT 1/4 X 6 MM | 30 | EA | ARDIAN | 041.BL/PLLTU-ROPA/III/2022 | 18 Maret 2022 | PO2469 | PT. TRI PILLAR JAYASAKTI | Rp 31.666,67 | Rp 950.000 | Rp 95.000 | Rp 1.045.000 | 14 | 31-Mar-22 | Bayar AKB Mei | 6-Apr-22 | ||||||||
47 | 30. | MEKANIK | USULAN PENGADAAN MATERIAL BALL VALVE PLTU ROPA | PR2400 | USULAN PENGADAAN MATERIAL BALL VALVE PLTU ROPA | 3/16/22 9:46 | 1 | 100002311 | BALL,VALVE, 3 WAY, SS316, 1/2 INCH | 2 | EA | ARDIAN | 039.BL/PLLTU-ROPA/III/2022 | 18 Maret 2022 | PO2467 | CV. INTISA GENERAL | Rp 1.550.000 | Rp 3.100.000 | Rp 310.000 | Rp 3.410.000 | 30 | 16-Apr-22 | Belum Bayar | READY UNIT, 20 APRIL 2022 | ||||||||
48 | 31. | KIMIA & LINGKUNGAN | USULAN PENGADAAN MATERIAL PAINT PLTU ROPA | PR2401 | USULAN PENGADAAN MATERIAL PAINT PLTU ROPA | 3/16/22 9:52 | 1 | 100002312 | PAINT, TRAFFIKOTE, TFK-108 WB, GREEN, 1 KG LITER | 50 | CAN | ARDIAN | 040.BL/PLLTU-ROPA/III/2022 | 18 Maret 2022 | PO2468 | PT. TRI PILLAR JAYASAKTI | Rp 168.800 | Rp 8.440.000 | Rp 844.000 | Rp 14.854.400 | 30 | 16-Apr-22 | Bayar AKB Mei | 12-Apr-22 | ||||||||
49 | 2 | 100002313 | PAINT, TRAFFIKOTE, TFK-108 WB, YELLOW, 1 KG LITER | 30 | CAN | Rp 168.800 | Rp 5.064.000 | Rp 506.400 | ||||||||||||||||||||||||
50 | 32. | MEKANIK | USULAN PENGADAAN MATERIAL COUPLING BOOSTER PUMP PLTU ROPA | PR2402 | USULAN PENGADAAN MATERIAL COUPLING BOOSTER PUMP PLTU ROPA | 3/16/22 13:38 | 1 | 100002316 | COUPLING, FCL-200, ID AS IDEAL 31.5 MM, LUBANG SPEI 10 MM, KEDALAMAN SPEI 6 MM, ID DRIVE 54.5 MM, LEBAR SPEI 15.5 MM, KEDALAMAN SPEI 6 MM, FOR BOOSTER PUMP | 1 | EA | ARDIAN | 040.BL/PLLTU-ROPA/III/2022 | 18 Maret 2022 | PO2470 | PT. TRI PILLAR JAYASAKTI | Rp 4.780.000 | Rp 4.780.000 | Rp 478.000 | Rp 5.258.000 | 14 | 31-Mar-22 | Bayar aKB April | 21-Feb-22 | ||||||||
51 | 33. | MEKANIK | PENGADAAN MATERIAL BEARING GEAR BOX DEBRIS FILTER PLTU ROPA | PR2403 | PENGADAAN MATERIAL BEARING GEAR BOX DEBRIS FILTER PLTU ROPA | 3/18/22 14:55 | 1 | 100001236 | BEARING, BALL, ECCENTRIX N 206 | 10 | EA | ARDIAN | 043.BL/PLLTU-ROPA/III/2022 | 14 April 2022 | PO2486 | PT. MYTRA KARUNIA SEJATI | Rp 542.000 | Rp 5.420.000 | Rp 596.200 | Rp 6.016.200 | 30 | 13-Mei-22 | Bayar AKB Mei | Sudah masuk gudang | ||||||||
52 | 34. | INVENTORY | USULAN PENGADAAN PELUMAS POMPA BOOSTER, CEP, INJECTION & BFP PLTU ROPA | PR2404 | USULAN PENGADAAN PELUMAS POMPA BOOSTER, CEP, INJECTION & BFP PLTU ROPA | 3/18/22 15:00 | 1 | 100002317 | LUBRICATING OIL,PURPOSE,GENERAL, SHELL MORLINA, S2 B 220 | 418 | LITER | ARDIAN | 044.BL/PLTU-ROPA/PJBS/III/2022 | 23 Maret 2022 | PO2474 | PT. SEFAS KALIANTAMA | Rp 46.300 | Rp 19.353.400 | Rp 2.128.874 | Rp 21.482.274 | 30 | 21-Apr-22 | Belum Bayar | READY UNIT, 8 APRIL 2022 | ||||||||
53 | 35. | MEKANIK | USULAN PENGADAAN GLAND PACKING UNTUK HPH | WO54271 | PAM : TERDAPAT KEBOCORAN HPH TURBIN UNIT 2 | PR2405 | USULAN PENGADAAN GLAND PACKING UNTUK HPH #1 PLTU ROPA (WO54271) | 3/29/22 10:35 | 1 | 100000454 | PACKING STICK, GLAND, 6 X 6 MM, GRAPHITE, TEMPERATURE 649°C, TEKANAN 2500 PSI | 2 | ROLL | ARDIAN | 045.BL/PLTU-ROPA/PJBS/IV/2022 | 14 April 2022 | PO2484 | PT. TRI PILLAR JAYASAKTI | Rp 3.460.000 | Rp 6.920.000 | Rp 761.200 | Rp 22.977.000 | 21 | 04-Mei-22 | Bayar AKB Mei | 13-Apr-22 | ||||||
54 | 2 | 100000349 | PACKING STICK, GLAND, 8 X 8 MM MM, GRAPHITE, TEMPERATURE 649°C, TEKANAN 2500 PSI | 2 | ROLL | Rp 3.340.000 | Rp 6.680.000 | Rp 734.800 | ||||||||||||||||||||||||
55 | 3 | 100000437 | PACKING STICK, GLAND, 10 X10 MM MM, GRAPHITE, TEMPERATURE 649°C, TEKANAN 2500 PSI | 2 | ROLL | Rp 3.550.000 | Rp 7.100.000 | Rp 781.000 | ||||||||||||||||||||||||
56 | 36. | I&C | USULAN PENGADAAN VALVE AQUAMATIC UNTUK MIXBED TAHAP I PLTU ROPA | PR2406 | USULAN PENGADAAN VALVE AQUAMATIC UNTUK MIXBED TAHAP I PLTU ROPA | 3/29/22 14:15 | 1 | 100000149 | VALVE,PNEUMATIC, COMPOSITE CONTROL VALVE, Y PATTERN; WATER TREATMENT SYSTEM, AQUAMATIC 521-A 125; K521-X-200-64000, NORMALLY OPEN, 1 " | 3 | EA | ARDIAN | 046.BL/PLTU-ROPA/PJBS/IV/2022 | 22 April 2022 | PO2504 | PT. GANESHA ENERGY BERSAUDARA | Rp 7.128.000 | Rp 21.384.000 | Rp 2.352.240 | Rp 23.736.240 | 14 | 05-Mei-22 | Belum Bayar | READY UNIT, 15 JUNI 2022 | ||||||||
57 | 37. | I&C | USULAN PENGADAAN VALVE AQUAMATIC UNTUK MIXBED TAHAP II PLTU ROPA | PR2407 | USULAN PENGADAAN VALVE AQUAMATIC UNTUK MIXBED TAHAP II PLTU ROPA | 3/29/22 14:22 | 1 | 100000149 | VALVE,PNEUMATIC, COMPOSITE CONTROL VALVE, Y PATTERN; WATER TREATMENT SYSTEM, AQUAMATIC 521-A 125; K521-X-200-64000, NORMALLY OPEN, 1 " | 2 | EA | ARDIAN | 047.BL/PLTU-ROPA/PJBS/IV/2022 | 22 April 2022 | PO2505 | PT. GANESHA ENERGY BERSAUDARA | Rp 7.128.000 | Rp 14.256.000 | Rp 1.568.160 | Rp 15.824.160 | 14 | 05-Mei-22 | Belum Bayar | READY UNIT, 15 JUNI 2022 | ||||||||
58 | 38. | MEKANIK | USULAN PENGADAAN BESI SIKU UNTUK RUBBER SKIRT & PIPA PVC PLTU ROPA | PR2408 | USULAN PENGADAAN BESI SIKU UNTUK RUBBER SKIRT & PIPA PVC PLTU ROPA | 4/6/22 14:28 | 1 | 100001266 | BESI SIKU, ANGLE, 50 x 50 x 5 MM | 5 | TUBE | ARDIAN | 049.BL/PLTU-ROPA/PJBS/VI/2022 | 17 Juni 2022 | PO2515 | PT. ELECTRA FAUSINDO PERKASA | Rp 1.300.000 | Rp 6.500.000 | Rp 715.000 | Rp 11.477.400 | 35 | 22-Jul-22 | Belum Bayar | Ready, 29/06/2022 | ||||||||
59 | 2 | 100000694 | PIPE, PIPE PVC SCH 40, 2 IN | 10 | TUBE | Rp 384.000 | Rp 3.840.000 | Rp 422.400 | ||||||||||||||||||||||||
60 | 39. | MEKANIK | USULAN PENGADAAN MATERIAL PLUMMER BLOCK & BEARING BELT FEEDER PLTU ROPA | WO54272 | PAM : PENGGANTIAN BEARING BELT FEEDER A | PR2409 | USULAN PENGADAAN MATERIAL PLUMMER BLOCK & BEARING BELT FEEDER PLTU ROPA (WO54272) | 4/1/22 10:21 | 1 | 100002319 | HOUSING, ROLLER BEARING SNV 085 FAG - PILLOW BLOCK BEARINGS | 2 | EA | ARDIAN | 048.BL/PLTU-ROPA/PJBS/IV/2022 | 14 April 2022 | PO2485 | PT. GANESHA ENERGY BERSAUDARA | Rp 3.100.000 | Rp 6.200.000 | Rp 682.000 | Rp 17.205.000 | 10 | 23-Apr-22 | Belum Bayar | 12-Apr-22 | ||||||
61 | 2 | 100002320 | BEARING, ROLLER, SPHERICAL, 45 X 85 X 23 MM | 2 | EA | Rp 2.400.000 | Rp 4.800.000 | Rp 528.000 | ||||||||||||||||||||||||
62 | 3 | 100002321 | ADAPTER SLEVE, H 309, (ID 40 MM) | 2 | EA | Rp 1.450.000 | Rp 2.900.000 | Rp 319.000 | ||||||||||||||||||||||||
63 | 4 | 100000900 | SEAL,OIL, 085 SNV, FOR PLUMMER BLOCK BELT FEEDER | 4 | SET | Rp 400.000 | Rp 1.600.000 | Rp 176.000 | ||||||||||||||||||||||||
64 | 40. | MEKANIK | USULAN PENGADAAN BESI SIKU UNTUK RUBBER SKIRT & PIPA PVC PLTU ROPA | PR2408 | USULAN PENGADAAN BESI SIKU UNTUK RUBBER SKIRT & PIPA PVC PLTU ROPA | 4/6/22 14:28 | 1 | 100001266 | BESI SIKU, ANGLE, 50 x 50 x 5 MM | 5 | TUBE | ARDIAN | 049.BL/PLTU-ROPA/PJBS/VI/2022 | 17 Juni 2022 | PO2515 | PT. ELECTRA FAUSINDO PERKASA | Rp 1.300.000 | Rp 6.500.000 | Rp 715.000 | Rp 11.477.400 | 35 | 22-Jul-22 | Belum Bayar | Ready, 09/06/2022 | ||||||||
65 | 2 | 100000694 | PIPE, PIPE PVC SCH 40, 2 IN | 10 | TUBE | Rp 384.000 | Rp 3.840.000 | Rp 422.400 | ||||||||||||||||||||||||
66 | 41. | KIMIA & LINGKUNGAN | USULAN PENGADAAN TOOL CONDUCTIVITY METER PORTABLE PLTU ROPA | PR2414 | USULAN PENGADAAN TOOL CONDUCTIVITY METER PORTABLE PLTU ROPA | 4/7/22 15:35 | 1. | T1339 | CONDUCTIVITY, METER PORTABLE, REFF HORIBA LAQUA ACT EC110 AUTOMATIC CALIBRATION, AUTOMATION TEMPERATURE IP-67 POWERED BY 2X AAA BATTERY | 1 | EA | ARDIAN | 050.BL/PLTU-ROPA/PJBS/VI/2022 | 16 Juni 2022 | PO2513 | PT. TRENGGINAS UTAMA LABORATORI DAN KONTROL | Rp 20.500.000 | Rp 20.500.000 | Rp 2.255.000 | Rp 22.755.000 | 30 | 15-Jul-22 | Belum Bayar | Ready 18-07-2022 | ||||||||
67 | 42. | MEKANIK | USULAN PENGADAAN AKSESORIS PIPA PVC FOR MANUAL VALVE MIX BED PLTU ROPA | PR2416 | USULAN PENGADAAN AKSESORIS PIPA PVC FOR MANUAL VALVE MIX BED PLTU ROPA | 4/13/22 11:38 | 1 | 100000136 | VALVE,BALL, WATER MUR, PVC, 1 IN | 3 | EA | ARDIAN | 051.BL/PLTU-ROPA/PJBS/VI/2022 | 24 Juni 2022 | PT. PELANGI LINTAS SEJAHTERA | Rp 1.100.000 | Rp 3.300.000 | Rp 363.000 | Rp 8.103.000 | Belum Bayar | 4-Jul-22 | |||||||||||
68 | 2 | 100000695 | COUPLING,PIPE OR TUBE, PVC, 1 " | 4 | EA | PO2517 | Rp 500.000 | Rp 2.000.000 | Rp 220.000 | 30 | 23-Jul-22 | |||||||||||||||||||||
69 | 3 | 100001774 | SOCK, PVC ½ INCH | 4 | EA | Rp 500.000 | Rp 2.000.000 | Rp 220.000 | ||||||||||||||||||||||||
70 | 43. | MEKANIK | PENGGANTIAN FILTER OIL MOT UNIT 2 | WO55083 | PR2417 | USULAN PENGADAAN FILTER MOT #2 PLTU ROPA (WO55083) | 4/19/22 13:50 | 1 | 100001993 | FILTER, WIRE MESH, MAIN OIL TANK, ZA2LS1000W-BZ1, 1.6 MPA, -20-80 C, 0.35 MPA | 2 | EA | ARDIAN | 052.BL/PLTU-ROPA/PJBS/VII/2022 | 14 Juli 2022 | PO2537 | PT. ELECTRA FAUSINDO PERKASA | Rp 10.250.000 | Rp 20.500.000 | Rp 2.255.000 | Rp 22.755.000 | 7 | 20-Jul-22 | Belum Bayar | 18-Jul-22 | |||||||
71 | 44. | MEKANIK | PENGADAN SELANG OLI COMPRESSOR A | WO55082 | PAM : PENGGANTIAN SELANG OLI COMPRESOR A | PR2421 | USULAN PENGADAN SELANG OLI COMPRESSOR A PLTU ROPA (WO55082) | 4/25/22 14:20 | 1 | 100000786 | HOSE, OIL COMPRESSOR, MP ORIFICES F-SWVL, P/N 02250156-909 | 3 | EA | ARDIAN | 053.BL/PLTU-ROPA/PJBS/VI/2022 | 17 Juni 2022 | PO2511 | PT. PETROTEC AIR POWER | Rp 7.139.300 | Rp 21.417.900 | Rp 2.355.969 | Rp 23.773.869 | 84 | 09-Sep-22 | TERBAYAR AKB FEB 2023 | |||||||
72 | 45. | ELEKTRIK | MATERIAL FAN SERVER KOMPUTER CCR | PR2422 | USULAN PENGADAAN MATERIAL FAN SERVER KOMPUTER CCR PLTU ROPA | 4/25/22 15:14 | 1 | 100000979 | FAN, EXHAUST FAN; PAPST TYP 4700 DMT, 220, 50 Hz V, 0,22 A, 38 W, P 120 MM, L 120 MM | 5 | EA | ARDIAN | 054.BL/PLTU-ROPA/PJBS/VI/2022 | 30 Juni 2022 | PO2532 | PT. TRI PILLAR JAYASAKTI | Rp 800.000 | Rp 4.000.000 | Rp 440.000 | Rp 4.440.000 | 14 | 14-Jul-22 | Belum Bayar | MATERIAL READY, 9 AGUSTUS 2022 | ||||||||
73 | 46. | I&C | CONNECTOR FITTING ELBOW | PR2423 | USULAN PENGADAAN MATERIAL CONNECTOR FITTING ELBOW UNTUK MIX BED PLTU ROPA | 4/26/22 9:34 | 1 | 100000338 | CONNECTOR, SLIP LOCK ELBOW L, DIAMETER LINGKARAN SISI ATAS 9.5 MM, DIAMETER LINGKARAN DRAT LUAR SISI BAWAH 9 MM, DIAMETER LUBANG SELANG 6 MM, PNEUMATIC PUSH IN FITTING | 30 | EA | ARDIAN | 055.BL/PLTU-ROPA/PJBS/VI/2022 | 21 Juni 2022 | PO2516 | PT. ELECTRA FAUSINDO PERKASA | Rp 150.000 | Rp 4.500.000 | Rp 495.000 | Rp 4.995.000 | 7 | 28-Jun-22 | Belum Bayar | 22-Jun-22 | ||||||||
74 | 47. | K3 | ASSMENT FIRE TRUCK HYDRANT PLTU ROPA | WO55524 | PAM : JASA ASSESMENT FIRE TRUCK HYDRANT | PR2424 | USULAN JASA ASSMENT FIRE TRUCK HYDRANT PLTU ROPA (WO55524) | 4/26/22 9:51 | 1 | JASA ASSMENT FIRE TRUCK HYDRANT | 1 | LOT | ARDIAN | 056.BL/PLTU-ROPA/PJBS/V/2022 | 30 Mei 2022 | PO2502 | PT. ZIEGLER INDONESIA | Rp 12.000.000 | Rp 12.000.000 | Rp 1.320.000 | Rp 13.320.000 | 14 | 13-Jun-22 | Belum Bayar | close | |||||||
75 | 48. | ENG | KALIBRASI TOOL VIBRASI VIBSCANER | WO55989 | PAM : JASA KALIBRASI ULANG TOOL VIBRASI VIBSCANNER | PR2425 | USULAN JASA KALIBRASI TOOL VIBRASI VIBSCANER PLTU ROPA (WO55989) | 5/17/22 9:55 | 1 | JASA KALIBRASI ULANG TOOL VIBRASI VIBSCANNER | 1 | LOT | ARDIAN | PROSES PENGAADAAN MENUNGGU BARANG PENGGATI UNTUK HANDLE PEKERJAAN DU UNIT | ||||||||||||||||||
76 | 49. | K3 | SERTIFIKASI PERALATAN CO2 SUPPRESION | WO55486 | PAM : SETIFIKASI PERALATAN CO2 SUPPRESSION | PR2427 | USULAN JASA SERTIFIKASI PERALATAN CO2 SUPPRESION PLTU ROPA (WO55486) | 26-04-2022 9:58 AM | 1 | JASA SERTIFIKASI PERALATAN CO2 SUPPRESSION | 1 | LOT | ARDIAN | 058.BL/PLTU-ROPA/PJBS/V/2022 | 31 Mei 2022 | PO2506 | PT. TRIKARYA REKAYASA UTAMA | Rp 9.790.000 | Rp 9.790.000 | Rp 1.076.900 | Rp 10.866.900 | 120 | 28-Sep-22 | Belum Bayar | ||||||||
77 | 50. | MEKANIK | BAN FORKLIFT | WO55988 | PAM : KERUSAKAN RODA FORKLIF & BAN RODA FORKLIF | PR2429 | USULAN PENGADAN MATERIAL BAN FORKLIFT PLTU ROPA (WO55988) | 5/24/22 10:01 | 1 | 100002329 | TIRE, PNEUMATIC TIRE, 700 X 12/12 GRIP, FOR FORKLIFT, REINFORCED CONSTRUCTION WITH NYLON CORD | 2 | EA | ARDIAN | 059.BL/PLTU-ROPA/PJBS/VI/2022 | 16 Juni 2022 | PO2525 | CV. SELARAS ANEKA CIPTA | Rp 3.750.000 | Rp 7.500.000 | Rp 825.000 | Rp 8.325.000 | 14 | 30-Jun-22 | Belum Bayar | READY, 29/06/2022 | ||||||
78 | 51. | MEKANIK | SHAFT & PULLEY SPREADER | WO56300 | PR2435 | USULAN PENGADAAN MATERIAL SHAFT & PULLEY SPREADER PLTU ROPA (WO56300) | 6/9/22 15:08 | 1 | 100001881 | DISTRIBUTOR, SHAFT, OD 50 MM X 838 MM,MATERIAL S35C, PN DS-266A, SPIE DIMENSI 35 X 10 X 8 MM MATERIAL SS400, SPIE DIMENSI 35 X 14 X 9 MM MATERIAL SS400, STOPPER DIMENSI OD 60 MM, T 5 MM, MATERIAL SS400, BOLT DIMENSI M8 X 20 MATERIAL A307, FOR SPREADER | 3 | EA | ARDIAN | 060.BL/PLTU-ROPA/PJBS/VI/2022 | 16 Juni 2022 | PO2507 | PT. DYNAMIC BOILER NUSANTARA | Rp 4.860.000 | Rp 14.580.000 | Rp 1.603.800 | Rp 23.043.933 | 60 | 15-Agu-22 | Belum Bayar | READY, 20/08/2022 | |||||||
79 | 2 | 100002282 | PULLEY, DISTRIBUTOR, DIMENSI OD 152.5 MM, T 40 MM, MATERIAL FC25 | 3 | EA | Rp 2.060.100 | Rp 6.180.300 | Rp 679.833 | ||||||||||||||||||||||||
80 | 52. | MEKANIK | BEARING FD & ID FAN | PR2436 | USULAN PENGADAAN BEARING FD & ID FAN PLTU ROPA | 6/15/22 12:20 | 1 | 100000756 | BEARING, ROLLER, SPHERICAL, 95 X 170 X 43 MM | 5 | EA | ARDIAN | 061.BL/PLTU-ROPA/PJBS/VI/2022 | 29 Juni 2022 | PO2518 | PT. MYTRA KARUNIA SEJATI | Rp 3.158.300 | Rp 15.791.500 | Rp 1.737.065 | Rp 17.528.565 | 30 | 29-Jul-22 | Belum Bayar | READY, 13/07/2022 | ||||||||
81 | 53. | MEKANIK | ADAPTER SLEEVE BEARING ID & FD | PR2437 | USULAN PENGADAAN ADAPTER SLEEVE BEARING ID & FD FAN PLTU ROPA | 6/15/22 12:23 | 1 | 100001834 | ADAPTER SLEVE, H 319, SKF | 6 | EA | ARDIAN | 062.BL/PLTU-ROPA/PJBS/VI/2022 | 29 Juni 2022 | PO2519 | PT. MYTRA KARUNIA SEJATI | Rp 1.049.000 | Rp 6.294.000 | Rp 692.340 | Rp 10.492.053 | 30 | 29-Jul-22 | Belum Bayar | READY, 13/07/2022 | ||||||||
82 | 2 | 100000756 | BEARING, ROLLER, SPHERICAL, 95 X 170 X 43 MM | 1 | EA | Rp 3.158.300 | Rp 3.158.300 | Rp 347.413 | ||||||||||||||||||||||||
83 | 54. | MEKANIK | BEARING SPREADER | PR2438 | USULAN PENGADAAN BEARING SPREADER PLTU ROPA | 6/15/22 12:27 | 1 | 100001890 | HOUSING, BEARING, FC 209, INCLUDE BEARING | 6 | EA | ARDIAN | 063.BL/PLTU-ROPA/PJBS/VI/2022 | 29 Juni 2022 | PO2520 | PT. MYTRA KARUNIA SEJATI | Rp 593.100 | Rp 3.558.600 | Rp 391.446 | Rp 10.771.662 | 30 | 29-Jul-22 | Belum Bayar | READY, 13/07/2022 | ||||||||
84 | 2 | 100000039 | BEARING, BALL, ANGULAR CONTACT, 45 X 85 X 49.2MM, SINGLE ROW, 4300 RPM | 6 | EA | Rp 231.520 | Rp 1.389.120 | Rp 152.803 | ||||||||||||||||||||||||
85 | 3 | 100000352 | BEARING, BALL, DEEP GROOVE, 75 X 160 X 37 MM, SINGLE ROW, GREATER | 4 | EA | Rp 1.189.120 | Rp 4.756.480 | Rp 523.213 | ||||||||||||||||||||||||
86 | 55. | MEKANIK | SELANG & CAMLOCK RO PUMP | WO57058 | PR2439 | USULAN PENGADAAN MATERIAL SELANG & CAMLOCK RO PUMP PLTU ROPA (WO57058) | 6/20/22 14:19 | 1 | 100002332 | COUPLER, CAMLOCK, A 200, 2 INCH, ALUMINIUM | 10 | EA | ARDIAN | 064.BL/PLTU-ROPA/PJBS/VII/2022 | 06 Juli 2022 | PO2529 | PT. ELECTRA FAUSINDO PERKASA | Rp 200.000 | Rp 2.000.000 | Rp 220.000 | Rp 13.597.500 | 14 | 19-Jul-22 | Belum Bayar | READY, 23/07/2022 | |||||||
87 | 2 | 100002333 | COUPLER, CAMLOCK, C 200, 2 INCH, ALUMINIUM | 10 | EA | Rp 450.000 | Rp 4.500.000 | Rp 495.000 | ||||||||||||||||||||||||
88 | 3 | 100002334 | CLAMP, 2 IN, SS, 304 | 5 | EA | Rp 550.000 | Rp 2.750.000 | Rp 302.500 | ||||||||||||||||||||||||
89 | 4 | 100002335 | HOSE, RUBBER, OIL SUCTION DISCHARGE, 2 INCH, 3 M, 250 PSI | 2 | EA | Rp 1.500.000 | Rp 3.000.000 | Rp 330.000 | ||||||||||||||||||||||||
90 | PR2444 | |||||||||||||||||||||||||||||||
91 | 57. | MEKANIK | HANGER SEAL PLATE TRAVELING GRATE | WO57512 | BOILER #1 : GRATE RACK TRAVELING GRATE TERJATUH | PR2445 | USULAN PENGADAAN HANGER SEAL PLATE TRAVELING GRATE PLTU ROPA (WO57512) | 6/24/22 11:47 | 1 | 100000877 | HANGER, SEAL PLATE, TRAVELING GRATE HANGER BAR OD 32 MM, PIN OD 20 MM, NUT & WASHER M16, MATERIAL SS41 | 15 | EA | ARDIAN | 067.BL/PLTU-ROPA/PJBS/VII/2022 | 06 Juli 2022 | PO2531 | PT. DYNAMIC BOILER NUSANTARA | Rp 1.367.100 | Rp 20.506.500 | Rp 2.255.715 | Rp 22.762.215 | 42 | 16-Agu-22 | BAYAR AKB MEI | READY, 20/08/2022 | ||||||
92 | 58. | MEKANIK | MATERIAL LINE WWTP TO ASH COOLER | WO56752 | BOILER #2: LINE PIPE WWTP TO BOTTOM ASH COOLER #2 PATAH | PR2446 | USULAN PENGADAAN MATERIAL LINE WWTP TO ASH COOLER PLTU ROPA (WO56752) | 6/27/22 11:12 | 1 | 100000694 | PIPE, PIPE PVC SCH 40, 2 IN | 20 | TUBE | ARDIAN | 012.PL/PLTU-ROPA/VI/2022 | 27 Juni 2022 | UD USAHA BERSAMA | Rp 150.000 | Rp 3.000.000 | Rp 3.750.000 | 7 | 01-Jul-22 | Bayar | MATERIAL READY, 1 JULI 2022 | ||||||||
93 | 2 | 100001001 | UNION, PVC, (WATER MUR), 2 IN, SCH: 40 | 10 | EA | Rp 49.000 | Rp 490.000 | |||||||||||||||||||||||||
94 | 3 | 100001390 | ELBOW,PIPE OR TUBE, 90 DEG PVC, SCH 40, 2" | 10 | EA | Rp 14.000 | Rp 140.000 | |||||||||||||||||||||||||
95 | 4 | 100000376 | SOCK, PIPE OR TUBE, PVC 2" | 15 | EA | Rp 8.000 | Rp 120.000 | |||||||||||||||||||||||||
96 | 59. | MEKANIK | USULAN PENGADAAN MECHANICAL SEAL BOOSTER PUMP PLTU ROPA | PR2447 | USULAN PENGADAAN MECHANICAL SEAL BOOSTER PUMP PLTU ROPA | 6/28/22 10:18 | 1 | 100002002 | SEAL,MECHANICAL, BOOSTER PUMP, JOHN CRANE TJ-0400-S-2 | 3 | EA | ARDIAN | 069.BL/PLTU-ROPA/PJBS/VII/2022 | 06 Juli 2022 | PO2530 | CV. ARTHA RADJA | Rp 5.950.000 | Rp 17.850.000 | Rp 1.963.500 | Rp 19.813.500 | 14 | 19-Jul-22 | Belum Bayar | MATERIAL READY, 23 JULI 2022 | ||||||||
97 | 60. | MEKANIK | PLATE SS | WO57537 | BOILER #2 :MULTI CYCLONE NO.2 PLAT CASSING KEROPOS | PR2449 | USULAN PENGADAAN MATERIAL PLATE SS PLTU ROPA (WO57537) | 6/29/22 14:47 | 1 | 100002336 | PLATE,SHEET, STAINLESS STEEL 304, 1.2 MM THICKNESS X 4 X 8 MM | 5 | SHEET | ARDIAN | 070.BL/PLTU-ROPA/PJBS/VII/2022 | 27 Juli 2022 | PO2539 | PT. TRI PILLAR JAYASAKTI | Rp 3.840.000 | Rp 19.200.000 | Rp 2.112.000 | Rp 21.312.000 | 30 | 19-Agu-22 | Belum Bayar | MATERIAL READY, 9 AGUSTUS 2022 | ||||||
98 | 61. | INVENTORY | KONTAK BANTU DAN ISOLASI TAHAN PANAS | PR2450 | USULAN PENGADAAN KONTAK BANTU DAN ISOLASI TAHAN PANAS PLTU ROPA | 6/29/22 15:29 | 1 | 100002339 | AUXILIARY CONTACT, ABB, NO/NC, CAL 18-11, A600 Q300 SIDE MOUNTING | 10 | EA | ARDIAN | 071.BL/PLTU-ROPA/PJBS/VIII/2022 | 05 Agustus 2022 | PO2558 | CV. MUKTI DJAYA | Rp 430.000 | Rp 4.300.000 | Rp 473.000 | Rp 8.436.000 | 30 | 19-Agu-22 | Belum Bayar | MATERIAL READY, 31 AGUSTUS 2022 | ||||||||
99 | 2 | 100002340 | TAPE,ELECTRICAL, HEAT RESISTANT, ¾ IN, 19 MM X 20 , 1 M X 0.18 MM, SCOTCH 27 | 6 | EA | Rp 550.000 | Rp 3.300.000 | Rp 363.000 | ||||||||||||||||||||||||
100 | 62. | ELEKTRIK | KONTAKTOR & CONNECTOR | PR2453 | USULAN PENGADAAN KONTAKTOR & CONNECTOR PLTU ROPA | 7/1/22 11:54 | 1 | 100002341 | MALE CONNECTOR, ⅛ IN OD 11.5 MM X ¼ IN MM, NPT, INSTALL TUBE OD 6 MM | 5 | EA | ARDIAN | 072.BL/PLTU-ROPA/PJBS/VIII/2022 | 05 Agustus 2022 | PO2559 | CV. MUKTI DJAYA | Rp 600.000 | Rp 3.000.000 | Rp 330.000 | Rp 15.651.000 | 30 | 03-Sep-22 | Belum Bayar | MATERIAL READY, 31 AGUSTUS 2022 | ||||||||