A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | utm/oshe/hirarc/v01 | |||||||||||||||||||||||||
2 | BORANG HIRARC (HIRARC FORM) | |||||||||||||||||||||||||
3 | ||||||||||||||||||||||||||
4 | ||||||||||||||||||||||||||
5 | ||||||||||||||||||||||||||
6 | Faculty/Department/Unit/Laboratory/Workshop: Fakulti/Jabatan/Unit/Makmal/Bengkel: | Conducted By: (Name, Position) Disediakan Oleh: (Nama, Jawatan) | ||||||||||||||||||||||||
7 | Work Process/Location/Block: Proses Kerja/Lokasi/Blok: | |||||||||||||||||||||||||
8 | ||||||||||||||||||||||||||
9 | Approved By: (Name, Position, Signature) Disahkan Oleh: (Nama, Jawatan, Tandatangan) | Prepared Date: (from) Tarikh Disediakan: (dari) | (to) (hingga) | |||||||||||||||||||||||
10 | Review Date: Tarikh Disemak: | |||||||||||||||||||||||||
11 | Approved Date: Tarikh Disahkan: | Second Review Date: Tarikh Semakan Semula: | ||||||||||||||||||||||||
12 | ||||||||||||||||||||||||||
13 | ||||||||||||||||||||||||||
14 | 1. Hazard Identification Pengenalpastian Hazard | 2. Risk Analysis Analisis Risiko | 3. Risk Control Kawalan Risiko | |||||||||||||||||||||||
15 | No. Bil. | Work Activity Aktiviti Kerja | Hazard Hazad | Which can cause/effect Yang Boleh Mengakibatkan/Kesan | Existing Risk Control (if any) Kawalan Risiko (sedia ada) | Likelihood Kebarangkalian (A) | Severity Keterukan (B) | Risk Tahap Risiko (AxB) | Recommended Control Measures Langkah Kawalan Yang Disarankan | PIC (Due date/status) Orang Bertanggungjawab (Tarikh Tamat/Status) | ||||||||||||||||
16 | ||||||||||||||||||||||||||
17 | ||||||||||||||||||||||||||
18 | ||||||||||||||||||||||||||
19 | ||||||||||||||||||||||||||
20 | ||||||||||||||||||||||||||
21 | ||||||||||||||||||||||||||
22 | ||||||||||||||||||||||||||
23 | ||||||||||||||||||||||||||
24 | Likelihood Scale Skala Kemungkinan / Kebarangkalian | Severity Scale Skala Keterukan / Ketenatan | Preventive Measures (Control Scale) Langkah Kawalan (Hierarki Kawalan) | |||||||||||||||||||||||
25 | 5 - Almost Certain / Paling Mungkin (Setiap Jam) | 5 - Catastrophic / Malapetaka | 1 - Elimination / Penghapusan | |||||||||||||||||||||||
26 | 4 - Likely / Mungkin (Setiap Hari) | 4 - Fatal / Kematian | 2 - Substitution / Penggantian | |||||||||||||||||||||||
27 | 3 - Possible / Dapat Dijangka (Setiap Minggu) | 3 - Serious / Serius (MC lebih 3 hari/Hilang Upaya Kekal) | 3 - Engineering Control / Kawalan Kejuruteraan | |||||||||||||||||||||||
28 | 2 - Unlikely / Jarang Sekali (Setiap Bulan) | 2 - Minor / (MC kurang 3 hari/Kecederaan Tidak Kekal) | 4 - Administrative Controls / Kawalan Pengurusan | |||||||||||||||||||||||
29 | 1 - Rare / Tidak Mungkin (Setahun Sekali) | 1 - Negligible/ Lelasan Kecil, Lebam, Luka Ringan, Kecederaan Ringan | 5 - Personal Protective Equipment / Peralatan Perlindungan Diri | |||||||||||||||||||||||
30 | ||||||||||||||||||||||||||
31 | Risk / Tahap Risiko | |||||||||||||||||||||||||
32 | 1-4 - Rendah (Low) | A risk identified as LOW may be considered as acceptable and further reduction may not be necessary. However, if the risk can be resolved quickly and efficiently, control measures should be implemented and recorded. | ||||||||||||||||||||||||
33 | 5-12 - Sederhana (Medium) | A MEDIUM risk requires a planned approach to controlling the hazard and applies temporary measure if required. Actions taken must be documented on the risk assessment form including date for completion. | ||||||||||||||||||||||||
34 | 15-25 - Tinggi (High) | A HIGH risk requires immediate action to control the hazard as detailed in the hierarchy of control. Actions taken must be documented on the risk assessment form including date for completion | ||||||||||||||||||||||||
35 | ||||||||||||||||||||||||||
36 | ||||||||||||||||||||||||||
37 | ||||||||||||||||||||||||||
38 | ||||||||||||||||||||||||||
39 | ||||||||||||||||||||||||||
40 | ||||||||||||||||||||||||||
41 | ||||||||||||||||||||||||||
42 | ||||||||||||||||||||||||||
43 | ||||||||||||||||||||||||||
44 | ||||||||||||||||||||||||||
45 | ||||||||||||||||||||||||||
46 | ||||||||||||||||||||||||||
47 | ||||||||||||||||||||||||||
48 | ||||||||||||||||||||||||||
49 | ||||||||||||||||||||||||||
50 | ||||||||||||||||||||||||||
51 | ||||||||||||||||||||||||||
52 | ||||||||||||||||||||||||||
53 | ||||||||||||||||||||||||||
54 | ||||||||||||||||||||||||||
55 | ||||||||||||||||||||||||||
56 | ||||||||||||||||||||||||||
57 | ||||||||||||||||||||||||||
58 | ||||||||||||||||||||||||||
59 | ||||||||||||||||||||||||||
60 | ||||||||||||||||||||||||||
61 | ||||||||||||||||||||||||||
62 | ||||||||||||||||||||||||||
63 | ||||||||||||||||||||||||||
64 | ||||||||||||||||||||||||||
65 | ||||||||||||||||||||||||||
66 | ||||||||||||||||||||||||||
67 | ||||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 |