Payment Response No.: PR 01
2
For Payment Claim No.: PC 01
3
For the Period From: 01 March to 31 March 2025
4
Name of Sub-Contractor: Velss Corporation Pte Ltd
5
Project Name: City Square mall
6
Sub-Contract Reference No.:
7
Scope of Works: Sub-contract works for Supply, Installation & Dismantling of Chilled Water System and Accessories
8
S.No.DescriptionTotal QtyUnit Unit Price Total Price Previous Claim QtyPrevious PercenatgePrevious Claim
Amount
Current Month QtyCurrent Month PercentageCurrent Month Claim
Cost (S$)
Cummulative qtyCummulative PercentageCummalative Claim
Cost (S$)
Remarks
9
Chiller Plant Room at B3
10
1Chilled Water Supply and Return Pipe
11
A)Pre-Insulated Chilled Water Pipe , C/W bracket,hanger,accessaries etc.
Thermal Storage Chilled Water Pipe C/W bracket, hanger,accessaries.
Dia 32mm26 M SGD 30.00 SGD 780.00 00% SGD - 0% SGD - 00% SGD -
12
B)Dia 40mm23 M SGD 42.00 SGD 966.00 00% SGD - 0% SGD - 00% SGD -
13
C)Dia 150mm120 M SGD 180.00 SGD 21,600.00 00% SGD - 0% SGD - 00% SGD -
14
D)Dia 200mm210 M SGD 220.00 SGD 46,200.00 00% SGD - 0% SGD - 00% SGD -
15
E)Dia 250mm54 M SGD 250.00 SGD 13,500.00 00% SGD - 0% SGD - 00% SGD -
16
F)Dia 300mm180 M SGD 285.00 SGD 51,300.00 00% SGD - 0% SGD - 00% SGD -
17
G)Dia 350mm68 M SGD 430.00 SGD 29,240.00 00% SGD - 0% SGD - 00% SGD -
18
H)Dia 400mm46 M SGD 445.00 SGD 20,470.00 00% SGD - 0% SGD - 00% SGD -
19
2Chiller Plant Equipments Installation
20
A)Chiller connection and accessories 4 nos SGD 7,400.00 SGD 29,600.00 00% SGD - 0% SGD - 00% SGD -
21
B)Cooling Tower connections (i- Beam Supply and install By others)4 nos SGD 8,400.00 SGD 33,600.00 00% SGD - 0% SGD - 00% SGD -
22
C)Chilled Water Pumps, Piping and accessories module Installation 4 Lot SGD 3,100.00 SGD 12,400.00 00% SGD - 4100% SGD 12,400.00 4100% SGD 12,400.00
23
D)Condensate Water Pumps, Piping and accessories module Installation 4 Lot SGD 3,100.00 SGD 12,400.00 00% SGD - 4100% SGD 12,400.00 4100% SGD 12,400.00
24
E)Autotube Cleaning System, piping and accessories Installation 1 Lot SGD 7,400.00 SGD 7,400.00 00% SGD - 0% SGD - 00% SGD -
25
F)Insulation for Chiller 4 nos SGD 4,200.00 SGD 16,800.00 00% SGD - 0% SGD - 00% SGD -
26
G)PU Insulation & Jacketing for Pump 4 nos SGD 1,100.00 SGD 4,400.00 00% SGD - 0% SGD - 00% SGD -
27
H)PU Insulation & Jacketing for Piping 1 Lot SGD 35,000.00 SGD 35,000.00 00% SGD - 0% SGD - 00% SGD -
28
I)Painting Work1 Lot SGD 12,000.00 SGD 12,000.00 00% SGD - 0% SGD - 00% SGD -
29
3Condenser Water Supply and Return Pipe (B3 to Roof)
30
A)Galvanized Steel Condenser Water Pipe C/W bracket,hanger,accessaries etc.Dia 200mm60 M SGD 220.00 SGD 13,200.00 00% SGD - 0% SGD - 00% SGD -
31
B)Dia 350mm240 M SGD 400.00 SGD 96,000.00 00% SGD - 0% SGD - 00% SGD -
32
C)Dia 400mm40 M SGD 450.00 SGD 18,000.00 00% SGD - 0% SGD - 00% SGD -
33
D) Painting Work1 Lot SGD 10,000.00 SGD 10,000.00 00% SGD - 0% SGD - 00% SGD -
34
4Condensate Water Collection System(B2 GL E1/EJ New Water Tank Room)
35
A)Condensate Collection Tank Installation 1 Lot SGD 1,800.00 SGD 1,800.00 00% SGD - 0% SGD - 00% SGD -
36
B)Condensate water collection pump Installation 2 Lot SGD 1,200.00 SGD 2,400.00 00% SGD - 0% SGD - 00% SGD -
37
C)Galvanized Steel pipe C/W bracket,hanger,accessaries etc.Dia 65mm 70 M SGD 69.00 SGD 4,830.00 00% SGD - 0% SGD - 00% SGD -
38
D)UPVC C/W bracket,hanger,accessaries etc.Dia 100mm 120 M SGD 90.00 SGD 10,800.00 00% SGD - 0% SGD - 00% SGD -
39
E)Painting Work1 Lot SGD 3,800.00 SGD 3,800.00 00% SGD - 0% SGD - 00% SGD -
40
5Make-up water pipe
41
A)Make up water pump installation 1 Lot SGD 2,600.00 SGD 2,600.00 00% SGD - 0% SGD - 00% SGD -
42
B)Galvanized Steel pipe C/W bracket,hanger,accessaries etc.Dia 40mm 95 M SGD 30.00 SGD 2,850.00 00% SGD - 0% SGD - 00% SGD -
43
C)Dia 80mm 85 M SGD 74.00 SGD 6,290.00 00% SGD - 0% SGD - 00% SGD -
44
D)Painting Work1 Lot SGD 4,500.00 SGD 4,500.00 00% SGD - 0% SGD - 00% SGD -
45
6Side Filtration System
46
A)Side Filtration System Installation 1 Lot SGD 3,700.00 SGD 3,700.00 00% SGD - 0% SGD - 00% SGD -
47
B)Galvanized Steel pipe C/W bracket,hanger,accessaries etc.Dia 125mm 78 M SGD 125.00 SGD 9,750.00 00% SGD - 0% SGD - 00% SGD -
48
C)Painting Work1 Lot SGD 6,500.00 SGD 6,500.00 00% SGD - 0% SGD - 00% SGD -
49
7Pressure Maintenance System
50
A)Pressure Maintenance System Installation 1 lot SGD 1,800.00 SGD 1,800.00 00% SGD - 0% SGD - 00% SGD -
51
B)Galvanized Steel pipe C/W bracket,hanger,accessaries etc.Dia 25mm 45 M SGD 22.00 SGD 990.00 00% SGD - 0% SGD - 00% SGD -
52
C)Painting Work1 Lot SGD 1,500.00 SGD 1,500.00 00% SGD - 0% SGD - 00% SGD -
53
8Water Treatment System
54
A)Water Treatment System Installation 1 lot SGD 3,500.00 SGD 3,500.00 00% SGD - 0% SGD - 00% SGD -
55
B)Galvanized Steel pipe C/W bracket,hanger,accessaries etc.Dia 25mm 86 M SGD 22.00 SGD 1,892.00 00% SGD - 0% SGD - 00% SGD -
56
C)Painting Work1 Lot SGD 2,807.00 SGD 2,807.00 00% SGD - 0% SGD - 00% SGD -
57
9FCU
58
A)FCU connection Ducted/Cassette FCU-,FCU installation,Pipe Connection Including Assessaries installation3 Nos SGD 550.00 SGD 1,650.00 00% SGD - 0% SGD - 00% SGD -
59
B) FCU-Insulation For Valves and Pipes3 Nos SGD 250.00 SGD 750.00 00% SGD - 0% SGD - 00% SGD -
60
Sub-Total For Chiller Plant Room SGD 559,565.00 SGD - SGD 24,800.00 SGD 24,800.00
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100