Project - X
2
ItemDescriptionQtyUnitUnit RateAmount
3
SARSAR
4
5
DIVISION - 2
6
SITE WORKS
7
8
1EARTHWORKS
9
Excavation for foundations and for all other items commencing at the ground level down to the levels mentioned in drawings as per soil reports and all to the satisfaction of the Engineer.
630M325.20015,876.000
10
11
2
Backfilling with approved materials to the levels mentioned in drawings as per soil reports and all to the satisfaction of the Engineer.
1250M322.80028,500.000
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
Excluding items 1,2
53
Carried to collection44,376.000
54
55
DIVISION - 2
56
57
SITE WORKS
58
59
SUMMARY44,376.000
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
.
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100