Schedule I: Plant and Mandatory Spare Parts
3
4
Unit Prices / Rates
Total Prices
5
Supplied
Locally
Supplied from outside the
Purchaser’s Country
PriceSupplied LocallySupplied from outside the
Purchaser’s Country
Price
6
Component
No.
Component
Description
AcronymsCountry
of Origin
Code
Quantity[ insert:
local
currency
]
[ insert:
local
currency
]
EUR/USD[ insert:
local
currency
]
[ insert:
local
currency
]
EUR/USD
7
1Hardware NCC 1 / Datacenter 1
8
1.1Administration Server with Relational Database ADS1
9
1.2Historical ServerHIS1
10
1.3Information Model Management Server IMM 1
11
1.4Real Time Communication ServerRTC1
12
1.5WEB ServerWB
13
1.6Virtual Netwrok Communication Server for the Provider's services (Maintenance link)VNC1
14
1.7Transmission Netwrok Applications serversTNA1
15
1.8Energy Management forecasting, planning and schedulling Server jROS analog1
16
1.9User Interface serverUI1
17
1.10Operator Training Simulator ServerOTS1
18
1.11Development and Test ServerDVTS1
19
1.12Data Backup SeverBACK1
20
1.13Data StorageSTOR1
21
1.14Independent Front-End Server for external connections in DMZIFS1
22
1.15ICCP server in DMZICCP1
23
1.16Server for communication to MEL IT network in DMZ COMM1
24
1.17Corporate Historical Server in DMZ zoneCorp HIS1
25
1.18Workstation with 4xLED 24-inch monitors for DispatchersWS-DSP4
26
1.19Workstation with 4xLED 24-inch monitors for Operator Training SystemWS-OTS4
27
1.20Workstation with 2xLED 24-inch monitors for System AdministratorWS-SAM3
28
1.21Workstation with 2xLED 24-inch monitors for Development and TestWS-DVTS3
29
1.22Workstation with 2xLED 24-inch monitors for Operating PlanningWS-OPPL2
30
1.23Workstation with 1xLED 24-inch monitors for BARCO Projection SystemWS-WALL1
31
1.24Remote Terminals WS-RM40
32
1.25Printer A4 color1
33
1.2624-port Switch SCADA in NCC14
34
1.27Router SCADA LAN in NCC12
35
1.28Firewall4
36
1.29Time and Frequency System Server0
37
1.30Other hardaware necessary for system operationspecify
38
1.31Cabinet with the HW preinsalled and prewired specify
39
1.32Cables, MCBs, FO cables and patchcords, patch panels and other accessories necessary for the system operation (lot)1
40
41
2Hardware NCC 2 / Datacenter 2
42
2.1Administration Server with Relational Database ADS1
43
2.2Historical ServerHIS1
44
2.3Information Model Management Server IMM 1
45
2.4Real Time Communication ServerRTC1
46
2.5WEB ServerWB
47
2.6Virtual Netwrok Communication Server for the Provider's services (Maintenance link)VNC1
48
2.7Transmission Netwrok Applications serversTNA1
49
2.8Energy Management forecasting, planning and schedulling Server jROS analog1
50
2.9User Interface serverUI1
51
2.10Development and Test ServerDVTS1
52
2.11Dat Backup SeverBACK1
53
2.12Data StorageSTOR1
54
2.13Independent Front-End Server for external connections in DMZIFS1
55
2.14ICCP server in DMZICCP1
56
2.15Server for communication to MEL IT network in DMZ COMM1
57
2.16Corporate Historical Server in DMZ zoneCorp HIS1
58
2.17Workstation with 4xLED 24-inch monitors for DispatchersWS-DSP2
59
2.18Workstation with 2xLED 24-inch monitors for System AdministratorWS-SAM1
60
2.19Workstation with 2xLED 24-inch monitors for Operating Planning & MMSWS-OPPL1
61
2.20Workstation with 1xLED 24-inch monitors for Large Screen Projection System (Optional)WS-WALL1
62
2.21Remote Terminals WS-RM20
63
2.22Printer A4 color1
64
2.2324-port Switch SCADA in NCC24
65
2.24Router SCADA LAN in NCC22
66
2.25Firewall4
67
2.26Time and Frequency System Server1
68
2.27Other hardaware necessary for system operationspecify
69
2.28Cabinet with the HW preinstalled and prewiredspecify
70
2.29Cables, MCBs, FO cables and patchcords, patch panels and other accessories necessary for the system operation (lot)1
71
72
3Hardware for Regional Control Center (RCC)
73
3.1Workstation with 4xLED 24-inch monitors for Dispatchers4
74
3.21xLED 80-inch monitors (Optional)
75
3.312-port Switch SCADA in 4 RCCs8
76
77
4Hardware for Local Control Center (LCC)
78
4.1Workstation with 2xLED 24-inch monitors for Dispatchers14
79
4.212-port Switch SCADA in 14 LCCs28
80
81
5Software and Licenses
82
5.1SCADA software (lot)1
83
5.2 NCC1/DC1 software and applications (lot)1
84
Bidder is to specify 1
85
5.3NCC2/DC2 software and applications (lot)1
86
Bidder is to specify 1
87
88
6Large Screen Rear Projection System for NCC2 (Optional)1
89
including graphic controller for the large screen rear projection system providing access to the projection system from all dispatcher workplaces.
90
91
7Mandatory Spare Parts
92
7.1Workstation for dispatchers with 4 monitors 2
93
7.2Monitors 24-inch LED20
94
7.3Workstation with 4xLED 24-inch monitors (for 4 power plants)4
95
7.4Controller of the Large Screen Rear Projection system (Optional)1
96
7.5Lamps for the Large Screen Rear Projection system (Optional)4
97
98
Summary to Schedule 1:
99
100