INTRODUCTION
2
3
This worksheet is designed to help each project team:
4
- capture and share the key details of the project
5
- clarify who is responsible for various details
6
- identify who should be involved at different points in the design and construction process
7
- highlight questions or areas where further clarification is needed
8
- design and conduct specialized trainings with the project team at each stage of the construction process specific to Passive House
9
10
How to use this tool:
11
1. Make sure you're signed in to Google, then click File > Make a copy.
12
2. Save a copy specific to your project (example: Save As... "Boston Commons Phase 1 Project Worksheet")
13
3. Share with all the members of your project team.
14
15
This worksheet does not replace detailed drawings or specifications, but rather condenses key pieces of information into a short format that is easily shareable with trades contractors and everyone on the project team.
16
17
The green Project Worksheet tabs should be filled out at the initial Project Kickoff and updated throughout the project as details are finalized. It is designed to walk your team through the steps of an integrated design process where the General Contractor/Construction Manager is involved from the very beginning (vs. design-bid-build).
18
19
The blue Training Template tabs provide goals, prep, sample agendas,and links to resources for each of the recommended trainings.
20
21
This document is designed to be versatile and easily editable, so you can customize it for the particulars of your project.
22
23
This Workbook Includes:
24
Project Worksheets (customizable for your project):
25
Project Contacts
26
Certification
27
Milestones
28
Assemblies
29
MEP Details
30
Compartmentalization Plan
31
Training Templates with agendas and resources for trainings:
32
Project Kickoff
33
Construction Kickoff
34
Envelope/Air Sealing
35
MEP
36
Blower Door
37
Compartmentalization
38
Resources tab includes links to other training resources
39
Resources
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Loading...