Estimate of Materials and Cost of Construction
3
4
Date:SummaryAmount
5
Project:Subtotal $ -
6
Project Location:
Profit/Overhead
$ -
7
Total $ -
8
9
Summary
10
11
LABOR COSTMATERIAL COSTTRADE COST
12
DIV-01GENERAL $ - $ - $ -
13
DIV-02SELECTIVE REMOVALS AND DEMOLITIONS $ - $ - $ -
14
DIV-03CONCRETE $ - $ - $ -
15
DIV-04UNIT MASONRY $ - $ - $ -
16
DIV-05METALS $ - $ - $ -
17
DIV-06WOOD, PLASTICS & COMPOSITES $ - $ - $ -
18
DIV-07THERMAL & MOISTURE PROTECTION $ - $ - $ -
19
DIV-08OPENINGS $ - $ - $ -
20
DIV-09FINISHES $ - $ - $ -
21
DIV-10SPECIALITIES $ - $ - $ -
22
DIV-12FURNISHINGS $ -
23
DIV-14CONVEYING EQUIPMENT $ -
24
DIV-21FIRE SUPPRESSION $ -
25
DIV-22PLUMBING $ - $ - $ -
26
DIV-23(HVAC) HEATING VENTILATING & AIR CONDITIONING $ - $ - $ -
27
DIV-26ELECTRICAL $ - $ - $ -
28
DIV-31EARTHWORK $ - $ - $ -
29
DIV-32EXTERIOR IMPROVEMENTS $ - $ - $ -
30
$ - $ - $ -
31
INSURANCE0% $ - $ - $ -
32
OVERHEAD AND PROFIT20% $ - $ - $ -
33
TOTAL BASE BID $ -
34
35
Detailed Estimate
36
37
38
ITEM #REF. SHEETDETAILCSI SECTDESCRIPTIONQTY.WASTAGEQTY WITH
WASTAGE
UNITUNIT LABOR COSTTOTAL LABOR COSTUNIT MATERIAL COSTTOTAL MATERIAL COSTUNIT ITEM COSTTOTAL ITEM COSTTRADE COST
39
DIV-01GENERAL $ - $ - $ -
40
41
1Permit 1 0% 1 LS $ - $ - $ - $ -
42
2Supervision 1 0% 1 LS $ - $ - $ - $ -
43
3Final Cleanup 1 0% 1 LS $ - $ - $ - $ -
44
4Mobilization Cost 1 0% 1 LS $ - $ - $ - $ -
45
5Project Overheads 1 0% 1 LS $ - $ - $ - $ -
46
6Bonds 1 0% 1 LS $ - $ - $ - $ -
47
7Fees (Architect & Engineer) 1 0% 1 LS $ - $ - $ - $ -
48
8Temporary Control & Facilities 1 0% 1 LS $ - $ - $ - $ -
49
50
DIV-02SELECTIVE REMOVALS AND DEMOLITIONS $ - $ - $ -
51
52
9Cleaning, grubbing and removals from site
Note: VIF the exact scope
1 0% 1 LS $ - $ - $ - $ -
53
54
DEMOLITION
55
10CS1REMOVE EXISTING STREET SIGN10% 1 EA $ - $ - $ - $ -
56
11REMOVE EXISTING TREE10% 1 EA $ - $ - $ - $ -
57
58
DIV-03CONCRETE $ - $ - $ -
59
60
CONCRETE FOOTING
61
12A1.1-A4.312X12X12 FOOTING 0.04 5% 0.04 CY $ - $ - $ - $ -
62
3X3 FOOTING 0.33 5% 0.35 CY $ - $ - $ - $ -
63
1'DEEP AND 3'-0"W FOOTING WITH #5 @ 12" O.C. EACH WAY BOTTOM 15.67 5% 16.45 CY $ - $ - $ - $ -
64
65
PIER
66
1312" DIA CONCRETE PIER 0.09 5% 0.09 CY $ - $ - $ - $ -
67
68
WALL
69
14A1.1-A4.310" THK CONCRETE WALL @ 6'-4" HT
#4 @ 48" O.C.
2 # 5 TOP AND BOTTOM BARS
27 5% 29 CY $ - $ - $ - $ -
70
71
SLAB
72
155" THK CONCRETE SLAB W/ 6X6 10/10 WWF ON 6" MIL. VAPOR BARRIER OVER 4" WELL COMPACTED GRAVEL FILL 913 5% 959 SF $ - $ - $ - $ -
73
74
FORMWORK
75
16A1.1-A4.3FORMWORK PROVIDED FOR CONCRETE WORK 2,084 5% 2,188 SF $ - $ - $ - $ -
76
77
DIV-04MASONRY $ - $ - $ -
78
79
MASONRY
80
17A1.1-A4.3STONE LINER 150 5% 157 LF $ - $ - $ - $ -
81
18STONE COPING 144 5% 151 LF $ - $ - $ - $ -
82
19WINDOW SILL 113 5% 118 LF $ - $ - $ - $ -
83
84
DIV-05METALS $ - $ - $ -
85
86
87
METAL LINTELS/BEAMS
88
20A1.1-A4.3L1: L-6X3 1/2X5/16 40 5% 42 LF $ - $ - $ - $ -
89
21L2: L-5X3 1/2X5/16 58 5% 60 LF $ - $ - $ - $ -
90
22L3: L-3-1/2X3-1/2X5/16 57 5% 59 LF $ - $ - $ - $ -
91
231/4" STEEL PL FLICTH BEAM 29 5% 30 LF $ - $ - $ - $ -
92
93
CHANELS
94
24MC6 X 8.2 @ 16"O.C 15 5% 16 LF $ - $ - $ - $ -
95
25A1.1-A4.3MC10X15.3 15 5% 15 LF $ - $ - $ - $ -
96
97
STEEL POSTS
98
264X4X5/16 STEEL POST @ 9' HT 1 5% 1 EA $ - $ - $ - $ -
99
27A1.1-A4.36" DIA HSS PREFAB STEEL POST @ 3'HT 1 5% 1 EA $ - $ - $ - $ -
100