2019 FLOOD AFFECTED SCHEMES SCHEMES REPORTED FROM RPMUs AS ON 11/10/2025
2
Sl. No.DistrictGP NameScheme NameType of scheme [ New / KWA /GP Rehabitation/ RWH / GravityNumber of Households in the schemeEstimated Amount (in Lakhs)Nature of damage / reason for interruptionWhether Estimate has been subimitted in PMUWhether Estimate has been verified/ Sanctioned from PMUWhether TS has been issuedTS amount (in Lakhs)Expenditure (Lakhs)Present StatusRemarks
3
1IdukkiArakkulamAmrutha BGNew300.25Land sliding - GI pipe line got damagedYesYesYes
4
2IdukkiKanjikuzhypriyadharsiniNew473.35pumbing mainYesYes
5
3IdukkiKanjikuzhyrainbowNew570.85distributionYesYes
6
4IdukkiKanthalloorchengallarNew520.29pipe lineRestored
7
5IdukkiKanthalloorchurakkulamNew1910.19pipe lineRestored
8
6IdukkiKanthallooredakkadavuNew400.13pipe lineRestored
9
7IdukkiKanthalloorguhanathapuramNew690.21pipe lineRestored
10
8IdukkiKanthalloorOLH colonyNew1370.17pipe lineRestored
11
9IdukkiKanthalloorpious nagarNew1420.15pipe lineRestored
12
10IdukkiKonnathadyjaihindNew233.5land slide of pond side wall, Motor damage,pumping main & Distribution line damage.YesYes
13
11IdukkiKonnathadyPerinjamkutty jalakanyakaNew - Gravity302pumping main & Distribution line damage.YesYes
14
12IdukkiKonnathadyJalraniNew451.5pumping main , Distribution line damage, main switch complaint.Tank cover damged.YesYes
15
13IdukkiMankulamAiswaryaNew1100.25gravity mainRestored
16
14IdukkiMankulamAmrudhamNew550.3gravity mainRestored
17
15IdukkiMankulamAnakkulamNew520.1gravity mainRestored
18
16IdukkiMankulamAswasNew160.05DistributinRestored
19
17IdukkiMankulamCentral CityNew570.2gravity mainRestored
20
18IdukkiMankulamGangaRehabilitation680.3DistributinRestored
21
19IdukkiMankulamJalakanamNew210.1DistributinRestored
22
20IdukkiMankulamJalaraniNew1072gravity mainRestored
23
21IdukkiMankulamKairaliNew1300.5gravity mainRestored
24
22IdukkiMankulamKaveriNew1160.5gravity mainRestored
25
23IdukkiMankulamKozhiyilakudyNew760.2gravity mainRestored
26
24IdukkiMankulamNavadharaNew890.1gravity mainRestored
27
25IdukkiMankulamNavajeevanNew490.3gravity mainRestored
28
26IdukkiMankulamPerumbankuthuNew2400.2DistributinRestored
29
27IdukkiMankulamSeval kudyNew740.4DistributinRestored
30
28IdukkiMankulamSink kudyNew640.4gravity mainRestored
31
29IdukkiMankulamSnehanidhiNew780.3gravity mainRestored
32
30IdukkiMankulamSreyasiNew191.5pumping main,pump house sourceRestored
33
31IdukkiMankulamVijayasreeRehabilitation520.2gravity mainRestored
34
32IdukkiNedumkandamChembakakuzhiNew860.2Land slidingRestored
35
33IdukkiNedumkandamChembalamettuGP Rehabilitation8828.3Land slipProgressingflood 18 affceted
36
34IdukkiNedumkandamKattikayamNew2694.1Land slidingYesYes
37
35IdukkiNedumkandamPachadykurisuparaNew730.5Flood waterrestored
38
36IdukkiNedumkandamRamakkalmeduNew440.3300 meters pipe line Damaged. Welding, Valve chamber damagedrestored
39
37IdukkiNedumkandamVasukuttanparaRWH1450.4Land slidingYesYes
40
38IdukkiVathikudyAntopuramGP Rehabilitation201.5Damage happened to drianage nearby resource by land slidesource filled with dirty water and mud from drianagerestored
41
39IdukkiVathikudyChinnarNew5933side of the ceckdam (mud place bank of river damage and water flowers through that way damage happened fo filter gallary and pipe lineEstimate to be prepared
42
40IdukkiVathikudyJalaraniNew771Pumbbing main (60 mtr GI and distribution line 85 mtr GI damged due to land sliderestored
43
41IdukkiVathikudyPeriyarvallyGP Rehabilitation961.5Land sliding, GI pipe lines damagedrestored
44
42KottayamTeekoyArukonmala NagapparaNew1040.39Pumphouse work completedYesYesYes0.50
45
43KottayamTeekoyMangalagiriNew890.35Landslide , 90meter GI/PVC pipe supply line damaged including 2 house connectionrestored
46
44KottayamTeekoyMavadiNew560.4Landslide / Structure damaged -repair work is not sufficentYesYesYes0.42work in progress
47
45KottayamTeekoyVazhikkadavNew610.15Landslide / 20 meters 80mm GI pipe line Damagedrestored
48
46KottayamKootikkalJyothiNew1.19YesYesYes1.50work in progressas per the decision taken on the review meeting (29.2.2020) Expenditure should met from project savings
49
50
51
52
53
54
55
47KozhikkodeChakkittappraChembanoda SJVPNew500.85YesYes
56
48KozhikkodeChakkittappraMavattamNew1.8YesYes
57
49MalappuramParappurKizhakakekunduNew740.4*As flood water not recede pumping not started. * Power Transmission line not charged. *After charging the line data regarding disrupted connection can be find out.
58
50MalappuramParappurParappur Jalanidhi WSSNew4790.36
59
51MalappuramParappurCholakundu Jalanidhi WSSNew6711.3
60
52MalappuramParappurIllipulakkal AssaripadiGP Rehabilitation3102.15
61
53MalappuramParappurMinistadiumGP Rehabilitation1710.67
62
54MalappuramParappurPalaniGP Rehabilitation3570.85
63
55MalappuramParappurChenakkal KundadGP Rehabilitation3881.1
64
56MalappuramParappurKuzhipuramGP Rehabilitation3501.95
65
57MalappuramParappurKurikkal BazarGP Rehabilitation3500.87
66
58MalappuramParappurAzad NagarGP Rehabilitation1830.4
67
59MalappuramParappurIringallur Multi GP WSSBWSS11000.4KWA not started pumping
68
60MalappuramKaruvaarakundMulti BG WSS to CherumbaNew4070.31Transformer installed for the scheme get damaged in floodRestoredflood 18 affceted
69
61MalappuramKaruvaarakundMulti BG WSS to PulvettaGP Rehabitation4820.5No major damages noticed in pumping main and distribution system.
70
62MalappuramKaruvaarakundSMS PanamcholaGP Rehabitation550.54Panel board and pump set damaged due to lightningYesYes
71
63MalappuramKaruvaarakundCherumba Check DamGWR0.38- Natural Calamities in Karuvarakund GP, Restoration works for Damaged structures in Cherumba Check Dam Near Source for Multi BG WSS to Cherumba at Cherippadi in Ward No.7 of Karuvarakund Grama PanchayathYesYesRestoredflood 18 affceted
72
64MalappuramUrangattiriLWSS UrangattiriNew35343.2Scheme is not fully recovered from flood water, panel board and pumpsets has to be checked ,power transmission main is not charged .Data regarding disrupted house connection can be find out only after charging the line .YesYesYes25.7526.03Restored
73
65KannurAralamAralam LWSSNew5250.1100mm DI Joint Damaged, 25mm Pvc Destroyed By Collapse Of Compound WallYesYes
74
66KannurAralamBlock 11New2510.2Pumping Main 50mm GI ( In The River Portion Destroyed)YesYes
75
67KannurAlakkodeManthattu WssNew480.5Distribution Line (Zone A) Completely DestroyedYesYes
76
68KannurAlakkodeRayarom SlecNew8431.85Well Cleaning,Pumpset Repair,Panel Board RepairYesYes
77
69KannurAlakkodeKaruvanchalNew1240.7Well Cleaning,Retaing Wall Repair WorksYesYes
78
70KannurCherupuzhaManjakkad CDCheck damNA2.6Side Wall Of Check Dam DestroedYesYes
79
71KannurCherupuzhaChapparamthattu CDCheck damNA9.4Dr Check Dam Completely Washed AwayYesYes
80
72KannurCherupuzhaCheekad KottakunnuNew880.2Muddy Water Entered The Well During Flood Hence To Be CleanedYesYesrestored
81
73KannurCherupuzhaKundayamthoduNew470.2Muddy Water Entered The Well During Flood Hence To Be CleanedYesYesrestored
82
74KannurCherupuzhaBhoothanamNew740.2Muddy Water Entered The Well During Flood Hence To Be CleanedYesYesrestored
83
75KannurCherupuzhaPerumkudalNew580.20Muddy Water Entered The Well During Flood Hence To Be CleanedYesYesrestored
84
76KannurCherupuzhaNarambaNew480.20Muddy Water Entered The Well During Flood Hence To Be CleanedYesYesrestored
85
77KannurCherupuzhaPerumthadamNew510.20Muddy Water Entered The Well During Flood Hence To Be CleanedYesYesrestored
86
78KannurCherupuzhaChapparathattuNew520.20Muddy Water Entered The Well During Flood Hence To Be CleanedYesYesrestored
87
79KannurCherupuzhaManjakkadNew540.20Muddy Water Entered The Well During Flood Hence To Be CleanedYesYesrestored
88
80KannurCherupuzhaKozhichal MeenthulliNew580.20Muddy Water Entered The Well During Flood Hence To Be CleanedYesYesrestored
89
81KannurCherupuzhaUmayamchalNew530.20Muddy Water Entered The Well During Flood Hence To Be CleanedYesYesrestored
90
82KannurKuttiyattoorNedukulam WssNew2864.20Pump House Was Partually Submersed In The Flood. The Panel Board , Robotic Control Unit Of 25Hp Motor Was Completely DamagedYesYesrestored
91
83KannurKuttiyattoorPavannoor WssNew872.00Pump House Was Partually Submersed In The Flood. The Panel Board , Robotic Control Unit Of 10Hp Motor Was Completely DamagedYesYesrestored
92
84KasaragodMeenjaBaliyoorNew1324.1020Hp Pumpset Fully Damaged,Repair Works Not Possible,New Pumpset Proposed,Panel Board Ok,YesYes
93
85KasaragodMeenjaDhoomrakkadNew871.95Retaing Wall Damged Repair Works In 20M RequiredYesYes
94
86KasaragodMeenjaEliyanaNew891.52Retaing Wall Damged Recontruction Works In 13 M RequiredYesYes
95
87KasaragodMeenjaBudriyaNew1570.55During The Monsson Rains 2019 Pumping Main To Attagoli Tank Across The River Was Damaged , And Retaing Wall Was Damaged At Bottom Portions.YesYes
96
88KasaragodPullur PeriyaPullur Periya - Thaniyadi CDCheck dam/Thanniyadi WSSNA6.00Gabion Provided In Dowstrem Had Been Damaged Due To 2019 Flood,Repair Tightening Of Net May Not Be Withstand In Next Season,Henece Rcc 1:2:4 Is Proposed For68 M Length 5M Width And .2M Depth.YesYes
97
89KasaragodPadannaMR VHSSNew60015.00well collapsedYesYes
98
90WayanadThondernaduMavallyNew5300.50Panel board of 25 HP Pump sets (2 Nos) submerged is to be replaced with new one.YesYesRestored
99
91WayanadThondernaduPoorinjiNew1681.50Gravity main leaks, 63mm HDPE 600m pipe to be replaced and check dam is fully filled with mud, to be cleared.YesYesPartially Restored
100
92WayanadVellamundaMangalasseryNew1311.70check dam need to be desilted, 80mm 18.00 m GI pipe damaged 10 nos of anchor blocks of size 50*50*50 cm is to be constructed ,distribution line leakage rectification, filter media need to be re-packed , additional air valves and controlling valves requiredYesYesyes1.601.02Restored