1 | 2019 FLOOD AFFECTED SCHEMES SCHEMES REPORTED FROM RPMUs AS ON | 11/10/2025 | |||||||||||||||||||||||||
2 | Sl. No. | District | GP Name | Scheme Name | Type of scheme [ New / KWA /GP Rehabitation/ RWH / Gravity | Number of Households in the scheme | Estimated Amount (in Lakhs) | Nature of damage / reason for interruption | Whether Estimate has been subimitted in PMU | Whether Estimate has been verified/ Sanctioned from PMU | Whether TS has been issued | TS amount (in Lakhs) | Expenditure (Lakhs) | Present Status | Remarks | ||||||||||||
3 | 1 | Idukki | Arakkulam | Amrutha BG | New | 30 | 0.25 | Land sliding - GI pipe line got damaged | Yes | Yes | Yes | ||||||||||||||||
4 | 2 | Idukki | Kanjikuzhy | priyadharsini | New | 47 | 3.35 | pumbing main | Yes | Yes | |||||||||||||||||
5 | 3 | Idukki | Kanjikuzhy | rainbow | New | 57 | 0.85 | distribution | Yes | Yes | |||||||||||||||||
6 | 4 | Idukki | Kanthalloor | chengallar | New | 52 | 0.29 | pipe line | Restored | ||||||||||||||||||
7 | 5 | Idukki | Kanthalloor | churakkulam | New | 191 | 0.19 | pipe line | Restored | ||||||||||||||||||
8 | 6 | Idukki | Kanthalloor | edakkadavu | New | 40 | 0.13 | pipe line | Restored | ||||||||||||||||||
9 | 7 | Idukki | Kanthalloor | guhanathapuram | New | 69 | 0.21 | pipe line | Restored | ||||||||||||||||||
10 | 8 | Idukki | Kanthalloor | OLH colony | New | 137 | 0.17 | pipe line | Restored | ||||||||||||||||||
11 | 9 | Idukki | Kanthalloor | pious nagar | New | 142 | 0.15 | pipe line | Restored | ||||||||||||||||||
12 | 10 | Idukki | Konnathady | jaihind | New | 23 | 3.5 | land slide of pond side wall, Motor damage,pumping main & Distribution line damage. | Yes | Yes | |||||||||||||||||
13 | 11 | Idukki | Konnathady | Perinjamkutty jalakanyaka | New - Gravity | 30 | 2 | pumping main & Distribution line damage. | Yes | Yes | |||||||||||||||||
14 | 12 | Idukki | Konnathady | Jalrani | New | 45 | 1.5 | pumping main , Distribution line damage, main switch complaint.Tank cover damged. | Yes | Yes | |||||||||||||||||
15 | 13 | Idukki | Mankulam | Aiswarya | New | 110 | 0.25 | gravity main | Restored | ||||||||||||||||||
16 | 14 | Idukki | Mankulam | Amrudham | New | 55 | 0.3 | gravity main | Restored | ||||||||||||||||||
17 | 15 | Idukki | Mankulam | Anakkulam | New | 52 | 0.1 | gravity main | Restored | ||||||||||||||||||
18 | 16 | Idukki | Mankulam | Aswas | New | 16 | 0.05 | Distributin | Restored | ||||||||||||||||||
19 | 17 | Idukki | Mankulam | Central City | New | 57 | 0.2 | gravity main | Restored | ||||||||||||||||||
20 | 18 | Idukki | Mankulam | Ganga | Rehabilitation | 68 | 0.3 | Distributin | Restored | ||||||||||||||||||
21 | 19 | Idukki | Mankulam | Jalakanam | New | 21 | 0.1 | Distributin | Restored | ||||||||||||||||||
22 | 20 | Idukki | Mankulam | Jalarani | New | 107 | 2 | gravity main | Restored | ||||||||||||||||||
23 | 21 | Idukki | Mankulam | Kairali | New | 130 | 0.5 | gravity main | Restored | ||||||||||||||||||
24 | 22 | Idukki | Mankulam | Kaveri | New | 116 | 0.5 | gravity main | Restored | ||||||||||||||||||
25 | 23 | Idukki | Mankulam | Kozhiyilakudy | New | 76 | 0.2 | gravity main | Restored | ||||||||||||||||||
26 | 24 | Idukki | Mankulam | Navadhara | New | 89 | 0.1 | gravity main | Restored | ||||||||||||||||||
27 | 25 | Idukki | Mankulam | Navajeevan | New | 49 | 0.3 | gravity main | Restored | ||||||||||||||||||
28 | 26 | Idukki | Mankulam | Perumbankuthu | New | 240 | 0.2 | Distributin | Restored | ||||||||||||||||||
29 | 27 | Idukki | Mankulam | Seval kudy | New | 74 | 0.4 | Distributin | Restored | ||||||||||||||||||
30 | 28 | Idukki | Mankulam | Sink kudy | New | 64 | 0.4 | gravity main | Restored | ||||||||||||||||||
31 | 29 | Idukki | Mankulam | Snehanidhi | New | 78 | 0.3 | gravity main | Restored | ||||||||||||||||||
32 | 30 | Idukki | Mankulam | Sreyasi | New | 19 | 1.5 | pumping main,pump house source | Restored | ||||||||||||||||||
33 | 31 | Idukki | Mankulam | Vijayasree | Rehabilitation | 52 | 0.2 | gravity main | Restored | ||||||||||||||||||
34 | 32 | Idukki | Nedumkandam | Chembakakuzhi | New | 86 | 0.2 | Land sliding | Restored | ||||||||||||||||||
35 | 33 | Idukki | Nedumkandam | Chembalamettu | GP Rehabilitation | 88 | 28.3 | Land slip | Progressing | flood 18 affceted | |||||||||||||||||
36 | 34 | Idukki | Nedumkandam | Kattikayam | New | 269 | 4.1 | Land sliding | Yes | Yes | |||||||||||||||||
37 | 35 | Idukki | Nedumkandam | Pachadykurisupara | New | 73 | 0.5 | Flood water | restored | ||||||||||||||||||
38 | 36 | Idukki | Nedumkandam | Ramakkalmedu | New | 44 | 0.3 | 300 meters pipe line Damaged. Welding, Valve chamber damaged | restored | ||||||||||||||||||
39 | 37 | Idukki | Nedumkandam | Vasukuttanpara | RWH | 145 | 0.4 | Land sliding | Yes | Yes | |||||||||||||||||
40 | 38 | Idukki | Vathikudy | Antopuram | GP Rehabilitation | 20 | 1.5 | Damage happened to drianage nearby resource by land slidesource filled with dirty water and mud from drianage | restored | ||||||||||||||||||
41 | 39 | Idukki | Vathikudy | Chinnar | New | 593 | 3 | side of the ceckdam (mud place bank of river damage and water flowers through that way damage happened fo filter gallary and pipe line | Estimate to be prepared | ||||||||||||||||||
42 | 40 | Idukki | Vathikudy | Jalarani | New | 77 | 1 | Pumbbing main (60 mtr GI and distribution line 85 mtr GI damged due to land slide | restored | ||||||||||||||||||
43 | 41 | Idukki | Vathikudy | Periyarvally | GP Rehabilitation | 96 | 1.5 | Land sliding, GI pipe lines damaged | restored | ||||||||||||||||||
44 | 42 | Kottayam | Teekoy | Arukonmala Nagappara | New | 104 | 0.39 | Pumphouse work completed | Yes | Yes | Yes | 0.50 | |||||||||||||||
45 | 43 | Kottayam | Teekoy | Mangalagiri | New | 89 | 0.35 | Landslide , 90meter GI/PVC pipe supply line damaged including 2 house connection | restored | ||||||||||||||||||
46 | 44 | Kottayam | Teekoy | Mavadi | New | 56 | 0.4 | Landslide / Structure damaged -repair work is not sufficent | Yes | Yes | Yes | 0.42 | work in progress | ||||||||||||||
47 | 45 | Kottayam | Teekoy | Vazhikkadav | New | 61 | 0.15 | Landslide / 20 meters 80mm GI pipe line Damaged | restored | ||||||||||||||||||
48 | 46 | Kottayam | Kootikkal | Jyothi | New | 1.19 | Yes | Yes | Yes | 1.50 | work in progress | as per the decision taken on the review meeting (29.2.2020) Expenditure should met from project savings | |||||||||||||||
49 | |||||||||||||||||||||||||||
50 | |||||||||||||||||||||||||||
51 | |||||||||||||||||||||||||||
52 | |||||||||||||||||||||||||||
53 | |||||||||||||||||||||||||||
54 | |||||||||||||||||||||||||||
55 | 47 | Kozhikkode | Chakkittappra | Chembanoda SJVP | New | 50 | 0.85 | Yes | Yes | ||||||||||||||||||
56 | 48 | Kozhikkode | Chakkittappra | Mavattam | New | 1.8 | Yes | Yes | |||||||||||||||||||
57 | 49 | Malappuram | Parappur | Kizhakakekundu | New | 74 | 0.4 | *As flood water not recede pumping not started. * Power Transmission line not charged. *After charging the line data regarding disrupted connection can be find out. | |||||||||||||||||||
58 | 50 | Malappuram | Parappur | Parappur Jalanidhi WSS | New | 479 | 0.36 | ||||||||||||||||||||
59 | 51 | Malappuram | Parappur | Cholakundu Jalanidhi WSS | New | 671 | 1.3 | ||||||||||||||||||||
60 | 52 | Malappuram | Parappur | Illipulakkal Assaripadi | GP Rehabilitation | 310 | 2.15 | ||||||||||||||||||||
61 | 53 | Malappuram | Parappur | Ministadium | GP Rehabilitation | 171 | 0.67 | ||||||||||||||||||||
62 | 54 | Malappuram | Parappur | Palani | GP Rehabilitation | 357 | 0.85 | ||||||||||||||||||||
63 | 55 | Malappuram | Parappur | Chenakkal Kundad | GP Rehabilitation | 388 | 1.1 | ||||||||||||||||||||
64 | 56 | Malappuram | Parappur | Kuzhipuram | GP Rehabilitation | 350 | 1.95 | ||||||||||||||||||||
65 | 57 | Malappuram | Parappur | Kurikkal Bazar | GP Rehabilitation | 350 | 0.87 | ||||||||||||||||||||
66 | 58 | Malappuram | Parappur | Azad Nagar | GP Rehabilitation | 183 | 0.4 | ||||||||||||||||||||
67 | 59 | Malappuram | Parappur | Iringallur Multi GP WSS | BWSS | 1100 | 0.4 | KWA not started pumping | |||||||||||||||||||
68 | 60 | Malappuram | Karuvaarakund | Multi BG WSS to Cherumba | New | 407 | 0.31 | Transformer installed for the scheme get damaged in flood | Restored | flood 18 affceted | |||||||||||||||||
69 | 61 | Malappuram | Karuvaarakund | Multi BG WSS to Pulvetta | GP Rehabitation | 482 | 0.5 | No major damages noticed in pumping main and distribution system. | |||||||||||||||||||
70 | 62 | Malappuram | Karuvaarakund | SMS Panamchola | GP Rehabitation | 55 | 0.54 | Panel board and pump set damaged due to lightning | Yes | Yes | |||||||||||||||||
71 | 63 | Malappuram | Karuvaarakund | Cherumba Check Dam | GWR | 0.38 | - Natural Calamities in Karuvarakund GP, Restoration works for Damaged structures in Cherumba Check Dam Near Source for Multi BG WSS to Cherumba at Cherippadi in Ward No.7 of Karuvarakund Grama Panchayath | Yes | Yes | Restored | flood 18 affceted | ||||||||||||||||
72 | 64 | Malappuram | Urangattiri | LWSS Urangattiri | New | 3534 | 3.2 | Scheme is not fully recovered from flood water, panel board and pumpsets has to be checked ,power transmission main is not charged .Data regarding disrupted house connection can be find out only after charging the line . | Yes | Yes | Yes | 25.75 | 26.03 | Restored | |||||||||||||
73 | 65 | Kannur | Aralam | Aralam LWSS | New | 525 | 0.1 | 100mm DI Joint Damaged, 25mm Pvc Destroyed By Collapse Of Compound Wall | Yes | Yes | |||||||||||||||||
74 | 66 | Kannur | Aralam | Block 11 | New | 251 | 0.2 | Pumping Main 50mm GI ( In The River Portion Destroyed) | Yes | Yes | |||||||||||||||||
75 | 67 | Kannur | Alakkode | Manthattu Wss | New | 48 | 0.5 | Distribution Line (Zone A) Completely Destroyed | Yes | Yes | |||||||||||||||||
76 | 68 | Kannur | Alakkode | Rayarom Slec | New | 843 | 1.85 | Well Cleaning,Pumpset Repair,Panel Board Repair | Yes | Yes | |||||||||||||||||
77 | 69 | Kannur | Alakkode | Karuvanchal | New | 124 | 0.7 | Well Cleaning,Retaing Wall Repair Works | Yes | Yes | |||||||||||||||||
78 | 70 | Kannur | Cherupuzha | Manjakkad CD | Check dam | NA | 2.6 | Side Wall Of Check Dam Destroed | Yes | Yes | |||||||||||||||||
79 | 71 | Kannur | Cherupuzha | Chapparamthattu CD | Check dam | NA | 9.4 | Dr Check Dam Completely Washed Away | Yes | Yes | |||||||||||||||||
80 | 72 | Kannur | Cherupuzha | Cheekad Kottakunnu | New | 88 | 0.2 | Muddy Water Entered The Well During Flood Hence To Be Cleaned | Yes | Yes | restored | ||||||||||||||||
81 | 73 | Kannur | Cherupuzha | Kundayamthodu | New | 47 | 0.2 | Muddy Water Entered The Well During Flood Hence To Be Cleaned | Yes | Yes | restored | ||||||||||||||||
82 | 74 | Kannur | Cherupuzha | Bhoothanam | New | 74 | 0.2 | Muddy Water Entered The Well During Flood Hence To Be Cleaned | Yes | Yes | restored | ||||||||||||||||
83 | 75 | Kannur | Cherupuzha | Perumkudal | New | 58 | 0.20 | Muddy Water Entered The Well During Flood Hence To Be Cleaned | Yes | Yes | restored | ||||||||||||||||
84 | 76 | Kannur | Cherupuzha | Naramba | New | 48 | 0.20 | Muddy Water Entered The Well During Flood Hence To Be Cleaned | Yes | Yes | restored | ||||||||||||||||
85 | 77 | Kannur | Cherupuzha | Perumthadam | New | 51 | 0.20 | Muddy Water Entered The Well During Flood Hence To Be Cleaned | Yes | Yes | restored | ||||||||||||||||
86 | 78 | Kannur | Cherupuzha | Chapparathattu | New | 52 | 0.20 | Muddy Water Entered The Well During Flood Hence To Be Cleaned | Yes | Yes | restored | ||||||||||||||||
87 | 79 | Kannur | Cherupuzha | Manjakkad | New | 54 | 0.20 | Muddy Water Entered The Well During Flood Hence To Be Cleaned | Yes | Yes | restored | ||||||||||||||||
88 | 80 | Kannur | Cherupuzha | Kozhichal Meenthulli | New | 58 | 0.20 | Muddy Water Entered The Well During Flood Hence To Be Cleaned | Yes | Yes | restored | ||||||||||||||||
89 | 81 | Kannur | Cherupuzha | Umayamchal | New | 53 | 0.20 | Muddy Water Entered The Well During Flood Hence To Be Cleaned | Yes | Yes | restored | ||||||||||||||||
90 | 82 | Kannur | Kuttiyattoor | Nedukulam Wss | New | 286 | 4.20 | Pump House Was Partually Submersed In The Flood. The Panel Board , Robotic Control Unit Of 25Hp Motor Was Completely Damaged | Yes | Yes | restored | ||||||||||||||||
91 | 83 | Kannur | Kuttiyattoor | Pavannoor Wss | New | 87 | 2.00 | Pump House Was Partually Submersed In The Flood. The Panel Board , Robotic Control Unit Of 10Hp Motor Was Completely Damaged | Yes | Yes | restored | ||||||||||||||||
92 | 84 | Kasaragod | Meenja | Baliyoor | New | 132 | 4.10 | 20Hp Pumpset Fully Damaged,Repair Works Not Possible,New Pumpset Proposed,Panel Board Ok, | Yes | Yes | |||||||||||||||||
93 | 85 | Kasaragod | Meenja | Dhoomrakkad | New | 87 | 1.95 | Retaing Wall Damged Repair Works In 20M Required | Yes | Yes | |||||||||||||||||
94 | 86 | Kasaragod | Meenja | Eliyana | New | 89 | 1.52 | Retaing Wall Damged Recontruction Works In 13 M Required | Yes | Yes | |||||||||||||||||
95 | 87 | Kasaragod | Meenja | Budriya | New | 157 | 0.55 | During The Monsson Rains 2019 Pumping Main To Attagoli Tank Across The River Was Damaged , And Retaing Wall Was Damaged At Bottom Portions. | Yes | Yes | |||||||||||||||||
96 | 88 | Kasaragod | Pullur Periya | Pullur Periya - Thaniyadi CD | Check dam/Thanniyadi WSS | NA | 6.00 | Gabion Provided In Dowstrem Had Been Damaged Due To 2019 Flood,Repair Tightening Of Net May Not Be Withstand In Next Season,Henece Rcc 1:2:4 Is Proposed For68 M Length 5M Width And .2M Depth. | Yes | Yes | |||||||||||||||||
97 | 89 | Kasaragod | Padanna | MR VHSS | New | 600 | 15.00 | well collapsed | Yes | Yes | |||||||||||||||||
98 | 90 | Wayanad | Thondernadu | Mavally | New | 530 | 0.50 | Panel board of 25 HP Pump sets (2 Nos) submerged is to be replaced with new one. | Yes | Yes | Restored | ||||||||||||||||
99 | 91 | Wayanad | Thondernadu | Poorinji | New | 168 | 1.50 | Gravity main leaks, 63mm HDPE 600m pipe to be replaced and check dam is fully filled with mud, to be cleared. | Yes | Yes | Partially Restored | ||||||||||||||||
100 | 92 | Wayanad | Vellamunda | Mangalassery | New | 131 | 1.70 | check dam need to be desilted, 80mm 18.00 m GI pipe damaged 10 nos of anchor blocks of size 50*50*50 cm is to be constructed ,distribution line leakage rectification, filter media need to be re-packed , additional air valves and controlling valves required | Yes | Yes | yes | 1.60 | 1.02 | Restored |