InstrumentEquipment StatusNoteLast use of major equipment (Green = OK)
2
GT2 Nanoscribe 3D PrinterYes
Mirror (M8) was reppaced by field site engineer.
08/11/2025
3
NDR4000 Etcher (Modes: RIE and Deep RIE)Yes12/2024: The coolant of the Schiller has been drained and refilled!

08/11/2025
4
Reactive Ion EtcherDownTurbo pump failed.
5
Denton EXPLORER E-beam evaporatorYes
Absorber/ Recharge/ Regeneration: 02/2024 - Pressure: 1E-7 Torr after two hours. Temp rises to 26 Kevin || Noise from Cryo
Reg. 03/15/2024: Done!
Reg. 07/01/2024: Done! T = 13K
Reg. 07/16/2024: T = 14K
Reg. 12/2024 - T = 16 Kelvin - Passed!
Cleaned the e-beam 02/18/202408/11/2025
6
Temescal BJD-1800 E-­beam evaportorDown
Absorber/ Recharge/ Regen.: 02/2024 - Pressure 1.2 E-6 Torr after two hours. Temp 30 K - MP failed and replaced 04/18/2025
Reg. 03/15/2024: Done!
Reg. 07/01/2024: Passed!
Reg. 07/16/2024: T = 30K
(cooling line leakage, fixed) - Reg. 02/18/2024: Done - 30K!
04/25/2025: 3rd reg. in progress! Sam replaced MP. Oil from the MP gets into the vacuum line. After cleaning the vaccuum line and pnuematic valves of fore and raugh lines, 30K after Reg! Keep MP ON 24/7. High Vac valve leaks. Power loss: 05/19/2025: Reg. in progress (Passed)
08/19/2025: Exhust failure caused the failure of MP. The Roughing line is contaminated with black oil. Cleaning the vaccuum line is in progress.
7
ZnO sputterYes07/16/2024
8
Metal sputterYes12/2024
9
Fiji Atomic Layer DepositionYesThe pump has been repaired. The system is being tested - 12/1/2023. Repaired 6/12/2025 by Sam.
10
Karl Suss MA6 Mask AlignerYes04/18/2025
11
Karl Suss MJB3 Mask AlignerYes05/01/2025
12
Karl Suss MJB4 Mask AlignerYes04/30/2025
13
Raith E-beam lithographyDown
14
Solaris 150 Rapid Thermal Process (RTP)Yes
15
Tregeo Plasma CleanerYes5/2025
16
RCA cleanYes
17
Oxidation and diffusion furnacesYes
18
Varian/Cary UV/VIS SpectrophotometerYesIR Detector Down!
19
Atomic force microscopeYes
20
Hall effect measurement systemYes
21
Probe Station(s)Yes
22
Semiconductor analyzer(s)Yes
23
Wire bonderYes
24
Four-probe resistance measuremnetYes
25
Surface profiler XP-100Yes
26
F20 FILMETRICS Thin Film AnalyzerYes
27
GloveboxYes
G1 regenerated - 02/10/2024
G1 regenerated - Replaced three glovess and Catalyst- 12/2024 - needed a second regeneration "Done- passed". 80 ml water!
04/01/2025:P Reg. 40 ml water!
05/22/2025:P Reg. 60 ml water!
06/2025: Reg. of G1 and G2. 80 ml of water! Oxy. H2O < 0.1 ppm.
28
Ocean optics UV-VIS spectrometerYes
29
Wafer dicing sawDownTo relocate to Room 0142 - 12/8/2023
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100